Engineer B Sealed Plan Unsigned Alteration Prohibition Public Improvement Plans
O · Obligation
Individual
http://proethica.org/ontology/case/173#Engineer_B_Sealed_Plan_Unsigned_Alteration_Prohibition_Public_Improvement_Plans
Properties
Instance of
SuccessorEngineerSealedPlanUnsignedAlterationProhibitionObligation
http://proethica.org/ontology/intermediate#SuccessorEngineerSealedPlanUnsignedAlterationProhibitionObligation
Case context
Engineer B made major design changes to storm drains, pipe dimensions, sewers, and utilities across the 38-sheet public improvement plan set, but did not sign any sheets and left Engineer A's seal and signature intact on all sheets.
Compliance status
unmet
Confidence
0.95
Importance
high
Obligated party
Engineer B
Obligation statement
Engineer B was obligated to sign and seal each sheet of the public improvement plan set that he materially altered — including the cover sheet — and to remove or supersede Engineer A's seal and signature on those sheets, rather than leaving Engineer A's seal intact on sheets containing major design changes to storm drains, pipe dimensions, sewers, and utilities that Engineer A never reviewed.
Temporal scope
Upon making material changes to any sheet of the public improvement plan set
Relationships
Source Evidence
Source text
Engineer B also made major design changes to the storm drains, pipe dimensions, sewers, and utilities in the public improvement plans.
Text references
Engineer B also made major design changes to the storm drains, pipe dimensions, sewers, and utilities in the public improvement plans.
He made no notation of the changes, did not sign the plans, and left Engineer A's seal and signature intact.
TTL
@prefix case173: <http://proethica.org/ontology/case/173#> .
@prefix owl: <http://www.w3.org/2002/07/owl#> .
@prefix proeth: <http://proethica.org/ontology/intermediate#> .
@prefix proeth-core: <http://proethica.org/ontology/core#> .
@prefix prov: <http://www.w3.org/ns/prov#> .
@prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> .
@prefix xsd: <http://www.w3.org/2001/XMLSchema#> .
case173:Engineer_B_Sealed_Plan_Unsigned_Alteration_Prohibition_Public_Improvement_Plans a proeth:SuccessorEngineerSealedPlanUnsignedAlterationProhibitionObligation,
owl:NamedIndividual ;
rdfs:label "Engineer B Sealed Plan Unsigned Alteration Prohibition Public Improvement Plans" ;
proeth-core:defeasibleUnder case173:Engineer_A_Seal_Retained_on_Engineer_B_Altered_Public_Improvement_Plans ;
proeth:casecontext "Engineer B made major design changes to storm drains, pipe dimensions, sewers, and utilities across the 38-sheet public improvement plan set, but did not sign any sheets and left Engineer A's seal and signature intact on all sheets." ;
proeth:compliancestatus "unmet" ;
proeth:conceptCategory "Obligation" ;
proeth:confidence "0.95" ;
proeth:derivedFromPrinciple case173:Responsible_Charge_Integrity_Invoked_for_Engineer_B_Full_Design_Accountability,
case173:Responsible_Charge_Integrity_Violated_by_Engineer_B ;
proeth:discoveredincase "173" ;
proeth:discoveredinpass "2" ;
proeth:discoveredinsection "facts" ;
proeth:firstdiscoveredat "2026-03-01T14:22:55.048341+00:00" ;
proeth:firstdiscoveredincase "173" ;
proeth:generatedattime "2026-03-01T14:22:55.048341+00:00" ;
proeth:importance "high" ;
proeth:obligatedparty "Engineer B" ;
proeth:obligationclass "Successor Engineer Sealed Plan Unsigned Alteration Prohibition Obligation" ;
proeth:obligationstatement "Engineer B was obligated to sign and seal each sheet of the public improvement plan set that he materially altered — including the cover sheet — and to remove or supersede Engineer A's seal and signature on those sheets, rather than leaving Engineer A's seal intact on sheets containing major design changes to storm drains, pipe dimensions, sewers, and utilities that Engineer A never reviewed." ;
proeth:sourcetext "Engineer B also made major design changes to the storm drains, pipe dimensions, sewers, and utilities in the public improvement plans." ;
proeth:temporalscope "Upon making material changes to any sheet of the public improvement plan set" ;
proeth:textreferences "Engineer B also made major design changes to the storm drains, pipe dimensions, sewers, and utilities in the public improvement plans.",
"He made no notation of the changes, did not sign the plans, and left Engineer A's seal and signature intact." ;
proeth:wasattributedto "Case 173 Extraction" ;
prov:generatedAtTime "2026-03-01T14:41:54.502773"^^xsd:dateTime ;
prov:wasGeneratedBy "ProEthica Case 173 Extraction" .
Metadata
Extraction details
Discovered in case
173
Discovered in pass
2
Discovered in section
facts
First discovered
2026-03-01T14:22:55.048341+00:00
First case
173
Generated
2026-03-01T14:22:55.048341+00:00
Attributed to
Case 173 Extraction
Generated
2026-03-01T14:41:54.502773
Generated by
ProEthica Case 173 Extraction