Case context
As-built drawings of existing fire suppression systems are safety-critical information for renovation contractors; Engineer D's practice of providing them only post-award, and only upon request, created material risk of improper system modification and reduced fire suppression effectiveness.
Compliance status
partial
Confidence
0.95
Importance
high
Obligated party
Engineer D
Obligation statement
Engineer D, as a fire protection engineer and custodian of as-built drawings for existing sprinkler systems, was obligated to ensure that contractors performing renovation or modification work on those systems had access to those drawings before commencing work — and that this access was provided through formal bid document channels rather than only upon post-award request.
Temporal scope
Before bid submission for renovation projects involving existing fire suppression systems, and before commencement of any renovation work
Relationships
derivedFromPrinciple
Public Welfare Paramount Invoked In Fire Protection Bid Context
Source Evidence
Source text
Engineer D is a fire protection engineer in the public sector and works for a state agency.
Text references
After bids are opened and contracts are awarded, the successful sprinkler contractor asks Engineer D for as-built drawings of the existing sprinkler system. D provides the drawings.
Engineer D is a fire protection engineer in the public sector and works for a state agency.
The agency advertises for bids on major building renovation projects; the bid documents made no reference to existing as-builts or drawings for the bidders' or awarded contractor's use.
TTL
@prefix case22: <http://proethica.org/ontology/case/22#> .
@prefix owl: <http://www.w3.org/2002/07/owl#> .
@prefix proeth: <http://proethica.org/ontology/intermediate#> .
@prefix proeth-core: <http://proethica.org/ontology/core#> .
@prefix prov: <http://www.w3.org/ns/prov#> .
@prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> .
@prefix xsd: <http://www.w3.org/2001/XMLSchema#> .
case22:Fire_Protection_System_As-Built_Safety_Disclosure_Engineer_D_Renovation_Projects a proeth:FireProtectionSystemAs-BuiltSafetyDisclosureObligation,
owl:NamedIndividual ;
rdfs:label "Fire Protection System As-Built Safety Disclosure Engineer D Renovation Projects" ;
proeth-core:competesWith case22:Informal_Information_Sharing_Restraint_Engineer_D_As-Built_Drawings ;
proeth:casecontext "As-built drawings of existing fire suppression systems are safety-critical information for renovation contractors; Engineer D's practice of providing them only post-award, and only upon request, created material risk of improper system modification and reduced fire suppression effectiveness." ;
proeth:compliancestatus "partial" ;
proeth:conceptCategory "Obligation" ;
proeth:confidence "0.95" ;
proeth:derivedFromPrinciple case22:Public_Welfare_Paramount_Invoked_In_Fire_Protection_Bid_Context ;
proeth:discoveredincase "22" ;
proeth:discoveredinpass "2" ;
proeth:discoveredinsection "facts" ;
proeth:firstdiscoveredat "2026-02-25T19:56:04.852603+00:00" ;
proeth:firstdiscoveredincase "22" ;
proeth:generatedattime "2026-02-25T19:56:04.852603+00:00" ;
proeth:importance "high" ;
proeth:obligatedparty "Engineer D" ;
proeth:obligationclass "Fire Protection System As-Built Safety Disclosure Obligation" ;
proeth:obligationstatement "Engineer D, as a fire protection engineer and custodian of as-built drawings for existing sprinkler systems, was obligated to ensure that contractors performing renovation or modification work on those systems had access to those drawings before commencing work — and that this access was provided through formal bid document channels rather than only upon post-award request." ;
proeth:sourcetext "Engineer D is a fire protection engineer in the public sector and works for a state agency." ;
proeth:temporalscope "Before bid submission for renovation projects involving existing fire suppression systems, and before commencement of any renovation work" ;
proeth:textreferences "After bids are opened and contracts are awarded, the successful sprinkler contractor asks Engineer D for as-built drawings of the existing sprinkler system. D provides the drawings.",
"Engineer D is a fire protection engineer in the public sector and works for a state agency.",
"The agency advertises for bids on major building renovation projects; the bid documents made no reference to existing as-builts or drawings for the bidders' or awarded contractor's use." ;
proeth:wasattributedto "Case 22 Extraction" ;
prov:generatedAtTime "2026-02-25T20:07:58.296866"^^xsd:dateTime ;
prov:wasGeneratedBy "ProEthica Case 22 Extraction" .
Metadata
Extraction details
Discovered in case
22
Discovered in pass
2
Discovered in section
facts
First discovered
2026-02-25T19:56:04.852603+00:00
First case
22
Generated
2026-02-25T19:56:04.852603+00:00
Attributed to
Case 22 Extraction
Generated
2026-02-25T20:07:58.296866
Generated by
ProEthica Case 22 Extraction