Engineer D Bid Document Material Information Inclusion Sprinkler As-Builts

O · Obligation Individual
http://proethica.org/ontology/case/22#Engineer_D_Bid_Document_Material_Information_Inclusion_Sprinkler_As-Builts
Properties
Instance of
BidDocumentMaterialInformationInclusionObligation
http://proethica.org/ontology/intermediate#BidDocumentMaterialInformationInclusionObligation
Case context
Engineer D's agency prepared bid documents for building renovation projects without referencing existing as-built drawings for the sprinkler systems, despite those drawings being material to accurate bid preparation and safe performance of the work.
Compliance status
unmet
Confidence
0.95
Importance
high
Obligated party
Engineer D
Obligation statement
Engineer D was obligated to identify existing as-built drawings for sprinkler systems as material technical information for renovation bid documents and to reference and make available that documentation in the bid package so that all bidders could prepare complete and accurate proposals.
Temporal scope
At the time of bid document preparation for each renovation project involving existing sprinkler systems
Source Evidence
Source text
Engineer D's agency issued bid documents for major building renovation projects that made no reference to existing as-built drawings for the existing sprinkler systems

Text references
Because as-builts are useful and can help improve designs, Engineer D should initiate a process to include as-built drawings, when available, on projects going forward.
Engineer D's agency issued bid documents for major building renovation projects that made no reference to existing as-built drawings for the existing sprinkler systems
TTL
@prefix case22: <http://proethica.org/ontology/case/22#> . @prefix owl: <http://www.w3.org/2002/07/owl#> . @prefix proeth: <http://proethica.org/ontology/intermediate#> . @prefix prov: <http://www.w3.org/ns/prov#> . @prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> . @prefix xsd: <http://www.w3.org/2001/XMLSchema#> . case22:Engineer_D_Bid_Document_Material_Information_Inclusion_Sprinkler_As-Builts a proeth:BidDocumentMaterialInformationInclusionObligation, owl:NamedIndividual ; rdfs:label "Engineer D Bid Document Material Information Inclusion Sprinkler As-Builts" ; proeth:casecontext "Engineer D's agency prepared bid documents for building renovation projects without referencing existing as-built drawings for the sprinkler systems, despite those drawings being material to accurate bid preparation and safe performance of the work." ; proeth:compliancestatus "unmet" ; proeth:conceptCategory "Obligation" ; proeth:confidence "0.95" ; proeth:derivedFromPrinciple case22:Bid_Document_Completeness_Invoked_By_Engineer_D_Omission, case22:Bid_Document_Completeness_Invoked_for_As-Built_Drawing_Inclusion ; proeth:discoveredincase "22" ; proeth:discoveredinpass "2" ; proeth:discoveredinsection "discussion" ; proeth:firstdiscoveredat "2026-02-25T20:00:26.335542+00:00" ; proeth:firstdiscoveredincase "22" ; proeth:generatedattime "2026-02-25T20:00:26.335542+00:00" ; proeth:importance "high" ; proeth:obligatedparty "Engineer D" ; proeth:obligationclass "Bid Document Material Information Inclusion Obligation" ; proeth:obligationstatement "Engineer D was obligated to identify existing as-built drawings for sprinkler systems as material technical information for renovation bid documents and to reference and make available that documentation in the bid package so that all bidders could prepare complete and accurate proposals." ; proeth:sourcetext "Engineer D's agency issued bid documents for major building renovation projects that made no reference to existing as-built drawings for the existing sprinkler systems" ; proeth:temporalscope "At the time of bid document preparation for each renovation project involving existing sprinkler systems" ; proeth:textreferences "Because as-builts are useful and can help improve designs, Engineer D should initiate a process to include as-built drawings, when available, on projects going forward.", "Engineer D's agency issued bid documents for major building renovation projects that made no reference to existing as-built drawings for the existing sprinkler systems" ; proeth:wasattributedto "Case 22 Extraction" ; prov:generatedAtTime "2026-02-25T20:07:58.302227"^^xsd:dateTime ; prov:wasGeneratedBy "ProEthica Case 22 Extraction" .
Metadata
Type
Individual
Last Updated
2026-05-28 16:26
Discovered in case
22
Discovered in pass
2
Discovered in section
discussion
First discovered
2026-02-25T20:00:26.335542+00:00
First case
22
Generated
2026-02-25T20:00:26.335542+00:00
Attributed to
Case 22 Extraction
Generated
2026-02-25T20:07:58.302227
Generated by
ProEthica Case 22 Extraction