Engineer D recognized that as-built drawings were useful for improving design quality but had been addressing contractor requests informally rather than through formal institutional processes.
Compliance status
unmet
Confidence
0.95
Importance
high
Obligated party
Engineer D
Obligation statement
Engineer D was obligated to initiate a formal institutional process to systematically include as-built drawings in future bid packages for renovation projects involving existing sprinkler systems, rather than continuing to address contractor requests informally on a case-by-case basis.
Temporal scope
Upon recognizing the recurring pattern of contractor requests for as-built drawings
Relationships
derivedFromPrinciple
Proactive Systemic Remedy Obligation Invoked for As-Built Drawing Gap
Source Evidence
Source text
Because as-builts are useful and can help improve designs, Engineer D should initiate a process to include as-built drawings, when available, on projects going forward.
Text references
Because as-builts are useful and can help improve designs, Engineer D should initiate a process to include as-built drawings, when available, on projects going forward.
Engineer D can advise that as-built drawings are available, but D should direct subcontractors to request them as part of the standard project process.
TTL
@prefix case22: <http://proethica.org/ontology/case/22#> .
@prefix owl: <http://www.w3.org/2002/07/owl#> .
@prefix proeth: <http://proethica.org/ontology/intermediate#> .
@prefix proeth-core: <http://proethica.org/ontology/core#> .
@prefix prov: <http://www.w3.org/ns/prov#> .
@prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> .
@prefix xsd: <http://www.w3.org/2001/XMLSchema#> .
case22:Engineer_D_Proactive_Formal_Process_Initiation_As-Built_Drawing_Gap a proeth:ProactiveFormalProcessInitiationforRecurringInformationGapObligation,
owl:NamedIndividual ;
rdfs:label "Engineer D Proactive Formal Process Initiation As-Built Drawing Gap" ;
proeth-core:prevailsOver case22:Engineer_D_Informal_Information_Sharing_Restraint_As-Built_Drawings ;
proeth:casecontext "Engineer D recognized that as-built drawings were useful for improving design quality but had been addressing contractor requests informally rather than through formal institutional processes." ;
proeth:compliancestatus "unmet" ;
proeth:conceptCategory "Obligation" ;
proeth:confidence "0.95" ;
proeth:derivedFromPrinciple case22:Proactive_Systemic_Remedy_Obligation_Invoked_for_As-Built_Drawing_Gap ;
proeth:discoveredincase "22" ;
proeth:discoveredinpass "2" ;
proeth:discoveredinsection "discussion" ;
proeth:firstdiscoveredat "2026-02-25T20:00:26.335542+00:00" ;
proeth:firstdiscoveredincase "22" ;
proeth:generatedattime "2026-02-25T20:00:26.335542+00:00" ;
proeth:importance "high" ;
proeth:obligatedparty "Engineer D" ;
proeth:obligationclass "Proactive Formal Process Initiation for Recurring Information Gap Obligation" ;
proeth:obligationstatement "Engineer D was obligated to initiate a formal institutional process to systematically include as-built drawings in future bid packages for renovation projects involving existing sprinkler systems, rather than continuing to address contractor requests informally on a case-by-case basis." ;
proeth:sourcetext "Because as-builts are useful and can help improve designs, Engineer D should initiate a process to include as-built drawings, when available, on projects going forward." ;
proeth:temporalscope "Upon recognizing the recurring pattern of contractor requests for as-built drawings" ;
proeth:textreferences "Because as-builts are useful and can help improve designs, Engineer D should initiate a process to include as-built drawings, when available, on projects going forward.",
"Engineer D can advise that as-built drawings are available, but D should direct subcontractors to request them as part of the standard project process." ;
proeth:wasattributedto "Case 22 Extraction" ;
prov:generatedAtTime "2026-02-25T20:07:58.301946"^^xsd:dateTime ;
prov:wasGeneratedBy "ProEthica Case 22 Extraction" .
Metadata
Extraction details
Discovered in case
22
Discovered in pass
2
Discovered in section
discussion
First discovered
2026-02-25T20:00:26.335542+00:00
First case
22
Generated
2026-02-25T20:00:26.335542+00:00
Attributed to
Case 22 Extraction
Generated
2026-02-25T20:07:58.301946
Generated by
ProEthica Case 22 Extraction