Engineer A Deadline Pressure Resistance
O · Obligation
Individual
http://proethica.org/ontology/case/85#Engineer_A_Deadline_Pressure_Resistance_Obligation
Definition
Engineer A was obligated to communicate to the local public agency that the specified delivery date was incompatible with producing complete and buildable drawings and specifications, and to refrain from submitting incomplete sealed documents merely to meet the schedule.
Properties
Instance of
DeadlinePressureResistanceObligation
http://proethica.org/ontology/intermediate#DeadlinePressureResistanceObligation
Case context
Engineer A cited schedule pressure as the reason for submitting incomplete drawings and specifications, but did not communicate the incompleteness or request additional time from the client.
Compliance status
unmet
Confidence
0.88
Obligation statement
Engineer A was obligated to communicate to the local public agency that the specified delivery date was incompatible with producing complete and buildable drawings and specifications, and to refrain from submitting incomplete sealed documents merely to meet the schedule.
Temporal scope
Prior to or at the time of the scheduled delivery of the drawings and specifications
Match Confidence
0.0
Matches Existing
false
Synthesis Literal
caseContext
complianceStatus
confidence
obligationClass
obligationStatement
temporalScope
textReferences
Relationships
competesWith
Engineer A Complete Design Delivery
defeasibleUnder
Engineer A Undisclosed Deadline Pressure
obligatedParty
Agent Engineer A
derivedFromPrinciple
Engineer A Honesty Concealment of Deficiency
Source Evidence
Text references
Engineer A generally agrees with Hi-Lo's characterization, but in his defense responds that he felt pressured to deliver the drawings and specifications on a specified date, but did not inform anyone as to their incompleteness
Source text
Engineer A generally agrees with Hi-Lo's characterization, but in his defense responds that he felt pressured to deliver the drawings and specifications on a specified date, but did not inform anyone as to their incompleteness
TTL
@prefix case85: <http://proethica.org/ontology/case/85#> .
@prefix owl: <http://www.w3.org/2002/07/owl#> .
@prefix proeth: <http://proethica.org/ontology/intermediate#> .
@prefix proeth-core: <http://proethica.org/ontology/core#> .
@prefix proeth-prov: <http://proethica.org/provenance#> .
@prefix prov: <http://www.w3.org/ns/prov#> .
@prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> .
@prefix skos: <http://www.w3.org/2004/02/skos/core#> .
@prefix xsd: <http://www.w3.org/2001/XMLSchema#> .
case85:Engineer_A_Deadline_Pressure_Resistance_Obligation a proeth:DeadlinePressureResistanceObligation,
owl:NamedIndividual ;
rdfs:label "Engineer A Deadline Pressure Resistance" ;
proeth-core:competesWith case85:Engineer_A_Complete_Design_Delivery ;
proeth-core:defeasibleUnder case85:Engineer_A_Undisclosed_Deadline_Pressure ;
proeth-core:obligatedParty case85:Agent_Engineer_A ;
proeth:caseContext "Engineer A cited schedule pressure as the reason for submitting incomplete drawings and specifications, but did not communicate the incompleteness or request additional time from the client." ;
proeth:complianceStatus "unmet" ;
proeth:conceptCategory "Obligation" ;
proeth:confidence "0.88" ;
proeth:derivedFromPrinciple case85:Engineer_A_Honesty_Concealment_of_Deficiency ;
proeth:obligatedParty "Engineer A" ;
proeth:obligationClass "Deadline Pressure Resistance Obligation" ;
proeth:obligationStatement "Engineer A was obligated to communicate to the local public agency that the specified delivery date was incompatible with producing complete and buildable drawings and specifications, and to refrain from submitting incomplete sealed documents merely to meet the schedule." ;
proeth:temporalScope "Prior to or at the time of the scheduled delivery of the drawings and specifications" ;
proeth:textReferences "Engineer A generally agrees with Hi-Lo's characterization, but in his defense responds that he felt pressured to deliver the drawings and specifications on a specified date, but did not inform anyone as to their incompleteness" ;
proeth-prov:discoveredInCase 85 ;
proeth-prov:discoveredInPass 2 ;
proeth-prov:discoveredInSection "facts" ;
proeth-prov:firstDiscoveredAt "2026-06-04T16:50:13.568162+00:00"^^xsd:dateTime ;
proeth-prov:firstDiscoveredInCase 85 ;
proeth-prov:matchConfidence 0.0 ;
proeth-prov:matchesExisting false ;
proeth-prov:sourceText "Engineer A generally agrees with Hi-Lo's characterization, but in his defense responds that he felt pressured to deliver the drawings and specifications on a specified date, but did not inform anyone as to their incompleteness" ;
proeth-prov:synthesisLiteral "caseContext",
"complianceStatus",
"confidence",
"obligationClass",
"obligationStatement",
"temporalScope",
"textReferences" ;
rdfs:comment "Engineer A was obligated to communicate to the local public agency that the specified delivery date was incompatible with producing complete and buildable drawings and specifications, and to refrain from submitting incomplete sealed documents merely to meet the schedule." ;
skos:definition "Engineer A was obligated to communicate to the local public agency that the specified delivery date was incompatible with producing complete and buildable drawings and specifications, and to refrain from submitting incomplete sealed documents merely to meet the schedule." ;
prov:generatedAtTime "2026-06-04T16:50:13.568162+00:00"^^xsd:dateTime ;
prov:wasAttributedTo "Case 85 Extraction",
"claude-sonnet-4-6" ;
prov:wasGeneratedBy "ProEthica Case 85 Extraction" .
Metadata
Extraction details
Discovered in case
85
Discovered in pass
2
Discovered in section
facts
First discovered
2026-06-04T16:50:13.568162+00:00
First case
85
Generated
2026-06-04T16:50:13.568162+00:00
Attributed to
['Case 85 Extraction', 'claude-sonnet-4-6']
Generated by
ProEthica Case 85 Extraction