Case context
Private Power Company PE testified before the state legislative committee on a water-power complex project serving water supply, flood control, and electric power production.
Compliance status
met
Confidence
0.78
Importance
medium
Obligated party
Private Power Company PE Legislative Witness
Obligation statement
The Private Power Company PE, in testifying before the state legislative committee on the dam configuration question, was obligated to present testimony that acknowledged the multi-dimensional public welfare implications — water supply, flood control, and electric power production — of the one high dam approach, rather than presenting testimony that optimized for only one public good.
Temporal scope
During legislative committee testimony
Source Evidence
Source text
Particularly in large and complicated engineering problems, such as a water-power complex, there may be many approaches, all based on sound engineering principles.

Text references
Large public projects are notably in this category, and the approach finally adopted may properly reflect not only engineering diagnoses, but also determinations of public policy.
Particularly in large and complicated engineering problems, such as a water-power complex, there may be many approaches, all based on sound engineering principles.
TTL
@prefix case114: <http://proethica.org/ontology/case/114#> . @prefix owl: <http://www.w3.org/2002/07/owl#> . @prefix proeth: <http://proethica.org/ontology/intermediate#> . @prefix proeth-core: <http://proethica.org/ontology/core#> . @prefix prov: <http://www.w3.org/ns/prov#> . @prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> . @prefix xsd: <http://www.w3.org/2001/XMLSchema#> . <http://proethica.org/ontology/case/114#Private_Power_Company_PE_—_Competing_Public_Goods_Balanced_Legislative_Testimony> a proeth:CompetingPublicGoodsWaterSupplyFloodControlPowerProductionBalancedTestimonyObligation, owl:NamedIndividual ; rdfs:label "Private Power Company PE — Competing Public Goods Balanced Legislative Testimony" ; proeth-core:defeasibleUnder case114:Private_Power_Company_Engineer_Legislative_Testimony ; proeth:casecontext "Private Power Company PE testified before the state legislative committee on a water-power complex project serving water supply, flood control, and electric power production." ; proeth:compliancestatus "met" ; proeth:conceptCategory "Obligation" ; proeth:confidence "0.78" ; proeth:derivedFromPrinciple <http://proethica.org/ontology/case/114#Competing_Public_Goods_Balancing_—_Water_Supply_Flood_Control_Power_Production> ; proeth:discoveredincase "114" ; proeth:discoveredinpass "2" ; proeth:discoveredinsection "discussion" ; proeth:firstdiscoveredat "2026-03-02T15:30:18.471831+00:00" ; proeth:firstdiscoveredincase "114" ; proeth:generatedattime "2026-03-02T15:30:18.471831+00:00" ; proeth:importance "medium" ; proeth:obligatedparty "Private Power Company PE Legislative Witness" ; proeth:obligationclass "Competing Public Goods Water Supply Flood Control Power Production Balanced Testimony Obligation" ; proeth:obligationstatement "The Private Power Company PE, in testifying before the state legislative committee on the dam configuration question, was obligated to present testimony that acknowledged the multi-dimensional public welfare implications — water supply, flood control, and electric power production — of the one high dam approach, rather than presenting testimony that optimized for only one public good." ; proeth:sourcetext "Particularly in large and complicated engineering problems, such as a water-power complex, there may be many approaches, all based on sound engineering principles." ; proeth:temporalscope "During legislative committee testimony" ; proeth:textreferences "Large public projects are notably in this category, and the approach finally adopted may properly reflect not only engineering diagnoses, but also determinations of public policy.", "Particularly in large and complicated engineering problems, such as a water-power complex, there may be many approaches, all based on sound engineering principles." ; proeth:wasattributedto "Case 114 Extraction" ; prov:generatedAtTime "2026-03-02T15:38:37.749075"^^xsd:dateTime ; prov:wasGeneratedBy "ProEthica Case 114 Extraction" .
Metadata
Type
Individual
Last Updated
2026-05-28 16:26
Discovered in case
114
Discovered in pass
2
Discovered in section
discussion
First discovered
2026-03-02T15:30:18.471831+00:00
First case
114
Generated
2026-03-02T15:30:18.471831+00:00
Attributed to
Case 114 Extraction
Generated
2026-03-02T15:38:37.749075
Generated by
ProEthica Case 114 Extraction