Principal Engineer R Subdivision Design Engineer
R · Role
Individual
http://proethica.org/ontology/case/11#Principal_Engineer_R_Subdivision_Design_Engineer
Definition
Principal Engineer at Firm BWJ who directed the development of subdivision plans for Developer G, including stormwater management design that was subsequently found to produce substantially larger post-development runoff flows than permitted under City C's 25-year peak flow regulations.
Properties
Instance of
Attributes
| license | Professional Engineer (implied as Principal Engineer) |
| employer | Firm BWJ |
| specialty | Subdivision engineering and surveying |
| role_in_firm | Principal Engineer |
Confidence
0.9
Importance
high
Relationships
| type | client |
| target | Developer G |
| type | employer |
| target | Firm BWJ |
| type | former_colleague |
| target | City Engineer J |
| type | regulatory_reviewer |
| target | City Engineer J |
Role category
provider_client
Relationships
adheresToPrinciple
Err or Acknowledgment Obligation Invoked By Principal Engineer R, Proactive Risk Disclosure Invoked By Principal Engineer R Post-Err or Discovery, Professional Accountability Invoked By Principal Engineer R
hasObligation
Principal Engineer R Err or Acknowledgment Stormwater Runoff Exceedance, Principal Engineer R Post-Err or Independent Verification IBM Analysis, Principal Engineer R Post-Err or Risk Management Team Convening BWJ, Principal Engineer R Proactive Risk Disclosure Client Post-Err or Discovery, Principal Engineer R Professional Accountability Directed Stormwater Design
Source Evidence
Source text
Developer G retains Firm BWJ (an engineering and surveying firm), under the direction of Principal Engineer R, to develop plans for the subdivision
Text references
Developer G retains Firm BWJ (an engineering and surveying firm), under the direction of Principal Engineer R, to develop plans for the subdivision
Firm IBM found storm runoff flows to be substantially larger for the 25-year, two-hour storm event after the subdivision was completed
TTL
@prefix case11: <http://proethica.org/ontology/case/11#> .
@prefix owl: <http://www.w3.org/2002/07/owl#> .
@prefix proeth: <http://proethica.org/ontology/intermediate#> .
@prefix proeth-core: <http://proethica.org/ontology/core#> .
@prefix prov: <http://www.w3.org/ns/prov#> .
@prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> .
@prefix xsd: <http://www.w3.org/2001/XMLSchema#> .
case11:Principal_Engineer_R_Subdivision_Design_Engineer a proeth:StormwaterDesignEngineer,
owl:NamedIndividual ;
rdfs:label "Principal Engineer R Subdivision Design Engineer" ;
proeth-core:adheresToPrinciple case11:Error_Acknowledgment_Obligation_Invoked_By_Principal_Engineer_R,
case11:Proactive_Risk_Disclosure_Invoked_By_Principal_Engineer_R_Post-Error_Discovery,
case11:Professional_Accountability_Invoked_By_Principal_Engineer_R ;
proeth-core:hasObligation case11:Principal_Engineer_R_Error_Acknowledgment_Stormwater_Runoff_Exceedance,
case11:Principal_Engineer_R_Post-Error_Independent_Verification_IBM_Analysis,
case11:Principal_Engineer_R_Post-Error_Risk_Management_Team_Convening_BWJ,
case11:Principal_Engineer_R_Proactive_Risk_Disclosure_Client_Post-Error_Discovery,
case11:Principal_Engineer_R_Professional_Accountability_Directed_Stormwater_Design ;
proeth:attributes "{'license': 'Professional Engineer (implied as Principal Engineer)', 'employer': 'Firm BWJ', 'specialty': 'Subdivision engineering and surveying', 'role_in_firm': 'Principal Engineer'}" ;
proeth:caseinvolvement "Principal Engineer at Firm BWJ who directed the development of subdivision plans for Developer G, including stormwater management design that was subsequently found to produce substantially larger post-development runoff flows than permitted under City C's 25-year peak flow regulations." ;
proeth:conceptCategory "Role" ;
proeth:confidence "0.9" ;
proeth:discoveredincase "11" ;
proeth:discoveredinpass "1" ;
proeth:discoveredinsection "facts" ;
proeth:firstdiscoveredat "2026-02-24T20:35:39.555288+00:00" ;
proeth:firstdiscoveredincase "11" ;
proeth:generatedattime "2026-02-24T20:35:39.555288+00:00" ;
proeth:importance "high" ;
proeth:relationships "{'type': 'client', 'target': 'Developer G'}",
"{'type': 'employer', 'target': 'Firm BWJ'}",
"{'type': 'former_colleague', 'target': 'City Engineer J'}",
"{'type': 'regulatory_reviewer', 'target': 'City Engineer J'}" ;
proeth:rolecategory "provider_client" ;
proeth:roleclass "Stormwater Design Engineer" ;
proeth:sourcetext "Developer G retains Firm BWJ (an engineering and surveying firm), under the direction of Principal Engineer R, to develop plans for the subdivision" ;
proeth:textreferences "Developer G retains Firm BWJ (an engineering and surveying firm), under the direction of Principal Engineer R, to develop plans for the subdivision",
"Firm IBM found storm runoff flows to be substantially larger for the 25-year, two-hour storm event after the subdivision was completed" ;
proeth:wasattributedto "Case 11 Extraction" ;
prov:generatedAtTime "2026-02-24T20:54:41.749318"^^xsd:dateTime ;
prov:wasGeneratedBy "ProEthica Case 11 Extraction" .
Metadata
Extraction details
Discovered in case
11
Discovered in pass
1
Discovered in section
facts
First discovered
2026-02-24T20:35:39.555288+00:00
First case
11
Generated
2026-02-24T20:35:39.555288+00:00
Attributed to
Case 11 Extraction
Generated
2026-02-24T20:54:41.749318
Generated by
ProEthica Case 11 Extraction