Case context
As-built drawings of existing fire suppression systems are safety-critical information for renovation contractors; Engineer D's practice of providing them only post-award, and only upon request, created material risk of improper system modification and reduced fire suppression effectiveness.
Compliance status
partial
Confidence
0.95
Importance
high
Obligated party
Engineer D
Obligation statement
Engineer D, as a fire protection engineer and custodian of as-built drawings for existing sprinkler systems, was obligated to ensure that contractors performing renovation or modification work on those systems had access to those drawings before commencing work — and that this access was provided through formal bid document channels rather than only upon post-award request.
Temporal scope
Before bid submission for renovation projects involving existing fire suppression systems, and before commencement of any renovation work
Source Evidence
Source text
Engineer D is a fire protection engineer in the public sector and works for a state agency.

Text references
After bids are opened and contracts are awarded, the successful sprinkler contractor asks Engineer D for as-built drawings of the existing sprinkler system. D provides the drawings.
Engineer D is a fire protection engineer in the public sector and works for a state agency.
The agency advertises for bids on major building renovation projects; the bid documents made no reference to existing as-builts or drawings for the bidders' or awarded contractor's use.
TTL
@prefix case22: <http://proethica.org/ontology/case/22#> . @prefix owl: <http://www.w3.org/2002/07/owl#> . @prefix proeth: <http://proethica.org/ontology/intermediate#> . @prefix proeth-core: <http://proethica.org/ontology/core#> . @prefix prov: <http://www.w3.org/ns/prov#> . @prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> . @prefix xsd: <http://www.w3.org/2001/XMLSchema#> . case22:Fire_Protection_System_As-Built_Safety_Disclosure_Engineer_D_Renovation_Projects a proeth:FireProtectionSystemAs-BuiltSafetyDisclosureObligation, owl:NamedIndividual ; rdfs:label "Fire Protection System As-Built Safety Disclosure Engineer D Renovation Projects" ; proeth-core:competesWith case22:Informal_Information_Sharing_Restraint_Engineer_D_As-Built_Drawings ; proeth:casecontext "As-built drawings of existing fire suppression systems are safety-critical information for renovation contractors; Engineer D's practice of providing them only post-award, and only upon request, created material risk of improper system modification and reduced fire suppression effectiveness." ; proeth:compliancestatus "partial" ; proeth:conceptCategory "Obligation" ; proeth:confidence "0.95" ; proeth:derivedFromPrinciple case22:Public_Welfare_Paramount_Invoked_In_Fire_Protection_Bid_Context ; proeth:discoveredincase "22" ; proeth:discoveredinpass "2" ; proeth:discoveredinsection "facts" ; proeth:firstdiscoveredat "2026-02-25T19:56:04.852603+00:00" ; proeth:firstdiscoveredincase "22" ; proeth:generatedattime "2026-02-25T19:56:04.852603+00:00" ; proeth:importance "high" ; proeth:obligatedparty "Engineer D" ; proeth:obligationclass "Fire Protection System As-Built Safety Disclosure Obligation" ; proeth:obligationstatement "Engineer D, as a fire protection engineer and custodian of as-built drawings for existing sprinkler systems, was obligated to ensure that contractors performing renovation or modification work on those systems had access to those drawings before commencing work — and that this access was provided through formal bid document channels rather than only upon post-award request." ; proeth:sourcetext "Engineer D is a fire protection engineer in the public sector and works for a state agency." ; proeth:temporalscope "Before bid submission for renovation projects involving existing fire suppression systems, and before commencement of any renovation work" ; proeth:textreferences "After bids are opened and contracts are awarded, the successful sprinkler contractor asks Engineer D for as-built drawings of the existing sprinkler system. D provides the drawings.", "Engineer D is a fire protection engineer in the public sector and works for a state agency.", "The agency advertises for bids on major building renovation projects; the bid documents made no reference to existing as-builts or drawings for the bidders' or awarded contractor's use." ; proeth:wasattributedto "Case 22 Extraction" ; prov:generatedAtTime "2026-02-25T20:07:58.296866"^^xsd:dateTime ; prov:wasGeneratedBy "ProEthica Case 22 Extraction" .
Metadata
Type
Individual
Last Updated
2026-05-28 16:26
Discovered in case
22
Discovered in pass
2
Discovered in section
facts
First discovered
2026-02-25T19:56:04.852603+00:00
First case
22
Generated
2026-02-25T19:56:04.852603+00:00
Attributed to
Case 22 Extraction
Generated
2026-02-25T20:07:58.296866
Generated by
ProEthica Case 22 Extraction