Engineer A ABC Employee Water Treatment Report Developer
R · Role
Individual
http://proethica.org/ontology/case/178#Engineer_A_ABC_Employee_Water_Treatment_Report_Developer
Definition
As an employee of ABC Engineering Company, Engineer A developed the water treatment plant expansion report for Clover City, including out-of-scope work on the elevated storage tank funding section, demonstrating initiative that attracted the city's attention.
Properties
Instance of
WaterTreatmentFacilityDesignEngineer
http://proethica.org/ontology/intermediate#WaterTreatmentFacilityDesignEngineer
Attributes
| employer | ABC Engineering Company |
| client | Clover City |
| scope_note | Elevated storage tank portion was outside original contracted scope |
Confidence
0.88
Importance
high
Relationships
| type | employed_by |
| target | ABC Engineering Company |
| type | serves_client |
| target | Clover City |
Role category
provider_client
Relationships
adheresToPrinciple
Comparative Case Precedent Distinguishing Applied Across Cases 77-11 86-5 79-10, Faithful Agent Obligation Applied to Engineer A Declining Immediate Clover City Offer, Faithful Agent Obligation Applied to Engineer A During ABC Employment, Free Enterprise Departure Right Invoked for Engineer A, Free and Open Competition Boundary Condition Applied to Engineer A Post-Departure Solicitation, Non-Self-Serving Advisory Obligation Applied to Engineer A Elevated Storage Tank Initiative, Post-Employment Confidential Information Non-Use Invoked in Engineer A Analysis, Specialized Knowledge Constraint Absence Permitting Engineer A Competition, Speculative Work Non-Entitlement Applied to Elevated Storage Tank Out-of-Scope Work, Staff Engineer Reduced Departure Constraint Applied to Engineer A
hasObligation
Engineer A Active Project Declination While Employed at ABC, Engineer A Client-Suggested Departure Faithful Agent Non-Concealment from ABC, Engineer A Elevated Storage Tank Out-of-Scope Work Non-Self-Serving Motivation Assessment, Engineer A Elevated Storage Tank Work Attribution in Independent Solicitation, Engineer A Faithful Agent Conduct During ABC Employment, Engineer A Faithful Agent Duty to ABC During Active Clover City Project, Engineer A Free Enterprise Departure Right Non-Proscription Recognition, Engineer A Independent Departure Motivation Verification, Engineer A Out-of-Scope Elevated Storage Tank Work Non-Entitlement Recognition, Engineer A Specialized Knowledge Absence Competition Permissibility Assessment, Engineer A Speculative Elevated Storage Tank Work Non-Entitlement Acknowledgment, Engineer A Staff Role Calibrated Departure Constraint Recognition
Source Evidence
Source text
Engineer A developed the report by which the city will get funding for the water treatment plant expansion
Text references
Engineer A developed the report by which the city will get funding for the water treatment plant expansion
The report included a part dealing with funding for an elevated storage tank
Those aspects of the report that dealt with the elevated storage tank were not part of the scope of work originally negotiated
TTL
@prefix case178: <http://proethica.org/ontology/case/178#> .
@prefix owl: <http://www.w3.org/2002/07/owl#> .
@prefix proeth: <http://proethica.org/ontology/intermediate#> .
@prefix proeth-core: <http://proethica.org/ontology/core#> .
@prefix prov: <http://www.w3.org/ns/prov#> .
@prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> .
@prefix xsd: <http://www.w3.org/2001/XMLSchema#> .
case178:Engineer_A_ABC_Employee_Water_Treatment_Report_Developer a proeth:WaterTreatmentFacilityDesignEngineer,
owl:NamedIndividual ;
rdfs:label "Engineer A ABC Employee Water Treatment Report Developer" ;
proeth-core:adheresToPrinciple case178:Comparative_Case_Precedent_Distinguishing_Applied_Across_Cases_77-11_86-5_79-10,
case178:Faithful_Agent_Obligation_Applied_to_Engineer_A_Declining_Immediate_Clover_City_Offer,
case178:Faithful_Agent_Obligation_Applied_to_Engineer_A_During_ABC_Employment,
case178:Free_Enterprise_Departure_Right_Invoked_for_Engineer_A,
case178:Free_and_Open_Competition_Boundary_Condition_Applied_to_Engineer_A_Post-Departure_Solicitation,
case178:Non-Self-Serving_Advisory_Obligation_Applied_to_Engineer_A_Elevated_Storage_Tank_Initiative,
case178:Post-Employment_Confidential_Information_Non-Use_Invoked_in_Engineer_A_Analysis,
case178:Specialized_Knowledge_Constraint_Absence_Permitting_Engineer_A_Competition,
case178:Speculative_Work_Non-Entitlement_Applied_to_Elevated_Storage_Tank_Out-of-Scope_Work,
case178:Staff_Engineer_Reduced_Departure_Constraint_Applied_to_Engineer_A ;
proeth-core:hasObligation case178:Engineer_A_Active_Project_Declination_While_Employed_at_ABC,
case178:Engineer_A_Client-Suggested_Departure_Faithful_Agent_Non-Concealment_from_ABC,
case178:Engineer_A_Elevated_Storage_Tank_Out-of-Scope_Work_Non-Self-Serving_Motivation_Assessment,
case178:Engineer_A_Elevated_Storage_Tank_Work_Attribution_in_Independent_Solicitation,
case178:Engineer_A_Faithful_Agent_Conduct_During_ABC_Employment,
case178:Engineer_A_Faithful_Agent_Duty_to_ABC_During_Active_Clover_City_Project,
case178:Engineer_A_Free_Enterprise_Departure_Right_Non-Proscription_Recognition,
case178:Engineer_A_Independent_Departure_Motivation_Verification,
case178:Engineer_A_Out-of-Scope_Elevated_Storage_Tank_Work_Non-Entitlement_Recognition,
case178:Engineer_A_Specialized_Knowledge_Absence_Competition_Permissibility_Assessment,
case178:Engineer_A_Speculative_Elevated_Storage_Tank_Work_Non-Entitlement_Acknowledgment,
case178:Engineer_A_Staff_Role_Calibrated_Departure_Constraint_Recognition ;
proeth:attributes "{'employer': 'ABC Engineering Company', 'client': 'Clover City', 'scope_note': 'Elevated storage tank portion was outside original contracted scope'}" ;
proeth:caseinvolvement "As an employee of ABC Engineering Company, Engineer A developed the water treatment plant expansion report for Clover City, including out-of-scope work on the elevated storage tank funding section, demonstrating initiative that attracted the city's attention." ;
proeth:conceptCategory "Role" ;
proeth:confidence "0.88" ;
proeth:discoveredincase "178" ;
proeth:discoveredinpass "1" ;
proeth:discoveredinsection "facts" ;
proeth:firstdiscoveredat "2026-03-01T08:22:10.039470+00:00" ;
proeth:firstdiscoveredincase "178" ;
proeth:generatedattime "2026-03-01T08:22:10.039470+00:00" ;
proeth:importance "high" ;
proeth:relationships "{'type': 'employed_by', 'target': 'ABC Engineering Company'}",
"{'type': 'serves_client', 'target': 'Clover City'}" ;
proeth:rolecategory "provider_client" ;
proeth:roleclass "Water Treatment Facility Design Engineer" ;
proeth:sourcetext "Engineer A developed the report by which the city will get funding for the water treatment plant expansion" ;
proeth:textreferences "Engineer A developed the report by which the city will get funding for the water treatment plant expansion",
"The report included a part dealing with funding for an elevated storage tank",
"Those aspects of the report that dealt with the elevated storage tank were not part of the scope of work originally negotiated" ;
proeth:wasattributedto "Case 178 Extraction" ;
prov:generatedAtTime "2026-03-01T08:48:26.003302"^^xsd:dateTime ;
prov:wasGeneratedBy "ProEthica Case 178 Extraction" .
Metadata
Extraction details
Discovered in case
178
Discovered in pass
1
Discovered in section
facts
First discovered
2026-03-01T08:22:10.039470+00:00
First case
178
Generated
2026-03-01T08:22:10.039470+00:00
Attributed to
Case 178 Extraction
Generated
2026-03-01T08:48:26.003302
Generated by
ProEthica Case 178 Extraction