Engineer B Original Seal Removal Upon Material Alteration Public Improvement Plans
O · Obligation
Individual
http://proethica.org/ontology/case/173#Engineer_B_Original_Seal_Removal_Upon_Material_Alteration_Public_Improvement_Plans
Properties
Instance of
SuccessorEngineerOriginalSealRemovalUponMaterialSheetAlterationObligation
http://proethica.org/ontology/intermediate#SuccessorEngineerOriginalSealRemovalUponMaterialSheetAlterationObligation
Case context
Engineer B made major design changes to storm drains, pipe dimensions, sewers, and utilities across the 38-sheet public improvement plan set, but left Engineer A's seal and signature intact on all sheets.
Compliance status
unmet
Confidence
0.92
Importance
high
Obligated party
Engineer B
Obligation statement
Engineer B was obligated to remove or clearly supersede Engineer A's seal and signature on each sheet of the public improvement plan set that he materially altered, before those plans were submitted to any regulatory authority, contractor, or other party.
Temporal scope
Before submission or use of the altered public improvement plan set
Relationships
Source Evidence
Source text
Engineer B also made major design changes to the storm drains, pipe dimensions, sewers, and utilities in the public improvement plans.
Text references
Engineer B also made major design changes to the storm drains, pipe dimensions, sewers, and utilities in the public improvement plans.
He made no notation of the changes, did not sign the plans, and left Engineer A's seal and signature intact.
TTL
@prefix case173: <http://proethica.org/ontology/case/173#> .
@prefix owl: <http://www.w3.org/2002/07/owl#> .
@prefix proeth: <http://proethica.org/ontology/intermediate#> .
@prefix proeth-core: <http://proethica.org/ontology/core#> .
@prefix prov: <http://www.w3.org/ns/prov#> .
@prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> .
@prefix xsd: <http://www.w3.org/2001/XMLSchema#> .
case173:Engineer_B_Original_Seal_Removal_Upon_Material_Alteration_Public_Improvement_Plans a proeth:SuccessorEngineerOriginalSealRemovalUponMaterialSheetAlterationObligation,
owl:NamedIndividual ;
rdfs:label "Engineer B Original Seal Removal Upon Material Alteration Public Improvement Plans" ;
proeth-core:competesWith case173:Engineer_B_Fundamental_Redesign_Full_Design_Accountability_Assumption_Case_82-5 ;
proeth-core:defeasibleUnder case173:Engineer_A_Seal_Retained_on_Engineer_B_Altered_Public_Improvement_Plans ;
proeth-core:prevailsOver case173:Subdivision_Client_Sealed_Plan_Transfer_Non-Authorization_of_Successor_Alteration_Case_82-5 ;
proeth:casecontext "Engineer B made major design changes to storm drains, pipe dimensions, sewers, and utilities across the 38-sheet public improvement plan set, but left Engineer A's seal and signature intact on all sheets." ;
proeth:compliancestatus "unmet" ;
proeth:conceptCategory "Obligation" ;
proeth:confidence "0.92" ;
proeth:derivedFromPrinciple case173:Original_Engineer_Seal_Integrity_Right_Invoked_for_Engineer_A_Upon_Discharge,
case173:Successor_Engineer_Sealed_Plan_Alteration_Without_Attribution_Prohibition_Applied_to_Engineer_B ;
proeth:discoveredincase "173" ;
proeth:discoveredinpass "2" ;
proeth:discoveredinsection "facts" ;
proeth:firstdiscoveredat "2026-03-01T14:22:55.048341+00:00" ;
proeth:firstdiscoveredincase "173" ;
proeth:generatedattime "2026-03-01T14:22:55.048341+00:00" ;
proeth:importance "high" ;
proeth:obligatedparty "Engineer B" ;
proeth:obligationclass "Successor Engineer Original Seal Removal Upon Material Sheet Alteration Obligation" ;
proeth:obligationstatement "Engineer B was obligated to remove or clearly supersede Engineer A's seal and signature on each sheet of the public improvement plan set that he materially altered, before those plans were submitted to any regulatory authority, contractor, or other party." ;
proeth:sourcetext "Engineer B also made major design changes to the storm drains, pipe dimensions, sewers, and utilities in the public improvement plans." ;
proeth:temporalscope "Before submission or use of the altered public improvement plan set" ;
proeth:textreferences "Engineer B also made major design changes to the storm drains, pipe dimensions, sewers, and utilities in the public improvement plans.",
"He made no notation of the changes, did not sign the plans, and left Engineer A's seal and signature intact." ;
proeth:wasattributedto "Case 173 Extraction" ;
prov:generatedAtTime "2026-03-01T14:41:54.503851"^^xsd:dateTime ;
prov:wasGeneratedBy "ProEthica Case 173 Extraction" .
Metadata
Extraction details
Discovered in case
173
Discovered in pass
2
Discovered in section
facts
First discovered
2026-03-01T14:22:55.048341+00:00
First case
173
Generated
2026-03-01T14:22:55.048341+00:00
Attributed to
Case 173 Extraction
Generated
2026-03-01T14:41:54.503851
Generated by
ProEthica Case 173 Extraction