Engineer B Undocumented Alteration Successor Design Engineer

R · Role Individual
http://proethica.org/ontology/case/173#Engineer_B_Undocumented_Alteration_Successor_Design_Engineer
Definition

Retained by the client to review and redesign the subdivision project using Engineer A's sealed plans as a guide. Made major changes to grading plans (deleting a sheet, raising housing pad elevations, rerouting streets) and major design changes to storm drains, pipe dimensions, sewers, and utilities — without documenting any changes, without signing or sealing any sheets, and without communicating with Engineer A. Left Engineer A's seal and signature intact on all sheets, placing only a vague title-sheet note claiming responsibility for unspecified 'revisions.'

Properties
Instance of
UndocumentedAlterationSuccessorDesignEngineer
http://proethica.org/ontology/intermediate#UndocumentedAlterationSuccessorDesignEngineer
Attributes
licenseProfessional Engineer (implied)
specialtySubdivision redesign — grading, storm drainage, utilities
changes_documentedFalse
sheets_signed_by_engineer_bNone
prior_engineer_seal_removedFalse
communication_with_engineer_aNone
Confidence
0.93
Importance
high
Relationships
typepeer_successor_to
targetEngineer A Discharged Original Design Engineer
typeprovider_to_client
targetSubdivision Project Client
Role category
provider_client
Relationships
Source Evidence
Source text
Engineer B was later retained by the client to review and redesign the project

Text references
At no time after Engineer B was retained were there any communications between the two engineers
Engineer B also made major design changes to the storm drains, pipe dimensions, sewers, and utilities
Engineer B did not note what changes were made nor did he sign any of the sheets
Engineer B placed a note on the title sheet of the public improvement plans, leaving Engineer A's signature and seal intact, stating that he, Engineer B, is taking responsibility for the 'revisions of the plans,' making no notation what those changes were
Engineer B reviewed the original drawings, made changes on the grading plans
Engineer B was later retained by the client to review and redesign the project
He made no notation of the changes, did not sign the plans, and left Engineer A's seal and signature intact
TTL
@prefix case173: <http://proethica.org/ontology/case/173#> . @prefix owl: <http://www.w3.org/2002/07/owl#> . @prefix proeth: <http://proethica.org/ontology/intermediate#> . @prefix proeth-core: <http://proethica.org/ontology/core#> . @prefix prov: <http://www.w3.org/ns/prov#> . @prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> . @prefix xsd: <http://www.w3.org/2001/XMLSchema#> . case173:Engineer_B_Undocumented_Alteration_Successor_Design_Engineer a proeth:UndocumentedAlterationSuccessorDesignEngineer, owl:NamedIndividual ; rdfs:label "Engineer B Undocumented Alteration Successor Design Engineer" ; proeth-core:adheresToPrinciple case173:Client_Direction_Does_Not_Authorize_Ethical_Violation_in_Plan_Transfer, case173:Honesty_in_Professional_Representations_Violated_by_Engineer_Bs_Vague_Disclaimer, case173:Inter-Engineer_Communication_Obligation_Violated_by_Engineer_B, case173:Professional_Accountability_of_Engineer_B_for_Redesign_Decisions, case173:Responsible_Charge_Integrity_Violated_by_Engineer_B, case173:Successor_Engineer_Sealed_Plan_Alteration_Without_Attribution_Prohibition_Applied_to_Engineer_B, case173:Vague_Responsibility_Assumption_Insufficiency_Applied_to_Engineer_Bs_Title_Sheet_Note ; proeth-core:hasObligation case173:Engineer_B_Discharged_Engineer_Review_Without_Notification_Permissibility_Case_82-5, case173:Engineer_B_Fundamental_Redesign_Full_Design_Accountability_Assumption_Case_82-5, case173:Engineer_B_Mixed-Authorship_Successor_Design_Attribution_Case_82-5, case173:Engineer_B_Original_Seal_Removal_Upon_Material_Alteration_Grading_Plans, case173:Engineer_B_Original_Seal_Removal_Upon_Material_Alteration_Public_Improvement_Plans, case173:Engineer_B_Post-Discharge_Collegial_Consultation_Prudential_Obligation_Case_82-5, case173:Engineer_B_Public_Welfare_Paramount_Subdivision_Plan_Integrity_Safety_Obligation, case173:Engineer_B_Sealed_Document_Modification_Documentation_Obligation_Case_82-5, case173:Engineer_B_Sealed_Document_Modification_Documentation_Public_Improvement_Plans, case173:Engineer_B_Sealed_Plan_Unsigned_Alteration_Prohibition_Grading_Plans, case173:Engineer_B_Sealed_Plan_Unsigned_Alteration_Prohibition_Public_Improvement_Plans, case173:Engineer_B_Successor_Engineer_Prior-Engineer_Communication_Before_Redesign, case173:Engineer_B_Successor_Redesign_Deceptive_Omission_of_Change_Specificity_Case_82-5, case173:Engineer_B_Vague_Title-Sheet_Disclaimer_Insufficiency_Public_Improvement_Plans ; proeth:attributes "{'license': 'Professional Engineer (implied)', 'specialty': 'Subdivision redesign — grading, storm drainage, utilities', 'changes_documented': False, 'sheets_signed_by_engineer_b': 'None', 'prior_engineer_seal_removed': False, 'communication_with_engineer_a': 'None'}" ; proeth:caseinvolvement "Retained by the client to review and redesign the subdivision project using Engineer A's sealed plans as a guide. Made major changes to grading plans (deleting a sheet, raising housing pad elevations, rerouting streets) and major design changes to storm drains, pipe dimensions, sewers, and utilities — without documenting any changes, without signing or sealing any sheets, and without communicating with Engineer A. Left Engineer A's seal and signature intact on all sheets, placing only a vague title-sheet note claiming responsibility for unspecified 'revisions.'" ; proeth:conceptCategory "Role" ; proeth:confidence "0.93" ; proeth:discoveredincase "173" ; proeth:discoveredinpass "1" ; proeth:discoveredinsection "facts" ; proeth:firstdiscoveredat "2026-03-01T14:15:16.534816+00:00" ; proeth:firstdiscoveredincase "173" ; proeth:generatedattime "2026-03-01T14:15:16.534816+00:00" ; proeth:importance "high" ; proeth:relationships "{'type': 'peer_successor_to', 'target': 'Engineer A Discharged Original Design Engineer'}", "{'type': 'provider_to_client', 'target': 'Subdivision Project Client'}" ; proeth:rolecategory "provider_client" ; proeth:roleclass "Undocumented Alteration Successor Design Engineer" ; proeth:sourcetext "Engineer B was later retained by the client to review and redesign the project" ; proeth:textreferences "At no time after Engineer B was retained were there any communications between the two engineers", "Engineer B also made major design changes to the storm drains, pipe dimensions, sewers, and utilities", "Engineer B did not note what changes were made nor did he sign any of the sheets", "Engineer B placed a note on the title sheet of the public improvement plans, leaving Engineer A's signature and seal intact, stating that he, Engineer B, is taking responsibility for the 'revisions of the plans,' making no notation what those changes were", "Engineer B reviewed the original drawings, made changes on the grading plans", "Engineer B was later retained by the client to review and redesign the project", "He made no notation of the changes, did not sign the plans, and left Engineer A's seal and signature intact" ; proeth:wasattributedto "Case 173 Extraction" ; prov:generatedAtTime "2026-03-01T14:41:54.497043"^^xsd:dateTime ; prov:wasGeneratedBy "ProEthica Case 173 Extraction" .
Metadata
Type
Individual
Last Updated
2026-05-28 16:27
Discovered in case
173
Discovered in pass
1
Discovered in section
facts
First discovered
2026-03-01T14:15:16.534816+00:00
First case
173
Generated
2026-03-01T14:15:16.534816+00:00
Attributed to
Case 173 Extraction
Generated
2026-03-01T14:41:54.497043
Generated by
ProEthica Case 173 Extraction