Private Power Company Engineer Legislative Testimony

S · State Individual
http://proethica.org/ontology/case/114#Private_Power_Company_Engineer_Legislative_Testimony
Properties
Instance of
LegislativeTestimonyCompetingPrincipalRepresentationState
http://proethica.org/ontology/intermediate#LegislativeTestimonyCompetingPrincipalRepresentationState
Active period
During the legislative committee hearings on water supply, flood control, and electric power bills
Affected parties
Engineer representing private power company
Engineer representing state power commission
General citizenry
State legislature and committee
Confidence
0.9
Importance
high
Subject
Professional engineer representing a private power company testifying before the legislative committee
Terminated by
Conclusion of legislative hearings
Triggering event
Legislative committee calling hearings to receive comments and recommendations on competing proposals
Urgency level
medium
Source Evidence
Source text
Another professional engineer, representing a private power company, testifies that his engineering analysis indicates a more effective and less expensive solution, producing the same results, by using one high dam

Text references
Another professional engineer, representing a private power company, testifies that his engineering analysis indicates a more effective and less expensive solution, producing the same results, by using one high dam
TTL
@prefix case114: <http://proethica.org/ontology/case/114#> . @prefix owl: <http://www.w3.org/2002/07/owl#> . @prefix proeth: <http://proethica.org/ontology/intermediate#> . @prefix prov: <http://www.w3.org/ns/prov#> . @prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> . @prefix xsd: <http://www.w3.org/2001/XMLSchema#> . case114:Private_Power_Company_Engineer_Legislative_Testimony a proeth:LegislativeTestimonyCompetingPrincipalRepresentationState, owl:NamedIndividual ; rdfs:label "Private Power Company Engineer Legislative Testimony" ; proeth:activeperiod "During the legislative committee hearings on water supply, flood control, and electric power bills" ; proeth:affectedparties "Engineer representing private power company", "Engineer representing state power commission", "General citizenry", "State legislature and committee" ; proeth:conceptCategory "State" ; proeth:confidence "0.9" ; proeth:discoveredincase "114" ; proeth:discoveredinpass "1" ; proeth:discoveredinsection "facts" ; proeth:firstdiscoveredat "2026-03-02T15:15:42.311661+00:00" ; proeth:firstdiscoveredincase "114" ; proeth:generatedattime "2026-03-02T15:15:42.311661+00:00" ; proeth:importance "high" ; proeth:sourcetext "Another professional engineer, representing a private power company, testifies that his engineering analysis indicates a more effective and less expensive solution, producing the same results, by using one high dam" ; proeth:stateclass "Legislative Testimony Competing Principal Representation State" ; proeth:subject "Professional engineer representing a private power company testifying before the legislative committee" ; proeth:terminatedby "Conclusion of legislative hearings" ; proeth:textreferences "Another professional engineer, representing a private power company, testifies that his engineering analysis indicates a more effective and less expensive solution, producing the same results, by using one high dam" ; proeth:triggeringevent "Legislative committee calling hearings to receive comments and recommendations on competing proposals" ; proeth:urgencylevel "medium" ; proeth:wasattributedto "Case 114 Extraction" ; prov:generatedAtTime "2026-03-02T15:38:37.730945"^^xsd:dateTime ; prov:wasGeneratedBy "ProEthica Case 114 Extraction" .
Metadata
Type
Individual
Last Updated
2026-05-28 16:26
Discovered in case
114
Discovered in pass
1
Discovered in section
facts
First discovered
2026-03-02T15:15:42.311661+00:00
First case
114
Generated
2026-03-02T15:15:42.311661+00:00
Attributed to
Case 114 Extraction
Generated
2026-03-02T15:38:37.730945
Generated by
ProEthica Case 114 Extraction