Engineer A Delivery Advisor
R · Role
Individual
http://proethica.org/ontology/case/14#Engineer_A_Delivery_Advisor
Definition
Engineer A was asked to advise City B on project delivery methods for a wastewater system improvements project, prepared a summary memo, and recommended Progressive-Design-Build while omitting Construction-Manager-at-Risk as a viable option despite being qualified to provide services under it.
Engineer A was asked to advise City B on project delivery methods for a wastewater system improvements project, prepared a summary memo, and recommended Progressive-Design-Build while omitting Construction-Manager-at-Risk as a viable option despite being qualified to provide services under it.
Properties
Instance of
Actor
Engineer A
Confidence
0.9
Has License
Professional Engineer, State C
Other Attribute
conflict_of_interest: Qualified and presumably interested in providing services under Progressive-Design-Build
omission: Did not identify Construction-Manager-at-Risk as a viable option in the memo
Role category
provider_client
Match Confidence
0.0
Matches Existing
false
Synthesis Literal
caseInvolvement
confidence
roleCategory
roleClass
textReferences
Relationships
adheresToPrinciple
Engineer A Advisory Role Integrity, Engineer A Conflict of Interest Disclosure, Engineer A Professional Competence Advisory
hasObligation
Engineer A Advisory Conflict Disclosure, Engineer A Advisory Role Objectivity, Engineer A Complete Options Advisory, Engineer A Fiduciary Advisory Duty, Engineer A Funding Constraint Disclosure, Engineer A Gratuitous Services Advisory, Engineer A Report Completeness Advisory Memo, Engineer A Self-Serving Advisory Recommendation
Source Evidence
Text references
City B's City Administrator asked Engineer A for a recommendation on project delivery methods for their upcoming wastewater system improvements project
Engineer A prepared a summary memo to City B Administrator and only identified Design-Bid-Build and Progressive-Design-Build as viable project delivery options
Engineer A recommended Progressive Design Build. Accompanying the recommendation, Engineer A provided a summary of the firm's experience with Progressive-Design-Build projects
Source text
City B's City Administrator asked Engineer A for a recommendation on project delivery methods for their upcoming wastewater system improvements project
TTL
@prefix case14: <http://proethica.org/ontology/case/14#> .
@prefix owl: <http://www.w3.org/2002/07/owl#> .
@prefix proeth: <http://proethica.org/ontology/intermediate#> .
@prefix proeth-core: <http://proethica.org/ontology/core#> .
@prefix proeth-prov: <http://proethica.org/provenance#> .
@prefix prov: <http://www.w3.org/ns/prov#> .
@prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> .
@prefix skos: <http://www.w3.org/2004/02/skos/core#> .
@prefix xsd: <http://www.w3.org/2001/XMLSchema#> .
case14:Engineer_A_Delivery_Advisor a proeth:ProjectDeliveryAdvisor,
owl:NamedIndividual ;
rdfs:label "Engineer A Delivery Advisor" ;
proeth-core:adheresToPrinciple case14:Engineer_A_Advisory_Role_Integrity,
case14:Engineer_A_Conflict_of_Interest_Disclosure,
case14:Engineer_A_Professional_Competence_Advisory ;
proeth-core:hasObligation case14:Engineer_A_Advisory_Conflict_Disclosure,
case14:Engineer_A_Advisory_Role_Objectivity,
case14:Engineer_A_Complete_Options_Advisory,
case14:Engineer_A_Fiduciary_Advisory_Duty,
case14:Engineer_A_Funding_Constraint_Disclosure,
case14:Engineer_A_Gratuitous_Services_Advisory,
case14:Engineer_A_Report_Completeness_Advisory_Memo,
case14:Engineer_A_Self-Serving_Advisory_Recommendation ;
proeth:actor "Engineer A" ;
proeth:caseInvolvement "Engineer A was asked to advise City B on project delivery methods for a wastewater system improvements project, prepared a summary memo, and recommended Progressive-Design-Build while omitting Construction-Manager-at-Risk as a viable option despite being qualified to provide services under it." ;
proeth:conceptCategory "Role" ;
proeth:confidence "0.9" ;
proeth:hasLicense "Professional Engineer, State C" ;
proeth:otherAttribute "conflict_of_interest: Qualified and presumably interested in providing services under Progressive-Design-Build",
"omission: Did not identify Construction-Manager-at-Risk as a viable option in the memo" ;
proeth:roleCategory "provider_client" ;
proeth:roleClass "Project Delivery Advisor" ;
proeth:textReferences "City B's City Administrator asked Engineer A for a recommendation on project delivery methods for their upcoming wastewater system improvements project",
"Engineer A prepared a summary memo to City B Administrator and only identified Design-Bid-Build and Progressive-Design-Build as viable project delivery options",
"Engineer A recommended Progressive Design Build. Accompanying the recommendation, Engineer A provided a summary of the firm's experience with Progressive-Design-Build projects" ;
proeth-prov:discoveredInCase 14 ;
proeth-prov:discoveredInPass 1 ;
proeth-prov:discoveredInSection "facts" ;
proeth-prov:firstDiscoveredAt "2026-06-04T08:41:03.751066+00:00"^^xsd:dateTime ;
proeth-prov:firstDiscoveredInCase 14 ;
proeth-prov:matchConfidence 0.0 ;
proeth-prov:matchesExisting false ;
proeth-prov:sourceText "City B's City Administrator asked Engineer A for a recommendation on project delivery methods for their upcoming wastewater system improvements project" ;
proeth-prov:synthesisLiteral "caseInvolvement",
"confidence",
"roleCategory",
"roleClass",
"textReferences" ;
rdfs:comment "Engineer A was asked to advise City B on project delivery methods for a wastewater system improvements project, prepared a summary memo, and recommended Progressive-Design-Build while omitting Construction-Manager-at-Risk as a viable option despite being qualified to provide services under it." ;
skos:definition "Engineer A was asked to advise City B on project delivery methods for a wastewater system improvements project, prepared a summary memo, and recommended Progressive-Design-Build while omitting Construction-Manager-at-Risk as a viable option despite being qualified to provide services under it." ;
prov:generatedAtTime "2026-06-04T08:41:03.751066+00:00"^^xsd:dateTime ;
prov:wasAttributedTo "Case 14 Extraction",
"claude-sonnet-4-6" ;
prov:wasGeneratedBy "ProEthica Case 14 Extraction" .
Metadata
Extraction details
Discovered in case
14
Discovered in pass
1
Discovered in section
facts
First discovered
2026-06-04T08:41:03.751066+00:00
First case
14
Generated
2026-06-04T08:41:03.751066+00:00
Attributed to
['Case 14 Extraction', 'claude-sonnet-4-6']
Generated by
ProEthica Case 14 Extraction