Engineer D informally provided as-built drawings to successful contractors upon personal request after contract award, outside any formal agency process, creating an informal channel that some contractors learned to exploit for competitive advantage.
Compliance status
unmet
Confidence
0.93
Importance
high
Obligated party
Engineer D
Obligation statement
Engineer D was obligated to refrain from sharing as-built drawings with contractors through informal personal responses to post-award requests, and instead to direct all such requests through formal agency-sanctioned processes, so that no contractor gained an informational advantage through personal relationships with Engineer D.
Temporal scope
Upon receipt of any contractor request for as-built drawings, whether post-award or pre-bid
Relationships
defeasibleUnder
Emerging Informal Pre-Bid As-Built Request Pattern
derivedFromPrinciple
Formal Channel Requirement Violated By Engineer D Informal Sharing
Source Evidence
Source text
After bids are opened and contracts are awarded, the successful sprinkler contractor asks Engineer D for as-built drawings of the existing sprinkler system. D provides the drawings.
Text references
After bids are opened and contracts are awarded, the successful sprinkler contractor asks Engineer D for as-built drawings of the existing sprinkler system. D provides the drawings.
Over time, sprinkler contractors who received as-built drawings from Engineer D in the past begin to ask for these documents when projects are advertised, before bids are turned in.
TTL
@prefix case22: <http://proethica.org/ontology/case/22#> .
@prefix owl: <http://www.w3.org/2002/07/owl#> .
@prefix proeth: <http://proethica.org/ontology/intermediate#> .
@prefix proeth-core: <http://proethica.org/ontology/core#> .
@prefix prov: <http://www.w3.org/ns/prov#> .
@prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> .
@prefix xsd: <http://www.w3.org/2001/XMLSchema#> .
case22:Informal_Information_Sharing_Restraint_Engineer_D_As-Built_Drawings a proeth:InformalInformationSharingRestraintObligation,
owl:NamedIndividual ;
rdfs:label "Informal Information Sharing Restraint Engineer D As-Built Drawings" ;
proeth-core:competesWith case22:Fire_Protection_System_As-Built_Safety_Disclosure_Engineer_D_Renovation_Projects ;
proeth-core:defeasibleUnder case22:Emerging_Informal_Pre-Bid_As-Built_Request_Pattern ;
proeth:casecontext "Engineer D informally provided as-built drawings to successful contractors upon personal request after contract award, outside any formal agency process, creating an informal channel that some contractors learned to exploit for competitive advantage." ;
proeth:compliancestatus "unmet" ;
proeth:conceptCategory "Obligation" ;
proeth:confidence "0.93" ;
proeth:derivedFromPrinciple case22:Formal_Channel_Requirement_Violated_By_Engineer_D_Informal_Sharing ;
proeth:discoveredincase "22" ;
proeth:discoveredinpass "2" ;
proeth:discoveredinsection "facts" ;
proeth:firstdiscoveredat "2026-02-25T19:56:04.852603+00:00" ;
proeth:firstdiscoveredincase "22" ;
proeth:generatedattime "2026-02-25T19:56:04.852603+00:00" ;
proeth:importance "high" ;
proeth:obligatedparty "Engineer D" ;
proeth:obligationclass "Informal Information Sharing Restraint Obligation" ;
proeth:obligationstatement "Engineer D was obligated to refrain from sharing as-built drawings with contractors through informal personal responses to post-award requests, and instead to direct all such requests through formal agency-sanctioned processes, so that no contractor gained an informational advantage through personal relationships with Engineer D." ;
proeth:sourcetext "After bids are opened and contracts are awarded, the successful sprinkler contractor asks Engineer D for as-built drawings of the existing sprinkler system. D provides the drawings." ;
proeth:temporalscope "Upon receipt of any contractor request for as-built drawings, whether post-award or pre-bid" ;
proeth:textreferences "After bids are opened and contracts are awarded, the successful sprinkler contractor asks Engineer D for as-built drawings of the existing sprinkler system. D provides the drawings.",
"Over time, sprinkler contractors who received as-built drawings from Engineer D in the past begin to ask for these documents when projects are advertised, before bids are turned in." ;
proeth:wasattributedto "Case 22 Extraction" ;
prov:generatedAtTime "2026-02-25T20:07:58.296252"^^xsd:dateTime ;
prov:wasGeneratedBy "ProEthica Case 22 Extraction" .
Metadata
Extraction details
Discovered in case
22
Discovered in pass
2
Discovered in section
facts
First discovered
2026-02-25T19:56:04.852603+00:00
First case
22
Generated
2026-02-25T19:56:04.852603+00:00
Attributed to
Case 22 Extraction
Generated
2026-02-25T20:07:58.296252
Generated by
ProEthica Case 22 Extraction