Engineer B Post-Actual-Departure Brochure Cessation Absolute BER-82
O · Obligation
Individual
http://proethica.org/ontology/case/171#Engineer_B_Post-Actual-Departure_Brochure_Cessation_Absolute_BER-82
Properties
Instance of
Post-Actual-DepartureBrochureCessationAbsoluteObligation
http://proethica.org/ontology/intermediate#Post-Actual-DepartureBrochureCessationAbsoluteObligation
Case context
Engineer B continued distributing a promotional brochure listing Engineer A as a key employee after Engineer A had formally departed the firm. This constituted a clear misrepresentation of a pertinent fact with intent to enhance the firm's qualifications, violating NSPE Code Section II.5.a.
Compliance status
unmet
Confidence
0.97
Importance
high
Obligated party
Engineer B
Obligation statement
Engineer B was absolutely obligated to cease distributing any brochure listing Engineer A as a key employee immediately upon Engineer A's formal departure from the firm.
Temporal scope
From Engineer A's actual departure date onward
Relationships
Source Evidence
Source text
Moreover, Engineer B distributed the brochure after Engineer A had left the firm.
Text references
Moreover, Engineer B distributed the brochure after Engineer A had left the firm.
That is a clear misrepresentation of a pertinent fact with the intent to enhance the firm's qualifications and as such constitutes a violation of the Code.
once Engineer A had been formally dismissed, Engineer B had an ethical obligation to cease using the brochure with Engineer A's name in it entirely.
TTL
@prefix case171: <http://proethica.org/ontology/case/171#> .
@prefix owl: <http://www.w3.org/2002/07/owl#> .
@prefix proeth: <http://proethica.org/ontology/intermediate#> .
@prefix proeth-core: <http://proethica.org/ontology/core#> .
@prefix prov: <http://www.w3.org/ns/prov#> .
@prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> .
@prefix xsd: <http://www.w3.org/2001/XMLSchema#> .
case171:Engineer_B_Post-Actual-Departure_Brochure_Cessation_Absolute_BER-82 a proeth:Post-Actual-DepartureBrochureCessationAbsoluteObligation,
owl:NamedIndividual ;
rdfs:label "Engineer B Post-Actual-Departure Brochure Cessation Absolute BER-82" ;
proeth-core:competesWith case171:Engineer_B_Notice-Period_Active-Negotiation_Key-Employee_Departure_Disclosure_BER-82 ;
proeth-core:prevailsOver case171:Engineer_B_Notice-Period_Active-Negotiation_Key-Employee_Departure_Disclosure_BER-82 ;
proeth:casecontext "Engineer B continued distributing a promotional brochure listing Engineer A as a key employee after Engineer A had formally departed the firm. This constituted a clear misrepresentation of a pertinent fact with intent to enhance the firm's qualifications, violating NSPE Code Section II.5.a." ;
proeth:compliancestatus "unmet" ;
proeth:conceptCategory "Obligation" ;
proeth:confidence "0.97" ;
proeth:derivedFromPrinciple case171:Post-Actual-Termination_Brochure_Continued_Use_Absolute_Prohibition_Applied_to_Engineer_B ;
proeth:discoveredincase "171" ;
proeth:discoveredinpass "2" ;
proeth:discoveredinsection "discussion" ;
proeth:firstdiscoveredat "2026-03-02T14:40:34.949168+00:00" ;
proeth:firstdiscoveredincase "171" ;
proeth:generatedattime "2026-03-02T14:40:34.949168+00:00" ;
proeth:importance "high" ;
proeth:obligatedparty "Engineer B" ;
proeth:obligationclass "Post-Actual-Departure Brochure Cessation Absolute Obligation" ;
proeth:obligationstatement "Engineer B was absolutely obligated to cease distributing any brochure listing Engineer A as a key employee immediately upon Engineer A's formal departure from the firm." ;
proeth:sourcetext "Moreover, Engineer B distributed the brochure after Engineer A had left the firm." ;
proeth:temporalscope "From Engineer A's actual departure date onward" ;
proeth:textreferences "Moreover, Engineer B distributed the brochure after Engineer A had left the firm.",
"That is a clear misrepresentation of a pertinent fact with the intent to enhance the firm's qualifications and as such constitutes a violation of the Code.",
"once Engineer A had been formally dismissed, Engineer B had an ethical obligation to cease using the brochure with Engineer A's name in it entirely." ;
proeth:wasattributedto "Case 171 Extraction" ;
prov:generatedAtTime "2026-03-02T14:51:15.291691"^^xsd:dateTime ;
prov:wasGeneratedBy "ProEthica Case 171 Extraction" .
Metadata
Extraction details
Discovered in case
171
Discovered in pass
2
Discovered in section
discussion
First discovered
2026-03-02T14:40:34.949168+00:00
First case
171
Generated
2026-03-02T14:40:34.949168+00:00
Attributed to
Case 171 Extraction
Generated
2026-03-02T14:51:15.291691
Generated by
ProEthica Case 171 Extraction