Engineer B made material changes to the grading plans — deleting a sheet, raising housing pad elevations, rerouting streets — but left Engineer A's seal and signature intact on all remaining sheets.
Compliance status
unmet
Confidence
0.92
Importance
high
Obligated party
Engineer B
Obligation statement
Engineer B was obligated to remove or clearly supersede Engineer A's seal and signature on each sheet of the grading plan set that he materially altered, before those plans were submitted to any regulatory authority, contractor, or other party.
Temporal scope
Before submission or use of the altered grading plan set
Source Evidence
Source text
Engineer B reviewed the original drawings, made changes on the grading plans, including deletion of one sheet, raising the elevation of the housing pads and changing routing of the street.

Text references
Engineer B did not note what changes were made nor did he sign any of the sheets, including the cover sheet.
Engineer B reviewed the original drawings, made changes on the grading plans, including deletion of one sheet, raising the elevation of the housing pads and changing routing of the street.
TTL
@prefix case173: <http://proethica.org/ontology/case/173#> . @prefix owl: <http://www.w3.org/2002/07/owl#> . @prefix proeth: <http://proethica.org/ontology/intermediate#> . @prefix proeth-core: <http://proethica.org/ontology/core#> . @prefix prov: <http://www.w3.org/ns/prov#> . @prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> . @prefix xsd: <http://www.w3.org/2001/XMLSchema#> . case173:Engineer_B_Original_Seal_Removal_Upon_Material_Alteration_Grading_Plans a proeth:SuccessorEngineerOriginalSealRemovalUponMaterialSheetAlterationObligation, owl:NamedIndividual ; rdfs:label "Engineer B Original Seal Removal Upon Material Alteration Grading Plans" ; proeth-core:competesWith case173:Engineer_B_Fundamental_Redesign_Full_Design_Accountability_Assumption_Case_82-5 ; proeth-core:defeasibleUnder case173:Engineer_A_Seal_Retained_on_Engineer_B_Altered_Grading_Plans ; proeth-core:prevailsOver case173:Subdivision_Client_Sealed_Plan_Transfer_Non-Authorization_of_Successor_Alteration_Case_82-5 ; proeth:casecontext "Engineer B made material changes to the grading plans — deleting a sheet, raising housing pad elevations, rerouting streets — but left Engineer A's seal and signature intact on all remaining sheets." ; proeth:compliancestatus "unmet" ; proeth:conceptCategory "Obligation" ; proeth:confidence "0.92" ; proeth:derivedFromPrinciple case173:Successor_Engineer_Sealed_Plan_Alteration_Without_Attribution_Prohibition_Applied_to_Engineer_B ; proeth:discoveredincase "173" ; proeth:discoveredinpass "2" ; proeth:discoveredinsection "facts" ; proeth:firstdiscoveredat "2026-03-01T14:22:55.048341+00:00" ; proeth:firstdiscoveredincase "173" ; proeth:generatedattime "2026-03-01T14:22:55.048341+00:00" ; proeth:importance "high" ; proeth:obligatedparty "Engineer B" ; proeth:obligationclass "Successor Engineer Original Seal Removal Upon Material Sheet Alteration Obligation" ; proeth:obligationstatement "Engineer B was obligated to remove or clearly supersede Engineer A's seal and signature on each sheet of the grading plan set that he materially altered, before those plans were submitted to any regulatory authority, contractor, or other party." ; proeth:sourcetext "Engineer B reviewed the original drawings, made changes on the grading plans, including deletion of one sheet, raising the elevation of the housing pads and changing routing of the street." ; proeth:temporalscope "Before submission or use of the altered grading plan set" ; proeth:textreferences "Engineer B did not note what changes were made nor did he sign any of the sheets, including the cover sheet.", "Engineer B reviewed the original drawings, made changes on the grading plans, including deletion of one sheet, raising the elevation of the housing pads and changing routing of the street." ; proeth:wasattributedto "Case 173 Extraction" ; prov:generatedAtTime "2026-03-01T14:41:54.503591"^^xsd:dateTime ; prov:wasGeneratedBy "ProEthica Case 173 Extraction" .
Metadata
Type
Individual
Last Updated
2026-05-28 16:27
Discovered in case
173
Discovered in pass
2
Discovered in section
facts
First discovered
2026-03-01T14:22:55.048341+00:00
First case
173
Generated
2026-03-01T14:22:55.048341+00:00
Attributed to
Case 173 Extraction
Generated
2026-03-01T14:41:54.503591
Generated by
ProEthica Case 173 Extraction