Engineer A Undisclosed Deadline Pressure

S · State Individual
http://proethica.org/ontology/case/85#Engineer_A_Undisclosed_Deadline_Pressure
Definition

Engineer A's internal awareness that deadline pressure caused the incompleteness of the deliverable

Properties
Instance of
UndisclosedDeadlinePressureState
http://proethica.org/ontology/intermediate#UndisclosedDeadlinePressureState
Active period
From the point at which Engineer A recognized the deliverable was incomplete due to deadline pressure through the pre-construction conference
Affected parties
Engineer A
Engineer B
Hi-Lo Construction
Local public agency
Confidence
0.9
Principle Transformation
Transforms general honesty and faithful-agent principles into a specific obligation to disclose when external pressures have compromised the professional's ability to deliver a complete and adequate work product.
Subject
Engineer A's internal awareness that deadline pressure caused the incompleteness of the deliverable
Terminated by
Engineer A's acknowledgment at the pre-construction conference that he felt pressured
Triggering event
Engineer A experiences deadline pressure and delivers incomplete drawings without disclosing the pressure or its effect
Urgency level
high
Match Confidence
0.0
Matches Existing
false
Synthesis Literal
activePeriod
confidence
stateClass
subject
terminatedBy
textReferences
triggeringEvent
urgencyLevel
Source Evidence
Text references
did not inform anyone as to their incompleteness
he felt pressured to deliver the drawings and specifications on a specified date

Source text
he felt pressured to deliver the drawings and specifications on a specified date
TTL
@prefix case85: <http://proethica.org/ontology/case/85#> . @prefix owl: <http://www.w3.org/2002/07/owl#> . @prefix proeth: <http://proethica.org/ontology/intermediate#> . @prefix proeth-core: <http://proethica.org/ontology/core#> . @prefix proeth-prov: <http://proethica.org/provenance#> . @prefix prov: <http://www.w3.org/ns/prov#> . @prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> . @prefix skos: <http://www.w3.org/2004/02/skos/core#> . @prefix xsd: <http://www.w3.org/2001/XMLSchema#> . case85:Engineer_A_Undisclosed_Deadline_Pressure a proeth:UndisclosedDeadlinePressureState, owl:NamedIndividual ; rdfs:label "Engineer A Undisclosed Deadline Pressure" ; proeth-core:activatesConstraint case85:Engineer_A_Incomplete_Deliverable_Disclosure_Constraint, case85:Engineer_A_Incomplete_Submission_Disclosure ; proeth-core:activatesObligation case85:Engineer_A_Deadline_Pressure_Resistance_Obligation, case85:Engineer_A_Deliverable_Completeness_Disclosure ; proeth-core:affects case85:Agent_Engineer_A, case85:Agent_Engineer_B ; proeth-core:terminatedByEvent case85:Pre-Construction_Conference ; proeth:activePeriod "From the point at which Engineer A recognized the deliverable was incomplete due to deadline pressure through the pre-construction conference" ; proeth:affectedParties "Engineer A", "Engineer B", "Hi-Lo Construction", "Local public agency" ; proeth:conceptCategory "State" ; proeth:confidence "0.9" ; proeth:principleTransformation "Transforms general honesty and faithful-agent principles into a specific obligation to disclose when external pressures have compromised the professional's ability to deliver a complete and adequate work product." ; proeth:stateClass "Undisclosed Deadline Pressure State" ; proeth:subject "Engineer A's internal awareness that deadline pressure caused the incompleteness of the deliverable" ; proeth:terminatedBy "Engineer A's acknowledgment at the pre-construction conference that he felt pressured" ; proeth:textReferences "did not inform anyone as to their incompleteness", "he felt pressured to deliver the drawings and specifications on a specified date" ; proeth:triggeringEvent "Engineer A experiences deadline pressure and delivers incomplete drawings without disclosing the pressure or its effect" ; proeth:urgencyLevel "high" ; proeth-prov:discoveredInCase 85 ; proeth-prov:discoveredInPass 1 ; proeth-prov:discoveredInSection "facts" ; proeth-prov:firstDiscoveredAt "2026-06-04T16:46:12.006396+00:00"^^xsd:dateTime ; proeth-prov:firstDiscoveredInCase 85 ; proeth-prov:matchConfidence 0.0 ; proeth-prov:matchesExisting false ; proeth-prov:sourceText "he felt pressured to deliver the drawings and specifications on a specified date" ; proeth-prov:synthesisLiteral "activePeriod", "confidence", "stateClass", "subject", "terminatedBy", "textReferences", "triggeringEvent", "urgencyLevel" ; rdfs:comment "Engineer A's internal awareness that deadline pressure caused the incompleteness of the deliverable" ; skos:definition "Engineer A's internal awareness that deadline pressure caused the incompleteness of the deliverable" ; prov:generatedAtTime "2026-06-04T16:46:12.006396+00:00"^^xsd:dateTime ; prov:wasAttributedTo "Case 85 Extraction", "claude-sonnet-4-6" ; prov:wasGeneratedBy "ProEthica Case 85 Extraction" .
Metadata
Type
Individual
Last Updated
2026-06-05 09:48
Discovered in case
85
Discovered in pass
1
Discovered in section
facts
First discovered
2026-06-04T16:46:12.006396+00:00
First case
85
Generated
2026-06-04T16:46:12.006396+00:00
Attributed to
['Case 85 Extraction', 'claude-sonnet-4-6']
Generated by
ProEthica Case 85 Extraction