Engineer A Incomplete Deliverable
S · State
Individual
http://proethica.org/ontology/case/85#Engineer_A_Incomplete_Deliverable
Definition
Engineer A's submission of incomplete design drawings and specifications
Properties
Instance of
IncompleteDeliverableSubmittedState
http://proethica.org/ontology/intermediate#IncompleteDeliverableSubmittedState
Active period
From submission of incomplete plans through the Board's analysis
Affected parties
Engineer A
Engineer B
Engineer C
Owner
Public
Confidence
0.95
Principle Transformation
Transforms general honesty and completeness principles into concrete obligations to disclose known deficiencies in sealed professional documents before those documents are relied upon by contractors, agencies, or funding bodies.
Subject
Engineer A's submission of incomplete design drawings and specifications
Terminated by
Not resolved within the case; the Board finds a clear code violation
Triggering event
Engineer A delivered incomplete design drawings and specifications while asserting the incompleteness was due to time pressures and an expectation of federal funding
Urgency level
high
Match Confidence
0.0
Matches Existing
false
Synthesis Literal
activePeriod
confidence
stateClass
subject
terminatedBy
textReferences
triggeringEvent
urgencyLevel
Relationships
activatedByEvent
Document Incompleteness Occurrence
activatesConstraint
Engineer A Incomplete Deliverable Disclosure Constraint, Engineer A Incomplete Submission Disclosure
activatesObligation
Engineer A Deliverable Completeness Disclosure
affects
Agent Engineer A, Agent Engineer B, Agent Engineer C
Source Evidence
Text references
Engineer A had an obligation to provide a complete set of design drawings and specifications on the project
Engineer A's bold assertion that the work was incomplete, but that this was due to time pressures and his expectation that Federal funds would be awarded to complete the work is wholly unconvincing
Engineer A's comment about Federal funds borders on fraud and misrepresentation and is a clear violation of the NSPE Code
Source text
Engineer A had an obligation to provide a complete set of design drawings and specifications on the project
TTL
@prefix case85: <http://proethica.org/ontology/case/85#> .
@prefix owl: <http://www.w3.org/2002/07/owl#> .
@prefix proeth: <http://proethica.org/ontology/intermediate#> .
@prefix proeth-core: <http://proethica.org/ontology/core#> .
@prefix proeth-prov: <http://proethica.org/provenance#> .
@prefix prov: <http://www.w3.org/ns/prov#> .
@prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> .
@prefix skos: <http://www.w3.org/2004/02/skos/core#> .
@prefix xsd: <http://www.w3.org/2001/XMLSchema#> .
case85:Engineer_A_Incomplete_Deliverable a proeth:IncompleteDeliverableSubmittedState,
owl:NamedIndividual ;
rdfs:label "Engineer A Incomplete Deliverable" ;
proeth-core:activatedByEvent case85:Document_Incompleteness_Occurrence ;
proeth-core:activatesConstraint case85:Engineer_A_Incomplete_Deliverable_Disclosure_Constraint,
case85:Engineer_A_Incomplete_Submission_Disclosure ;
proeth-core:activatesObligation case85:Engineer_A_Deliverable_Completeness_Disclosure ;
proeth-core:affects case85:Agent_Engineer_A,
case85:Agent_Engineer_B,
case85:Agent_Engineer_C ;
proeth:activePeriod "From submission of incomplete plans through the Board's analysis" ;
proeth:affectedParties "Engineer A",
"Engineer B",
"Engineer C",
"Owner",
"Public" ;
proeth:conceptCategory "State" ;
proeth:confidence "0.95" ;
proeth:principleTransformation "Transforms general honesty and completeness principles into concrete obligations to disclose known deficiencies in sealed professional documents before those documents are relied upon by contractors, agencies, or funding bodies." ;
proeth:stateClass "Incomplete Deliverable Submitted State" ;
proeth:subject "Engineer A's submission of incomplete design drawings and specifications" ;
proeth:terminatedBy "Not resolved within the case; the Board finds a clear code violation" ;
proeth:textReferences "Engineer A had an obligation to provide a complete set of design drawings and specifications on the project",
"Engineer A's bold assertion that the work was incomplete, but that this was due to time pressures and his expectation that Federal funds would be awarded to complete the work is wholly unconvincing",
"Engineer A's comment about Federal funds borders on fraud and misrepresentation and is a clear violation of the NSPE Code" ;
proeth:triggeringEvent "Engineer A delivered incomplete design drawings and specifications while asserting the incompleteness was due to time pressures and an expectation of federal funding" ;
proeth:urgencyLevel "high" ;
proeth-prov:discoveredInCase 85 ;
proeth-prov:discoveredInPass 1 ;
proeth-prov:discoveredInSection "discussion" ;
proeth-prov:firstDiscoveredAt "2026-06-04T16:47:21.871867+00:00"^^xsd:dateTime ;
proeth-prov:firstDiscoveredInCase 85 ;
proeth-prov:matchConfidence 0.0 ;
proeth-prov:matchesExisting false ;
proeth-prov:sourceText "Engineer A had an obligation to provide a complete set of design drawings and specifications on the project" ;
proeth-prov:synthesisLiteral "activePeriod",
"confidence",
"stateClass",
"subject",
"terminatedBy",
"textReferences",
"triggeringEvent",
"urgencyLevel" ;
rdfs:comment "Engineer A's submission of incomplete design drawings and specifications" ;
skos:definition "Engineer A's submission of incomplete design drawings and specifications" ;
prov:generatedAtTime "2026-06-04T16:47:21.871867+00:00"^^xsd:dateTime ;
prov:wasAttributedTo "Case 85 Extraction",
"claude-sonnet-4-6" ;
prov:wasGeneratedBy "ProEthica Case 85 Extraction" .
Metadata
Extraction details
Discovered in case
85
Discovered in pass
1
Discovered in section
discussion
First discovered
2026-06-04T16:47:21.871867+00:00
First case
85
Generated
2026-06-04T16:47:21.871867+00:00
Attributed to
['Case 85 Extraction', 'claude-sonnet-4-6']
Generated by
ProEthica Case 85 Extraction