Engineer B Vague Title-Sheet Disclaimer Insufficiency Public Improvement Plans

O · Obligation Individual
http://proethica.org/ontology/case/173#Engineer_B_Vague_Title-Sheet_Disclaimer_Insufficiency_Public_Improvement_Plans
Properties
Instance of
VagueTitle-SheetDisclaimerInsufficiencyforSealedPlanModificationObligation
http://proethica.org/ontology/intermediate#VagueTitle-SheetDisclaimerInsufficiencyforSealedPlanModificationObligation
Case context
Engineer B placed a note on the title sheet of the public improvement plans claiming responsibility for 'revisions of the plans' without specifying what changes were made, while leaving Engineer A's seal and signature intact on all 38 sheets.
Compliance status
unmet
Confidence
0.93
Importance
high
Obligated party
Engineer B
Obligation statement
Engineer B was obligated to provide specific, itemized documentation of all changes made to Engineer A's public improvement plans on each affected sheet, and was prohibited from substituting a vague title-sheet note claiming responsibility for 'revisions of the plans' — without identifying what was revised, on which sheets, or to what extent — as a substitute for proper per-sheet documentation and re-sealing.
Temporal scope
At the time of submitting or using the altered plan set
Source Evidence
Source text
Engineer B placed a note on the title sheet of the public improvement plans, leaving Engineer A's signature and seal intact, stating that he, Engineer B, is taking responsibility for the 'revisions of the plans,' making no notation what those changes were.

Text references
Engineer B placed a note on the title sheet of the public improvement plans, leaving Engineer A's signature and seal intact, stating that he, Engineer B, is taking responsibility for the 'revisions of the plans,' making no notation what those changes were.
TTL
@prefix case173: <http://proethica.org/ontology/case/173#> . @prefix owl: <http://www.w3.org/2002/07/owl#> . @prefix proeth: <http://proethica.org/ontology/intermediate#> . @prefix proeth-core: <http://proethica.org/ontology/core#> . @prefix prov: <http://www.w3.org/ns/prov#> . @prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> . @prefix xsd: <http://www.w3.org/2001/XMLSchema#> . case173:Engineer_B_Vague_Title-Sheet_Disclaimer_Insufficiency_Public_Improvement_Plans a proeth:VagueTitle-SheetDisclaimerInsufficiencyforSealedPlanModificationObligation, owl:NamedIndividual ; rdfs:label "Engineer B Vague Title-Sheet Disclaimer Insufficiency Public Improvement Plans" ; proeth-core:competesWith case173:Engineer_B_Sealed_Document_Modification_Documentation_Obligation_Case_82-5 ; proeth-core:defeasibleUnder case173:Engineer_B_Vague_Title_Sheet_Responsibility_Notation, case173:Engineer_B_Vague_Title_Sheet_Responsibility_Note ; proeth:casecontext "Engineer B placed a note on the title sheet of the public improvement plans claiming responsibility for 'revisions of the plans' without specifying what changes were made, while leaving Engineer A's seal and signature intact on all 38 sheets." ; proeth:compliancestatus "unmet" ; proeth:conceptCategory "Obligation" ; proeth:confidence "0.93" ; proeth:derivedFromPrinciple case173:Vague_Responsibility_Assumption_Insufficiency_Applied_to_Engineer_Bs_Title_Sheet_Note, case173:Vague_Responsibility_Assumption_Insufficiency_Invoked_Against_Engineer_B ; proeth:discoveredincase "173" ; proeth:discoveredinpass "2" ; proeth:discoveredinsection "facts" ; proeth:firstdiscoveredat "2026-03-01T14:22:55.048341+00:00" ; proeth:firstdiscoveredincase "173" ; proeth:generatedattime "2026-03-01T14:22:55.048341+00:00" ; proeth:importance "high" ; proeth:obligatedparty "Engineer B" ; proeth:obligationclass "Vague Title-Sheet Disclaimer Insufficiency for Sealed Plan Modification Obligation" ; proeth:obligationstatement "Engineer B was obligated to provide specific, itemized documentation of all changes made to Engineer A's public improvement plans on each affected sheet, and was prohibited from substituting a vague title-sheet note claiming responsibility for 'revisions of the plans' — without identifying what was revised, on which sheets, or to what extent — as a substitute for proper per-sheet documentation and re-sealing." ; proeth:sourcetext "Engineer B placed a note on the title sheet of the public improvement plans, leaving Engineer A's signature and seal intact, stating that he, Engineer B, is taking responsibility for the 'revisions of the plans,' making no notation what those changes were." ; proeth:temporalscope "At the time of submitting or using the altered plan set" ; proeth:textreferences "Engineer B placed a note on the title sheet of the public improvement plans, leaving Engineer A's signature and seal intact, stating that he, Engineer B, is taking responsibility for the 'revisions of the plans,' making no notation what those changes were." ; proeth:wasattributedto "Case 173 Extraction" ; prov:generatedAtTime "2026-03-01T14:41:54.502979"^^xsd:dateTime ; prov:wasGeneratedBy "ProEthica Case 173 Extraction" .
Metadata
Type
Individual
Last Updated
2026-05-28 16:27
Discovered in case
173
Discovered in pass
2
Discovered in section
facts
First discovered
2026-03-01T14:22:55.048341+00:00
First case
173
Generated
2026-03-01T14:22:55.048341+00:00
Attributed to
Case 173 Extraction
Generated
2026-03-01T14:41:54.502979
Generated by
ProEthica Case 173 Extraction