Firm IBM Independent Reviewer

R · Role Individual
http://proethica.org/ontology/case/11#Firm_IBM_Independent_Reviewer
Definition

Firm IBM conducted independent stormwater modeling and analysis of the BWJ subdivision design following complaints about post-construction flooding, finding that post-development runoff flows exceed pre-development conditions in conflict with City C requirements. IBM's analysis is used to establish the evidentiary basis for Engineer R's obligation to acknowledge design errors.

Properties
Instance of
Third-PartyEngineeringReviewer
http://proethica.org/ontology/intermediate#Third-PartyEngineeringReviewer
Attributes
entity_typeIndependent engineering firm
specialtyStormwater hydrologic modeling
engagement_basisThird-party review following flooding complaints
Confidence
0.88
Importance
medium
Relationships
typereports_to
targetCity C or affected parties
typereviews_work_of
targetPrincipal Engineer R
Role category
provider_client
Source Evidence
Source text
an independent analysis of the design seems to show stormwater runoff flows are larger after construction

Text references
After reviewing and verifying IBM's analysis and checking that analysis against R's own work
IBM's modeling show the subdivision created an issue
an independent analysis of the design seems to show stormwater runoff flows are larger after construction
TTL
@prefix case11: <http://proethica.org/ontology/case/11#> . @prefix owl: <http://www.w3.org/2002/07/owl#> . @prefix proeth: <http://proethica.org/ontology/intermediate#> . @prefix proeth-core: <http://proethica.org/ontology/core#> . @prefix prov: <http://www.w3.org/ns/prov#> . @prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> . @prefix xsd: <http://www.w3.org/2001/XMLSchema#> . case11:Firm_IBM_Independent_Reviewer a proeth:Third-PartyEngineeringReviewer, owl:NamedIndividual ; rdfs:label "Firm IBM Independent Reviewer" ; proeth-core:hasObligation case11:Firm_IBM_Objective_Complete_Reporting_Stormwater_Independent_Review ; proeth:attributes "{'entity_type': 'Independent engineering firm', 'specialty': 'Stormwater hydrologic modeling', 'engagement_basis': 'Third-party review following flooding complaints'}" ; proeth:caseinvolvement "Firm IBM conducted independent stormwater modeling and analysis of the BWJ subdivision design following complaints about post-construction flooding, finding that post-development runoff flows exceed pre-development conditions in conflict with City C requirements. IBM's analysis is used to establish the evidentiary basis for Engineer R's obligation to acknowledge design errors." ; proeth:conceptCategory "Role" ; proeth:confidence "0.88" ; proeth:discoveredincase "11" ; proeth:discoveredinpass "1" ; proeth:discoveredinsection "discussion" ; proeth:firstdiscoveredat "2026-02-24T20:36:28.229762+00:00" ; proeth:firstdiscoveredincase "11" ; proeth:generatedattime "2026-02-24T20:36:28.229762+00:00" ; proeth:importance "medium" ; proeth:relationships "{'type': 'reports_to', 'target': 'City C or affected parties'}", "{'type': 'reviews_work_of', 'target': 'Principal Engineer R'}" ; proeth:rolecategory "provider_client" ; proeth:roleclass "Third-Party Engineering Reviewer" ; proeth:sourcetext "an independent analysis of the design seems to show stormwater runoff flows are larger after construction" ; proeth:textreferences "After reviewing and verifying IBM's analysis and checking that analysis against R's own work", "IBM's modeling show the subdivision created an issue", "an independent analysis of the design seems to show stormwater runoff flows are larger after construction" ; proeth:wasattributedto "Case 11 Extraction" ; prov:generatedAtTime "2026-02-24T20:54:41.753270"^^xsd:dateTime ; prov:wasGeneratedBy "ProEthica Case 11 Extraction" .
Metadata
Type
Individual
Last Updated
2026-05-28 16:26
Discovered in case
11
Discovered in pass
1
Discovered in section
discussion
First discovered
2026-02-24T20:36:28.229762+00:00
First case
11
Generated
2026-02-24T20:36:28.229762+00:00
Attributed to
Case 11 Extraction
Generated
2026-02-24T20:54:41.753270
Generated by
ProEthica Case 11 Extraction