Principal Engineer R Error Acknowledgment Stormwater Runoff Exceedance
O · Obligation
Individual
http://proethica.org/ontology/case/11#Principal_Engineer_R_Error_Acknowledgment_Stormwater_Runoff_Exceedance
Properties
Instance of
Case context
Firm IBM's independent analysis showed post-development stormwater runoff exceeding pre-development conditions in violation of City C's regulatory requirements, and adjacent property owners experienced actual flooding following subdivision construction. Principal Engineer R directed the preparation of the original stormwater design.
Compliance status
unclear
Confidence
0.92
Importance
high
Obligated party
Principal Engineer R
Obligation statement
Principal Engineer R was obligated to acknowledge the stormwater runoff problem identified by Firm IBM's independent analysis and confirmed by actual post-construction flooding, recognizing that both empirical evidence and independent modeling demonstrated that the subdivision design failed to comply with City C's requirement that post-development runoff not exceed pre-development conditions.
Temporal scope
Upon being confronted with IBM's independent analysis and the actual flooding evidence
Relationships
derivedFromPrinciple
Err or Acknowledgment Obligation Invoked By Principal Engineer R
Source Evidence
Source text
Principal Engineer R should consider obligation III.1a and acknowledge the runoff problem – actual flooding experience and IBM's modeling show the subdivision created an issue.
Text references
Principal Engineer R should consider obligation III.1a and acknowledge the runoff problem – actual flooding experience and IBM's modeling show the subdivision created an issue.
both actual flood damage and IBM's modeling suggests that the subdivision design failed to comply with City C's regulatory requirement that post-development runoff not exceed pre-development runoff
professional obligation III.1.a affirms that professional engineers must acknowledge errors
TTL
@prefix case11: <http://proethica.org/ontology/case/11#> .
@prefix owl: <http://www.w3.org/2002/07/owl#> .
@prefix proeth: <http://proethica.org/ontology/intermediate#> .
@prefix proeth-core: <http://proethica.org/ontology/core#> .
@prefix prov: <http://www.w3.org/ns/prov#> .
@prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> .
@prefix xsd: <http://www.w3.org/2001/XMLSchema#> .
case11:Principal_Engineer_R_Error_Acknowledgment_Stormwater_Runoff_Exceedance a proeth:ErrorAcknowledgment,
owl:NamedIndividual ;
rdfs:label "Principal Engineer R Error Acknowledgment Stormwater Runoff Exceedance" ;
proeth-core:competesWith case11:Principal_Engineer_R_Post-Error_Independent_Verification_IBM_Analysis ;
proeth-core:prevailsOver case11:Principal_Engineer_R_Post-Error_Independent_Verification_IBM_Analysis ;
proeth:casecontext "Firm IBM's independent analysis showed post-development stormwater runoff exceeding pre-development conditions in violation of City C's regulatory requirements, and adjacent property owners experienced actual flooding following subdivision construction. Principal Engineer R directed the preparation of the original stormwater design." ;
proeth:compliancestatus "unclear" ;
proeth:conceptCategory "Obligation" ;
proeth:confidence "0.92" ;
proeth:derivedFromPrinciple case11:Error_Acknowledgment_Obligation_Invoked_By_Principal_Engineer_R ;
proeth:discoveredincase "11" ;
proeth:discoveredinpass "2" ;
proeth:discoveredinsection "discussion" ;
proeth:firstdiscoveredat "2026-02-24T20:45:45.413800+00:00" ;
proeth:firstdiscoveredincase "11" ;
proeth:generatedattime "2026-02-24T20:45:45.413800+00:00" ;
proeth:importance "high" ;
proeth:obligatedparty "Principal Engineer R" ;
proeth:obligationclass "Error Acknowledgment" ;
proeth:obligationstatement "Principal Engineer R was obligated to acknowledge the stormwater runoff problem identified by Firm IBM's independent analysis and confirmed by actual post-construction flooding, recognizing that both empirical evidence and independent modeling demonstrated that the subdivision design failed to comply with City C's requirement that post-development runoff not exceed pre-development conditions." ;
proeth:sourcetext "Principal Engineer R should consider obligation III.1a and acknowledge the runoff problem – actual flooding experience and IBM's modeling show the subdivision created an issue." ;
proeth:temporalscope "Upon being confronted with IBM's independent analysis and the actual flooding evidence" ;
proeth:textreferences "Principal Engineer R should consider obligation III.1a and acknowledge the runoff problem – actual flooding experience and IBM's modeling show the subdivision created an issue.",
"both actual flood damage and IBM's modeling suggests that the subdivision design failed to comply with City C's regulatory requirement that post-development runoff not exceed pre-development runoff",
"professional obligation III.1.a affirms that professional engineers must acknowledge errors" ;
proeth:wasattributedto "Case 11 Extraction" ;
prov:generatedAtTime "2026-02-24T20:54:41.760010"^^xsd:dateTime ;
prov:wasGeneratedBy "ProEthica Case 11 Extraction" .
Metadata
Extraction details
Discovered in case
11
Discovered in pass
2
Discovered in section
discussion
First discovered
2026-02-24T20:45:45.413800+00:00
First case
11
Generated
2026-02-24T20:45:45.413800+00:00
Attributed to
Case 11 Extraction
Generated
2026-02-24T20:54:41.760010
Generated by
ProEthica Case 11 Extraction