Engineer A Tidal Saltmarsh Environmental Impact Assessment Obligation
O · Obligation
Individual
http://proethica.org/ontology/case/88#Engineer_A_Tidal_Saltmarsh_Environmental_Impact_Assessment_Obligation
Properties
Instance of
TidalSaltmarshEnvironmentalImpactAssessmentObligation
http://proethica.org/ontology/intermediate#TidalSaltmarshEnvironmentalImpactAssessmentObligation
Case context
Engineer A's scope includes design and local permitting of a roadway upgrade including a tidal crossing through a tidal saltmarsh, requiring consideration of hydraulic and ecological impacts.
Compliance status
unclear
Confidence
0.78
Importance
medium
Obligated party
Engineer A
Obligation statement
Engineer A was obligated to assess and disclose the hydraulic and ecological impacts of the proposed tidal crossing upgrade — including the replacement of a small culvert with a small bridge increasing hydraulic capacity — on the tidal saltmarsh ecosystem, including effects on tidal flow patterns, saltwater intrusion, and marsh integrity.
Temporal scope
During design and permitting phases of the tidal crossing upgrade
Relationships
defeasibleUnder
Environmental Hazard - Tidal Saltmarsh Crossing
derivedFromPrinciple
Environmental Stewardship Invoked By Engineer A Tidal Saltmarsh
Source Evidence
Source text
Engineer A is a consulting engineer representing Client B, a developer who is proposing to develop a health care facility that requires a significant upgrade to the property's access road that crosses a tidal saltmarsh.
Text references
Engineer A is a consulting engineer representing Client B, a developer who is proposing to develop a health care facility that requires a significant upgrade to the property's access road that crosses a tidal saltmarsh.
Engineer A's scope includes design and local permitting of the roadway, including an upgrade of the tidal crossing from a small culvert to a small bridge, increasing its hydraulic capacity.
TTL
@prefix case88: <http://proethica.org/ontology/case/88#> .
@prefix owl: <http://www.w3.org/2002/07/owl#> .
@prefix proeth: <http://proethica.org/ontology/intermediate#> .
@prefix proeth-core: <http://proethica.org/ontology/core#> .
@prefix prov: <http://www.w3.org/ns/prov#> .
@prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> .
@prefix xsd: <http://www.w3.org/2001/XMLSchema#> .
case88:Engineer_A_Tidal_Saltmarsh_Environmental_Impact_Assessment_Obligation a proeth:TidalSaltmarshEnvironmentalImpactAssessmentObligation,
owl:NamedIndividual ;
rdfs:label "Engineer A Tidal Saltmarsh Environmental Impact Assessment Obligation" ;
proeth-core:defeasibleUnder case88:Environmental_Hazard_-_Tidal_Saltmarsh_Crossing ;
proeth:casecontext "Engineer A's scope includes design and local permitting of a roadway upgrade including a tidal crossing through a tidal saltmarsh, requiring consideration of hydraulic and ecological impacts." ;
proeth:compliancestatus "unclear" ;
proeth:conceptCategory "Obligation" ;
proeth:confidence "0.78" ;
proeth:derivedFromPrinciple case88:Environmental_Stewardship_Invoked_By_Engineer_A_Tidal_Saltmarsh ;
proeth:discoveredincase "88" ;
proeth:discoveredinpass "2" ;
proeth:discoveredinsection "facts" ;
proeth:firstdiscoveredat "2026-02-26T00:15:23.499283+00:00" ;
proeth:firstdiscoveredincase "88" ;
proeth:generatedattime "2026-02-26T00:15:23.499283+00:00" ;
proeth:importance "medium" ;
proeth:obligatedparty "Engineer A" ;
proeth:obligationclass "Tidal Saltmarsh Environmental Impact Assessment Obligation" ;
proeth:obligationstatement "Engineer A was obligated to assess and disclose the hydraulic and ecological impacts of the proposed tidal crossing upgrade — including the replacement of a small culvert with a small bridge increasing hydraulic capacity — on the tidal saltmarsh ecosystem, including effects on tidal flow patterns, saltwater intrusion, and marsh integrity." ;
proeth:sourcetext "Engineer A is a consulting engineer representing Client B, a developer who is proposing to develop a health care facility that requires a significant upgrade to the property's access road that crosses a tidal saltmarsh." ;
proeth:temporalscope "During design and permitting phases of the tidal crossing upgrade" ;
proeth:textreferences "Engineer A is a consulting engineer representing Client B, a developer who is proposing to develop a health care facility that requires a significant upgrade to the property's access road that crosses a tidal saltmarsh.",
"Engineer A's scope includes design and local permitting of the roadway, including an upgrade of the tidal crossing from a small culvert to a small bridge, increasing its hydraulic capacity." ;
proeth:wasattributedto "Case 88 Extraction" ;
prov:generatedAtTime "2026-02-26T00:31:11.064692"^^xsd:dateTime ;
prov:wasGeneratedBy "ProEthica Case 88 Extraction" .
Metadata
Extraction details
Discovered in case
88
Discovered in pass
2
Discovered in section
facts
First discovered
2026-02-26T00:15:23.499283+00:00
First case
88
Generated
2026-02-26T00:15:23.499283+00:00
Attributed to
Case 88 Extraction
Generated
2026-02-26T00:31:11.064692
Generated by
ProEthica Case 88 Extraction