Proactive Systemic Remedy Obligation Invoked for As-Built Drawing Gap
P · Principle
Individual
http://proethica.org/ontology/case/22#Proactive_Systemic_Remedy_Obligation_Invoked_for_As-Built_Drawing_Gap
Properties
Instance of
ProactiveSystemicRemedyObligationforRecurringInformationGaps
http://proethica.org/ontology/intermediate#ProactiveSystemicRemedyObligationforRecurringInformationGaps
Applied to
Recurring absence of as-built drawings from bid documents on public building renovation projects
Balancing with
Bid Document Completeness and Material Information Disclosure
Formal Channel Requirement for Information Sharing in Public Procurement
Concrete expression
Because the unavailability of as-built drawings in bid documents is a recurring gap that Engineer D has identified as harmful to design quality, D has an obligation to initiate a formal process to include as-built drawings in future bid packages rather than continuing to address the gap through ad hoc informal sharing
Confidence
0.93
Importance
high
Interpretation
The systemic remedy obligation transforms D's individual ethical problem into an institutional improvement opportunity — D's knowledge of the recurring gap creates a professional obligation to fix the system, not just manage individual instances
Invoked by
Engineer D Public Sector Fire Protection Engineer
Tension resolution
Initiating a formal process to include as-built drawings in bid documents simultaneously satisfies the systemic remedy obligation, the formal channel requirement, and the bid document completeness principle
Source Evidence
Source text
Because as-builts are useful and can help improve designs, Engineer D should initiate a process to include as-built drawings, when available, on projects going forward.
Text references
Because as-builts are useful and can help improve designs, Engineer D should initiate a process to include as-built drawings, when available, on projects going forward.
TTL
@prefix case22: <http://proethica.org/ontology/case/22#> .
@prefix owl: <http://www.w3.org/2002/07/owl#> .
@prefix proeth: <http://proethica.org/ontology/intermediate#> .
@prefix prov: <http://www.w3.org/ns/prov#> .
@prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> .
@prefix xsd: <http://www.w3.org/2001/XMLSchema#> .
case22:Proactive_Systemic_Remedy_Obligation_Invoked_for_As-Built_Drawing_Gap a proeth:ProactiveSystemicRemedyObligationforRecurringInformationGaps,
owl:NamedIndividual ;
rdfs:label "Proactive Systemic Remedy Obligation Invoked for As-Built Drawing Gap" ;
proeth:appliedto "Recurring absence of as-built drawings from bid documents on public building renovation projects" ;
proeth:balancingwith "Bid Document Completeness and Material Information Disclosure",
"Formal Channel Requirement for Information Sharing in Public Procurement" ;
proeth:conceptCategory "Principle" ;
proeth:concreteexpression "Because the unavailability of as-built drawings in bid documents is a recurring gap that Engineer D has identified as harmful to design quality, D has an obligation to initiate a formal process to include as-built drawings in future bid packages rather than continuing to address the gap through ad hoc informal sharing" ;
proeth:confidence "0.93" ;
proeth:discoveredincase "22" ;
proeth:discoveredinpass "2" ;
proeth:discoveredinsection "discussion" ;
proeth:firstdiscoveredat "2026-02-25T19:58:39.771005+00:00" ;
proeth:firstdiscoveredincase "22" ;
proeth:generatedattime "2026-02-25T19:58:39.771005+00:00" ;
proeth:importance "high" ;
proeth:interpretation "The systemic remedy obligation transforms D's individual ethical problem into an institutional improvement opportunity — D's knowledge of the recurring gap creates a professional obligation to fix the system, not just manage individual instances" ;
proeth:invokedby "Engineer D Public Sector Fire Protection Engineer" ;
proeth:principleclass "Proactive Systemic Remedy Obligation for Recurring Information Gaps" ;
proeth:sourcetext "Because as-builts are useful and can help improve designs, Engineer D should initiate a process to include as-built drawings, when available, on projects going forward." ;
proeth:tensionresolution "Initiating a formal process to include as-built drawings in bid documents simultaneously satisfies the systemic remedy obligation, the formal channel requirement, and the bid document completeness principle" ;
proeth:textreferences "Because as-builts are useful and can help improve designs, Engineer D should initiate a process to include as-built drawings, when available, on projects going forward." ;
proeth:wasattributedto "Case 22 Extraction" ;
prov:generatedAtTime "2026-02-25T20:07:58.300351"^^xsd:dateTime ;
prov:wasGeneratedBy "ProEthica Case 22 Extraction" .
Metadata
Extraction details
Discovered in case
22
Discovered in pass
2
Discovered in section
discussion
First discovered
2026-02-25T19:58:39.771005+00:00
First case
22
Generated
2026-02-25T19:58:39.771005+00:00
Attributed to
Case 22 Extraction
Generated
2026-02-25T20:07:58.300351
Generated by
ProEthica Case 22 Extraction