Definition

Engineer A was asked to advise City B on project delivery methods for a wastewater system improvements project, prepared a summary memo, and recommended Progressive-Design-Build while omitting Construction-Manager-at-Risk as a viable option despite being qualified to provide services under it.


Engineer A was asked to advise City B on project delivery methods for a wastewater system improvements project, prepared a summary memo, and recommended Progressive-Design-Build while omitting Construction-Manager-at-Risk as a viable option despite being qualified to provide services under it.

Properties
Instance of
ProjectDeliveryAdvisor
http://proethica.org/ontology/intermediate#ProjectDeliveryAdvisor
Actor
Engineer A
Confidence
0.9
Has License
Professional Engineer, State C
Other Attribute
conflict_of_interest: Qualified and presumably interested in providing services under Progressive-Design-Build
omission: Did not identify Construction-Manager-at-Risk as a viable option in the memo
Role category
provider_client
Match Confidence
0.0
Matches Existing
false
Synthesis Literal
caseInvolvement
confidence
roleCategory
roleClass
textReferences
Source Evidence
Text references
City B's City Administrator asked Engineer A for a recommendation on project delivery methods for their upcoming wastewater system improvements project
Engineer A prepared a summary memo to City B Administrator and only identified Design-Bid-Build and Progressive-Design-Build as viable project delivery options
Engineer A recommended Progressive Design Build. Accompanying the recommendation, Engineer A provided a summary of the firm's experience with Progressive-Design-Build projects

Source text
City B's City Administrator asked Engineer A for a recommendation on project delivery methods for their upcoming wastewater system improvements project
TTL
@prefix case14: <http://proethica.org/ontology/case/14#> . @prefix owl: <http://www.w3.org/2002/07/owl#> . @prefix proeth: <http://proethica.org/ontology/intermediate#> . @prefix proeth-core: <http://proethica.org/ontology/core#> . @prefix proeth-prov: <http://proethica.org/provenance#> . @prefix prov: <http://www.w3.org/ns/prov#> . @prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> . @prefix skos: <http://www.w3.org/2004/02/skos/core#> . @prefix xsd: <http://www.w3.org/2001/XMLSchema#> . case14:Engineer_A_Delivery_Advisor a proeth:ProjectDeliveryAdvisor, owl:NamedIndividual ; rdfs:label "Engineer A Delivery Advisor" ; proeth-core:adheresToPrinciple case14:Engineer_A_Advisory_Role_Integrity, case14:Engineer_A_Conflict_of_Interest_Disclosure, case14:Engineer_A_Professional_Competence_Advisory ; proeth-core:hasObligation case14:Engineer_A_Advisory_Conflict_Disclosure, case14:Engineer_A_Advisory_Role_Objectivity, case14:Engineer_A_Complete_Options_Advisory, case14:Engineer_A_Fiduciary_Advisory_Duty, case14:Engineer_A_Funding_Constraint_Disclosure, case14:Engineer_A_Gratuitous_Services_Advisory, case14:Engineer_A_Report_Completeness_Advisory_Memo, case14:Engineer_A_Self-Serving_Advisory_Recommendation ; proeth:actor "Engineer A" ; proeth:caseInvolvement "Engineer A was asked to advise City B on project delivery methods for a wastewater system improvements project, prepared a summary memo, and recommended Progressive-Design-Build while omitting Construction-Manager-at-Risk as a viable option despite being qualified to provide services under it." ; proeth:conceptCategory "Role" ; proeth:confidence "0.9" ; proeth:hasLicense "Professional Engineer, State C" ; proeth:otherAttribute "conflict_of_interest: Qualified and presumably interested in providing services under Progressive-Design-Build", "omission: Did not identify Construction-Manager-at-Risk as a viable option in the memo" ; proeth:roleCategory "provider_client" ; proeth:roleClass "Project Delivery Advisor" ; proeth:textReferences "City B's City Administrator asked Engineer A for a recommendation on project delivery methods for their upcoming wastewater system improvements project", "Engineer A prepared a summary memo to City B Administrator and only identified Design-Bid-Build and Progressive-Design-Build as viable project delivery options", "Engineer A recommended Progressive Design Build. Accompanying the recommendation, Engineer A provided a summary of the firm's experience with Progressive-Design-Build projects" ; proeth-prov:discoveredInCase 14 ; proeth-prov:discoveredInPass 1 ; proeth-prov:discoveredInSection "facts" ; proeth-prov:firstDiscoveredAt "2026-06-04T08:41:03.751066+00:00"^^xsd:dateTime ; proeth-prov:firstDiscoveredInCase 14 ; proeth-prov:matchConfidence 0.0 ; proeth-prov:matchesExisting false ; proeth-prov:sourceText "City B's City Administrator asked Engineer A for a recommendation on project delivery methods for their upcoming wastewater system improvements project" ; proeth-prov:synthesisLiteral "caseInvolvement", "confidence", "roleCategory", "roleClass", "textReferences" ; rdfs:comment "Engineer A was asked to advise City B on project delivery methods for a wastewater system improvements project, prepared a summary memo, and recommended Progressive-Design-Build while omitting Construction-Manager-at-Risk as a viable option despite being qualified to provide services under it." ; skos:definition "Engineer A was asked to advise City B on project delivery methods for a wastewater system improvements project, prepared a summary memo, and recommended Progressive-Design-Build while omitting Construction-Manager-at-Risk as a viable option despite being qualified to provide services under it." ; prov:generatedAtTime "2026-06-04T08:41:03.751066+00:00"^^xsd:dateTime ; prov:wasAttributedTo "Case 14 Extraction", "claude-sonnet-4-6" ; prov:wasGeneratedBy "ProEthica Case 14 Extraction" .
Metadata
Type
Individual
Last Updated
2026-06-05 09:40
Discovered in case
14
Discovered in pass
1
Discovered in section
facts
First discovered
2026-06-04T08:41:03.751066+00:00
First case
14
Generated
2026-06-04T08:41:03.751066+00:00
Attributed to
['Case 14 Extraction', 'claude-sonnet-4-6']
Generated by
ProEthica Case 14 Extraction