@prefix case71: <http://proethica.org/ontology/case/71#> .
@prefix owl: <http://www.w3.org/2002/07/owl#> .
@prefix proeth: <http://proethica.org/ontology/intermediate#> .
@prefix proeth-core: <http://proethica.org/ontology/core#> .
@prefix proeth-prov: <http://proethica.org/provenance#> .
@prefix prov: <http://www.w3.org/ns/prov#> .
@prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> .
@prefix skos: <http://www.w3.org/2004/02/skos/core#> .
@prefix xsd: <http://www.w3.org/2001/XMLSchema#> .
case71:Engineer_B_Litigation_Expert a proeth:LitigationExpertEngineer,
owl:NamedIndividual ;
rdfs:label "Engineer B Litigation Expert" ;
proeth-core:adheresToPrinciple case71:Engineer_B_Client_Service_Disservice,
case71:Engineer_B_Complete_Reporting_Failure,
case71:Engineer_B_Faithful_Agent_Limits_in_Litigation,
case71:Engineer_B_Intellectual_Honesty_in_Expert_Report,
case71:Engineer_B_Investigative_Completeness_Failure,
case71:Engineer_B_Investigative_Diligence_Failure,
case71:Engineer_B_Litigation_Neutrality_Breach,
case71:Engineer_B_Litigation_Neutrality_Violation,
case71:Engineer_B_Methodological_Consistency_Failure,
case71:Engineer_B_Methodological_Disclosure_Failure,
case71:Engineer_B_Objective_Completeness_Violation,
case71:Engineer_B_Objectivity_Failure_in_Expert_Role,
case71:Engineer_B_Scope_Limitation_Non-Disclosure,
case71:Engineer_B_Technical_Objectivity_Violation ;
proeth-core:hasObligation case71:Engineer_B_Adversarial_Data_Selection,
case71:Engineer_B_Complete_Technical_Reporting,
case71:Engineer_B_Contradictory_Evidence_Disclosure,
case71:Engineer_B_Expert_Witness_Neutrality,
case71:Engineer_B_Fact_Gathering_Diligence,
case71:Engineer_B_Faithful_Agent_Boundary,
case71:Engineer_B_Investigative_Completeness,
case71:Engineer_B_Methodological_Consistency,
case71:Engineer_B_Scope_Limitation_Disclosure,
case71:Engineer_B_Scope_Limitation_Non-Disclosure_Obligation ;
proeth:actor "Engineer B" ;
proeth:caseInvolvement "Retained by the municipality to supervise test pile driving and produce a findings report on whether the original 90 piles met design safety factor requirements. Concluded that 19 piles were deficient but omitted material facts including pile refusal data, wave equation results, and equipment failure from the report. Did not consult Engineer A's representatives or field personnel." ;
proeth:conceptCategory "Role" ;
proeth:confidence "0.91" ;
proeth:hasLicense "Professional Engineer" ;
proeth:hasSpecialty "Geotechnical or foundation engineering" ;
proeth:roleCategory "provider_client" ;
proeth:roleClass "Litigation Expert Engineer" ;
proeth:textReferences "At no time during the development of Engineer B's report did Engineer B talk to any representative of Engineer A",
"Engineer B did not report that the dynamic test equipment had failed",
"Engineer B did not state anywhere in the report that these 19 piles, according to the pile driving records, had been driven to essential refusal",
"Engineer B's concluding report stated that approximately 19 of the 90 piles did not meet the safety factor required by the design calculations",
"the municipality retained Engineer B to supervise the driving of several test piles" ;
proeth-prov:discoveredInCase 71 ;
proeth-prov:discoveredInPass 1 ;
proeth-prov:discoveredInSection "facts" ;
proeth-prov:firstDiscoveredAt "2026-06-04T14:26:11.026228+00:00"^^xsd:dateTime ;
proeth-prov:firstDiscoveredInCase 71 ;
proeth-prov:matchConfidence 0.0 ;
proeth-prov:matchesExisting false ;
proeth-prov:sourceText "the municipality retained Engineer B to supervise the driving of several test piles" ;
proeth-prov:synthesisLiteral "caseInvolvement",
"confidence",
"roleCategory",
"roleClass",
"textReferences" ;
rdfs:comment "Retained by the municipality to supervise test pile driving and produce a findings report on whether the original 90 piles met design safety factor requirements. Concluded that 19 piles were deficient but omitted material facts including pile refusal data, wave equation results, and equipment failure from the report. Did not consult Engineer A's representatives or field personnel." ;
skos:definition "Retained by the municipality to supervise test pile driving and produce a findings report on whether the original 90 piles met design safety factor requirements. Concluded that 19 piles were deficient but omitted material facts including pile refusal data, wave equation results, and equipment failure from the report. Did not consult Engineer A's representatives or field personnel." ;
prov:generatedAtTime "2026-06-04T14:26:11.026228+00:00"^^xsd:dateTime ;
prov:wasAttributedTo "Case 71 Extraction",
"claude-sonnet-4-6" ;
prov:wasGeneratedBy "ProEthica Case 71 Extraction" .