Engineer B Failure to Consult Available Sources
S · State
Individual
http://proethica.org/ontology/case/71#Engineer_B_Failure_to_Consult_Available_Sources
Definition
Engineer B's investigation process for the pile foundation report
Properties
Instance of
FailuretoConsultAvailableSourcesState
http://proethica.org/ontology/intermediate#FailuretoConsultAvailableSourcesState
Active period
Throughout Engineer B's investigation and report preparation
Affected parties
Contractor workers
Engineer A
Engineer B
Municipality
Confidence
0.91
Principle Transformation
Transforms the general duty of objectivity and thoroughness into a specific obligation to actively seek out and consider available material information before issuing professional conclusions.
Subject
Engineer B's investigation process for the pile foundation report
Terminated by
Not resolved within the case facts presented
Triggering event
Engineer B conducted investigation without consulting Engineer A's representatives, contractors, or workers who were available and had material knowledge
Urgency level
high
Match Confidence
0.0
Matches Existing
false
Synthesis Literal
activePeriod
confidence
stateClass
subject
terminatedBy
textReferences
triggeringEvent
urgencyLevel
Relationships
activatesObligation
Engineer B Fact Gathering Diligence
terminatedByEvent
Report Issued
Source Evidence
Text references
At no time during the development of Engineer B's report did Engineer B talk to any representative of Engineer A, even though Engineer A's on-site representatives were available to testify as to the accuracy of the pile driving records.
No effort was made by Engineer B to inquire from contractors, workers, or others on the job to verify or refute his theories about why the 19 piles met driving refusal prior to predicted depth.
Source text
At no time during the development of Engineer B's report did Engineer B talk to any representative of Engineer A, even though Engineer A's on-site representatives were available to testify as to the accuracy of the pile driving records.
TTL
@prefix case71: <http://proethica.org/ontology/case/71#> .
@prefix owl: <http://www.w3.org/2002/07/owl#> .
@prefix proeth: <http://proethica.org/ontology/intermediate#> .
@prefix proeth-core: <http://proethica.org/ontology/core#> .
@prefix proeth-prov: <http://proethica.org/provenance#> .
@prefix prov: <http://www.w3.org/ns/prov#> .
@prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> .
@prefix skos: <http://www.w3.org/2004/02/skos/core#> .
@prefix xsd: <http://www.w3.org/2001/XMLSchema#> .
case71:Engineer_B_Failure_to_Consult_Available_Sources a proeth:FailuretoConsultAvailableSourcesState,
owl:NamedIndividual ;
rdfs:label "Engineer B Failure to Consult Available Sources" ;
proeth-core:activatesObligation case71:Engineer_B_Fact_Gathering_Diligence ;
proeth-core:affects case71:Agent_Engineer_A,
case71:Agent_Engineer_B,
case71:Agent_Municipality ;
proeth-core:terminatedByEvent case71:Report_Issued ;
proeth:activePeriod "Throughout Engineer B's investigation and report preparation" ;
proeth:affectedParties "Contractor workers",
"Engineer A",
"Engineer B",
"Municipality" ;
proeth:conceptCategory "State" ;
proeth:confidence "0.91" ;
proeth:principleTransformation "Transforms the general duty of objectivity and thoroughness into a specific obligation to actively seek out and consider available material information before issuing professional conclusions." ;
proeth:stateClass "Failure to Consult Available Sources State" ;
proeth:subject "Engineer B's investigation process for the pile foundation report" ;
proeth:terminatedBy "Not resolved within the case facts presented" ;
proeth:textReferences "At no time during the development of Engineer B's report did Engineer B talk to any representative of Engineer A, even though Engineer A's on-site representatives were available to testify as to the accuracy of the pile driving records.",
"No effort was made by Engineer B to inquire from contractors, workers, or others on the job to verify or refute his theories about why the 19 piles met driving refusal prior to predicted depth." ;
proeth:triggeringEvent "Engineer B conducted investigation without consulting Engineer A's representatives, contractors, or workers who were available and had material knowledge" ;
proeth:urgencyLevel "high" ;
proeth-prov:discoveredInCase 71 ;
proeth-prov:discoveredInPass 1 ;
proeth-prov:discoveredInSection "facts" ;
proeth-prov:firstDiscoveredAt "2026-06-04T14:26:51.674939+00:00"^^xsd:dateTime ;
proeth-prov:firstDiscoveredInCase 71 ;
proeth-prov:matchConfidence 0.0 ;
proeth-prov:matchesExisting false ;
proeth-prov:sourceText "At no time during the development of Engineer B's report did Engineer B talk to any representative of Engineer A, even though Engineer A's on-site representatives were available to testify as to the accuracy of the pile driving records." ;
proeth-prov:synthesisLiteral "activePeriod",
"confidence",
"stateClass",
"subject",
"terminatedBy",
"textReferences",
"triggeringEvent",
"urgencyLevel" ;
rdfs:comment "Engineer B's investigation process for the pile foundation report" ;
skos:definition "Engineer B's investigation process for the pile foundation report" ;
prov:generatedAtTime "2026-06-04T14:26:51.674939+00:00"^^xsd:dateTime ;
prov:wasAttributedTo "Case 71 Extraction",
"claude-sonnet-4-6" ;
prov:wasGeneratedBy "ProEthica Case 71 Extraction" .
Metadata
Extraction details
Discovered in case
71
Discovered in pass
1
Discovered in section
facts
First discovered
2026-06-04T14:26:51.674939+00:00
First case
71
Generated
2026-06-04T14:26:51.674939+00:00
Attributed to
['Case 71 Extraction', 'claude-sonnet-4-6']
Generated by
ProEthica Case 71 Extraction