Pre-Bid As-Built Drawing Disclosure Engineer D State Agency Sprinkler Renovation
O · Obligation
Individual
http://proethica.org/ontology/case/22#Pre-Bid_As-Built_Drawing_Disclosure_Engineer_D_State_Agency_Sprinkler_Renovation
Properties
Instance of
Pre-BidAs-BuiltDrawingDisclosureObligation
http://proethica.org/ontology/intermediate#Pre-BidAs-BuiltDrawingDisclosureObligation
Case context
Engineer D's state agency issued bid documents for major building renovation projects that made no reference to existing as-built drawings for the existing sprinkler systems, depriving all bidders of material safety-critical information needed for accurate bid preparation.
Compliance status
unmet
Confidence
0.95
Importance
high
Obligated party
Engineer D
Obligation statement
Engineer D was obligated to include reference to existing as-built drawings for sprinkler systems in bid documents for major building renovation projects, and to make those drawings available to all prospective bidders on equal terms before bids were submitted.
Temporal scope
At the time of preparing and issuing bid documents for each renovation project
Relationships
Source Evidence
Source text
The agency advertises for bids on major building renovation projects; the bid documents made no reference to existing as-builts or drawings for the bidders' or awarded contractor's use.
Text references
After bids are opened and contracts are awarded, the successful sprinkler contractor asks Engineer D for as-built drawings of the existing sprinkler system.
The agency advertises for bids on major building renovation projects; the bid documents made no reference to existing as-builts or drawings for the bidders' or awarded contractor's use.
TTL
@prefix case22: <http://proethica.org/ontology/case/22#> .
@prefix owl: <http://www.w3.org/2002/07/owl#> .
@prefix proeth: <http://proethica.org/ontology/intermediate#> .
@prefix proeth-core: <http://proethica.org/ontology/core#> .
@prefix prov: <http://www.w3.org/ns/prov#> .
@prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> .
@prefix xsd: <http://www.w3.org/2001/XMLSchema#> .
case22:Pre-Bid_As-Built_Drawing_Disclosure_Engineer_D_State_Agency_Sprinkler_Renovation a proeth:Pre-BidAs-BuiltDrawingDisclosureObligation,
owl:NamedIndividual ;
rdfs:label "Pre-Bid As-Built Drawing Disclosure Engineer D State Agency Sprinkler Renovation" ;
proeth-core:competesWith case22:Faithful_Agent_Obligation_Engineer_D_State_Agency_Procurement ;
proeth:casecontext "Engineer D's state agency issued bid documents for major building renovation projects that made no reference to existing as-built drawings for the existing sprinkler systems, depriving all bidders of material safety-critical information needed for accurate bid preparation." ;
proeth:compliancestatus "unmet" ;
proeth:conceptCategory "Obligation" ;
proeth:confidence "0.95" ;
proeth:derivedFromPrinciple case22:Bid_Document_Completeness_Invoked_for_As-Built_Drawing_Inclusion,
case22:Equal_Access_to_Bid_Information_Invoked_for_Pre-Bid_As-Built_Sharing ;
proeth:discoveredincase "22" ;
proeth:discoveredinpass "2" ;
proeth:discoveredinsection "facts" ;
proeth:firstdiscoveredat "2026-02-25T19:56:04.852603+00:00" ;
proeth:firstdiscoveredincase "22" ;
proeth:generatedattime "2026-02-25T19:56:04.852603+00:00" ;
proeth:importance "high" ;
proeth:obligatedparty "Engineer D" ;
proeth:obligationclass "Pre-Bid As-Built Drawing Disclosure Obligation" ;
proeth:obligationstatement "Engineer D was obligated to include reference to existing as-built drawings for sprinkler systems in bid documents for major building renovation projects, and to make those drawings available to all prospective bidders on equal terms before bids were submitted." ;
proeth:sourcetext "The agency advertises for bids on major building renovation projects; the bid documents made no reference to existing as-builts or drawings for the bidders' or awarded contractor's use." ;
proeth:temporalscope "At the time of preparing and issuing bid documents for each renovation project" ;
proeth:textreferences "After bids are opened and contracts are awarded, the successful sprinkler contractor asks Engineer D for as-built drawings of the existing sprinkler system.",
"The agency advertises for bids on major building renovation projects; the bid documents made no reference to existing as-builts or drawings for the bidders' or awarded contractor's use." ;
proeth:wasattributedto "Case 22 Extraction" ;
prov:generatedAtTime "2026-02-25T20:07:58.295967"^^xsd:dateTime ;
prov:wasGeneratedBy "ProEthica Case 22 Extraction" .
Metadata
Extraction details
Discovered in case
22
Discovered in pass
2
Discovered in section
facts
First discovered
2026-02-25T19:56:04.852603+00:00
First case
22
Generated
2026-02-25T19:56:04.852603+00:00
Attributed to
Case 22 Extraction
Generated
2026-02-25T20:07:58.295967
Generated by
ProEthica Case 22 Extraction