Engineer A ABC Employee Water Treatment Report Developer

R · Role Individual
http://proethica.org/ontology/case/178#Engineer_A_ABC_Employee_Water_Treatment_Report_Developer
Definition

As an employee of ABC Engineering Company, Engineer A developed the water treatment plant expansion report for Clover City, including out-of-scope work on the elevated storage tank funding section, demonstrating initiative that attracted the city's attention.

Properties
Instance of
WaterTreatmentFacilityDesignEngineer
http://proethica.org/ontology/intermediate#WaterTreatmentFacilityDesignEngineer
Attributes
employerABC Engineering Company
clientClover City
scope_noteElevated storage tank portion was outside original contracted scope
Confidence
0.88
Importance
high
Relationships
typeemployed_by
targetABC Engineering Company
typeserves_client
targetClover City
Role category
provider_client
Relationships
Source Evidence
Source text
Engineer A developed the report by which the city will get funding for the water treatment plant expansion

Text references
Engineer A developed the report by which the city will get funding for the water treatment plant expansion
The report included a part dealing with funding for an elevated storage tank
Those aspects of the report that dealt with the elevated storage tank were not part of the scope of work originally negotiated
TTL
@prefix case178: <http://proethica.org/ontology/case/178#> . @prefix owl: <http://www.w3.org/2002/07/owl#> . @prefix proeth: <http://proethica.org/ontology/intermediate#> . @prefix proeth-core: <http://proethica.org/ontology/core#> . @prefix prov: <http://www.w3.org/ns/prov#> . @prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> . @prefix xsd: <http://www.w3.org/2001/XMLSchema#> . case178:Engineer_A_ABC_Employee_Water_Treatment_Report_Developer a proeth:WaterTreatmentFacilityDesignEngineer, owl:NamedIndividual ; rdfs:label "Engineer A ABC Employee Water Treatment Report Developer" ; proeth-core:adheresToPrinciple case178:Comparative_Case_Precedent_Distinguishing_Applied_Across_Cases_77-11_86-5_79-10, case178:Faithful_Agent_Obligation_Applied_to_Engineer_A_Declining_Immediate_Clover_City_Offer, case178:Faithful_Agent_Obligation_Applied_to_Engineer_A_During_ABC_Employment, case178:Free_Enterprise_Departure_Right_Invoked_for_Engineer_A, case178:Free_and_Open_Competition_Boundary_Condition_Applied_to_Engineer_A_Post-Departure_Solicitation, case178:Non-Self-Serving_Advisory_Obligation_Applied_to_Engineer_A_Elevated_Storage_Tank_Initiative, case178:Post-Employment_Confidential_Information_Non-Use_Invoked_in_Engineer_A_Analysis, case178:Specialized_Knowledge_Constraint_Absence_Permitting_Engineer_A_Competition, case178:Speculative_Work_Non-Entitlement_Applied_to_Elevated_Storage_Tank_Out-of-Scope_Work, case178:Staff_Engineer_Reduced_Departure_Constraint_Applied_to_Engineer_A ; proeth-core:hasObligation case178:Engineer_A_Active_Project_Declination_While_Employed_at_ABC, case178:Engineer_A_Client-Suggested_Departure_Faithful_Agent_Non-Concealment_from_ABC, case178:Engineer_A_Elevated_Storage_Tank_Out-of-Scope_Work_Non-Self-Serving_Motivation_Assessment, case178:Engineer_A_Elevated_Storage_Tank_Work_Attribution_in_Independent_Solicitation, case178:Engineer_A_Faithful_Agent_Conduct_During_ABC_Employment, case178:Engineer_A_Faithful_Agent_Duty_to_ABC_During_Active_Clover_City_Project, case178:Engineer_A_Free_Enterprise_Departure_Right_Non-Proscription_Recognition, case178:Engineer_A_Independent_Departure_Motivation_Verification, case178:Engineer_A_Out-of-Scope_Elevated_Storage_Tank_Work_Non-Entitlement_Recognition, case178:Engineer_A_Specialized_Knowledge_Absence_Competition_Permissibility_Assessment, case178:Engineer_A_Speculative_Elevated_Storage_Tank_Work_Non-Entitlement_Acknowledgment, case178:Engineer_A_Staff_Role_Calibrated_Departure_Constraint_Recognition ; proeth:attributes "{'employer': 'ABC Engineering Company', 'client': 'Clover City', 'scope_note': 'Elevated storage tank portion was outside original contracted scope'}" ; proeth:caseinvolvement "As an employee of ABC Engineering Company, Engineer A developed the water treatment plant expansion report for Clover City, including out-of-scope work on the elevated storage tank funding section, demonstrating initiative that attracted the city's attention." ; proeth:conceptCategory "Role" ; proeth:confidence "0.88" ; proeth:discoveredincase "178" ; proeth:discoveredinpass "1" ; proeth:discoveredinsection "facts" ; proeth:firstdiscoveredat "2026-03-01T08:22:10.039470+00:00" ; proeth:firstdiscoveredincase "178" ; proeth:generatedattime "2026-03-01T08:22:10.039470+00:00" ; proeth:importance "high" ; proeth:relationships "{'type': 'employed_by', 'target': 'ABC Engineering Company'}", "{'type': 'serves_client', 'target': 'Clover City'}" ; proeth:rolecategory "provider_client" ; proeth:roleclass "Water Treatment Facility Design Engineer" ; proeth:sourcetext "Engineer A developed the report by which the city will get funding for the water treatment plant expansion" ; proeth:textreferences "Engineer A developed the report by which the city will get funding for the water treatment plant expansion", "The report included a part dealing with funding for an elevated storage tank", "Those aspects of the report that dealt with the elevated storage tank were not part of the scope of work originally negotiated" ; proeth:wasattributedto "Case 178 Extraction" ; prov:generatedAtTime "2026-03-01T08:48:26.003302"^^xsd:dateTime ; prov:wasGeneratedBy "ProEthica Case 178 Extraction" .
Metadata
Type
Individual
Last Updated
2026-05-28 16:27
Discovered in case
178
Discovered in pass
1
Discovered in section
facts
First discovered
2026-03-01T08:22:10.039470+00:00
First case
178
Generated
2026-03-01T08:22:10.039470+00:00
Attributed to
Case 178 Extraction
Generated
2026-03-01T08:48:26.003302
Generated by
ProEthica Case 178 Extraction