Engineer A performed hydrodynamic modeling for a residential development and advocated for design to the 100-year storm surge elevation; the owner refused to agree that such protection was required.
Compliance status
unclear
Confidence
0.91
Importance
high
Obligated party
Engineer A (BER Case 18-9)
Obligation statement
Engineer A in BER Case 18-9 was obligated to continue attempting to convince the owner of the potential for damage from storm surge, and, failing agreement on the proposed design standard, to withdraw from the project.
Temporal scope
After the owner's refusal to adopt the recommended design standard
Relationships
derivedFromPrinciple
Climate-Informed Infrastructure Design Standard Invoked by BER Case 18-9 Precedent
Source Evidence
Source text
The BER concluded that Engineer A should continue to attempt to convince the owner of the potential for damage to future residents and the public, and, failing agreement on Engineer A's proposed design standard, Engineer A should withdraw from the project.
Text references
The BER concluded that Engineer A should continue to attempt to convince the owner of the potential for damage to future residents and the public, and, failing agreement on Engineer A's proposed design standard, Engineer A should withdraw from the project.
TTL
@prefix case88: <http://proethica.org/ontology/case/88#> .
@prefix owl: <http://www.w3.org/2002/07/owl#> .
@prefix proeth: <http://proethica.org/ontology/intermediate#> .
@prefix prov: <http://www.w3.org/ns/prov#> .
@prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> .
@prefix xsd: <http://www.w3.org/2001/XMLSchema#> .
case88:Engineer_A_BER_18-9_Graduated_Escalation_Coastal_Development_Withdrawal a proeth:GraduatedEscalationBeforeProjectWithdrawalObligation,
owl:NamedIndividual ;
rdfs:label "Engineer A BER 18-9 Graduated Escalation Coastal Development Withdrawal" ;
proeth:casecontext "Engineer A performed hydrodynamic modeling for a residential development and advocated for design to the 100-year storm surge elevation; the owner refused to agree that such protection was required." ;
proeth:compliancestatus "unclear" ;
proeth:conceptCategory "Obligation" ;
proeth:confidence "0.91" ;
proeth:derivedFromPrinciple case88:Climate-Informed_Infrastructure_Design_Standard_Invoked_by_BER_Case_18-9_Precedent ;
proeth:discoveredincase "88" ;
proeth:discoveredinpass "2" ;
proeth:discoveredinsection "discussion" ;
proeth:firstdiscoveredat "2026-02-27T14:21:57.794732+00:00" ;
proeth:firstdiscoveredincase "88" ;
proeth:generatedattime "2026-02-27T14:21:57.794732+00:00" ;
proeth:importance "high" ;
proeth:obligatedparty "Engineer A (BER Case 18-9)" ;
proeth:obligationclass "Graduated Escalation Before Project Withdrawal Obligation" ;
proeth:obligationstatement "Engineer A in BER Case 18-9 was obligated to continue attempting to convince the owner of the potential for damage from storm surge, and, failing agreement on the proposed design standard, to withdraw from the project." ;
proeth:sourcetext "The BER concluded that Engineer A should continue to attempt to convince the owner of the potential for damage to future residents and the public, and, failing agreement on Engineer A's proposed design standard, Engineer A should withdraw from the project." ;
proeth:temporalscope "After the owner's refusal to adopt the recommended design standard" ;
proeth:textreferences "The BER concluded that Engineer A should continue to attempt to convince the owner of the potential for damage to future residents and the public, and, failing agreement on Engineer A's proposed design standard, Engineer A should withdraw from the project." ;
proeth:wasattributedto "Case 88 Extraction" ;
prov:generatedAtTime "2026-02-28T10:32:26.864757"^^xsd:dateTime ;
prov:wasGeneratedBy "ProEthica Case 88 Extraction" .
Metadata
Extraction details
Discovered in case
88
Discovered in pass
2
Discovered in section
discussion
First discovered
2026-02-27T14:21:57.794732+00:00
First case
88
Generated
2026-02-27T14:21:57.794732+00:00
Attributed to
Case 88 Extraction
Generated
2026-02-28T10:32:26.864757
Generated by
ProEthica Case 88 Extraction