Engineer A Selective Option Disclosure
S · State
Individual
http://proethica.org/ontology/case/14#Engineer_A_Selective_Option_Disclosure
Definition
Engineer A's memo to City B Administrator omitting two of four approved delivery methods
Properties
Instance of
SelectiveOptionDisclosureState
http://proethica.org/ontology/intermediate#SelectiveOptionDisclosureState
Active period
From submission of the summary memo through any correction or supplementation
Affected parties
City Administrator
City B
Engineer A
Confidence
0.92
Principle Transformation
Transforms the general duty of honesty and objectivity into a concrete obligation to present all materially relevant options and disclose the basis for any exclusions.
Subject
Engineer A's memo to City B Administrator omitting two of four approved delivery methods
Terminated by
Full disclosure of all four approved options to City B Administrator
Triggering event
Engineer A prepared and submitted a memo identifying only Design-Bid-Build and Progressive-Design-Build as viable options, omitting Construction-Manager-at-Risk and Fixed-Price-Design-Build
Urgency level
high
Match Confidence
0.0
Matches Existing
false
Synthesis Literal
activePeriod
confidence
stateClass
subject
terminatedBy
textReferences
triggeringEvent
urgencyLevel
Relationships
activatesConstraint
Engineer A CM-at-Risk Exclusion Disclosure, Engineer A Self-Promotion Advisory
activatesObligation
Engineer A Advisory Conflict Disclosure, Engineer A Fiduciary Advisory Duty
Source Evidence
Text references
Engineer A prepared a summary memo to City B Administrator and only identified Design-Bid-Build and Progressive-Design-Build as viable project delivery options
Source text
Engineer A prepared a summary memo to City B Administrator and only identified Design-Bid-Build and Progressive-Design-Build as viable project delivery options
TTL
@prefix case14: <http://proethica.org/ontology/case/14#> .
@prefix owl: <http://www.w3.org/2002/07/owl#> .
@prefix proeth: <http://proethica.org/ontology/intermediate#> .
@prefix proeth-core: <http://proethica.org/ontology/core#> .
@prefix proeth-prov: <http://proethica.org/provenance#> .
@prefix prov: <http://www.w3.org/ns/prov#> .
@prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> .
@prefix skos: <http://www.w3.org/2004/02/skos/core#> .
@prefix xsd: <http://www.w3.org/2001/XMLSchema#> .
case14:Engineer_A_Selective_Option_Disclosure a proeth:SelectiveOptionDisclosureState,
owl:NamedIndividual ;
rdfs:label "Engineer A Selective Option Disclosure" ;
proeth-core:activatesConstraint case14:Engineer_A_CM-at-Risk_Exclusion_Disclosure,
case14:Engineer_A_Self-Promotion_Advisory ;
proeth-core:activatesObligation case14:Engineer_A_Advisory_Conflict_Disclosure,
case14:Engineer_A_Fiduciary_Advisory_Duty ;
proeth-core:affects case14:Agent_City_Administrator,
case14:Agent_City_B,
case14:Agent_Engineer_A ;
proeth:activePeriod "From submission of the summary memo through any correction or supplementation" ;
proeth:affectedParties "City Administrator",
"City B",
"Engineer A" ;
proeth:conceptCategory "State" ;
proeth:confidence "0.92" ;
proeth:principleTransformation "Transforms the general duty of honesty and objectivity into a concrete obligation to present all materially relevant options and disclose the basis for any exclusions." ;
proeth:stateClass "Selective Option Disclosure State" ;
proeth:subject "Engineer A's memo to City B Administrator omitting two of four approved delivery methods" ;
proeth:terminatedBy "Full disclosure of all four approved options to City B Administrator" ;
proeth:textReferences "Engineer A prepared a summary memo to City B Administrator and only identified Design-Bid-Build and Progressive-Design-Build as viable project delivery options" ;
proeth:triggeringEvent "Engineer A prepared and submitted a memo identifying only Design-Bid-Build and Progressive-Design-Build as viable options, omitting Construction-Manager-at-Risk and Fixed-Price-Design-Build" ;
proeth:urgencyLevel "high" ;
proeth-prov:discoveredInCase 14 ;
proeth-prov:discoveredInPass 1 ;
proeth-prov:discoveredInSection "facts" ;
proeth-prov:firstDiscoveredAt "2026-06-04T08:41:16.710298+00:00"^^xsd:dateTime ;
proeth-prov:firstDiscoveredInCase 14 ;
proeth-prov:matchConfidence 0.0 ;
proeth-prov:matchesExisting false ;
proeth-prov:sourceText "Engineer A prepared a summary memo to City B Administrator and only identified Design-Bid-Build and Progressive-Design-Build as viable project delivery options" ;
proeth-prov:synthesisLiteral "activePeriod",
"confidence",
"stateClass",
"subject",
"terminatedBy",
"textReferences",
"triggeringEvent",
"urgencyLevel" ;
rdfs:comment "Engineer A's memo to City B Administrator omitting two of four approved delivery methods" ;
skos:definition "Engineer A's memo to City B Administrator omitting two of four approved delivery methods" ;
prov:generatedAtTime "2026-06-04T08:41:16.710298+00:00"^^xsd:dateTime ;
prov:wasAttributedTo "Case 14 Extraction",
"claude-sonnet-4-6" ;
prov:wasGeneratedBy "ProEthica Case 14 Extraction" .
Metadata
Extraction details
Discovered in case
14
Discovered in pass
1
Discovered in section
facts
First discovered
2026-06-04T08:41:16.710298+00:00
First case
14
Generated
2026-06-04T08:41:16.710298+00:00
Attributed to
['Case 14 Extraction', 'claude-sonnet-4-6']
Generated by
ProEthica Case 14 Extraction