Firm IBM was engaged by City C as an independent third-party reviewer to evaluate the BWJ subdivision stormwater design following flooding complaints. IBM's independent modeling showed post-development runoff exceeding pre-development conditions in violation of City C's requirements.
Compliance status
met
Confidence
0.85
Importance
high
Obligated party
Firm IBM
Obligation statement
Firm IBM was obligated to conduct its independent stormwater analysis objectively and completely, reporting all findings accurately — including findings adverse to Firm BWJ's design — and including all relevant technical information in its report to City C, so that City C could make informed decisions about the subdivision design's regulatory compliance.
Temporal scope
During and upon completion of the independent stormwater analysis
Relationships
derivedFromPrinciple
Objectivity Invoked By City Engineer J Plan Review
Source Evidence
Source text
an independent analysis of the design seems to show stormwater runoff flows are larger after construction (in conflict with the City's requirements for peak flows being less than or equal to pre-development conditions)
Text references
Firm IBM conducted independent stormwater modeling and analysis of the BWJ subdivision design following complaints about post-construction flooding
an independent analysis of the design seems to show stormwater runoff flows are larger after construction (in conflict with the City's requirements for peak flows being less than or equal to pre-development conditions)
TTL
@prefix case11: <http://proethica.org/ontology/case/11#> .
@prefix owl: <http://www.w3.org/2002/07/owl#> .
@prefix proeth: <http://proethica.org/ontology/intermediate#> .
@prefix prov: <http://www.w3.org/ns/prov#> .
@prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> .
@prefix xsd: <http://www.w3.org/2001/XMLSchema#> .
case11:Firm_IBM_Objective_Complete_Reporting_Stormwater_Independent_Review a proeth:ObjectiveandCompleteReportingObligation,
owl:NamedIndividual ;
rdfs:label "Firm IBM Objective Complete Reporting Stormwater Independent Review" ;
proeth:casecontext "Firm IBM was engaged by City C as an independent third-party reviewer to evaluate the BWJ subdivision stormwater design following flooding complaints. IBM's independent modeling showed post-development runoff exceeding pre-development conditions in violation of City C's requirements." ;
proeth:compliancestatus "met" ;
proeth:conceptCategory "Obligation" ;
proeth:confidence "0.85" ;
proeth:derivedFromPrinciple case11:Objectivity_Invoked_By_City_Engineer_J_Plan_Review ;
proeth:discoveredincase "11" ;
proeth:discoveredinpass "2" ;
proeth:discoveredinsection "discussion" ;
proeth:firstdiscoveredat "2026-02-24T20:45:45.413800+00:00" ;
proeth:firstdiscoveredincase "11" ;
proeth:generatedattime "2026-02-24T20:45:45.413800+00:00" ;
proeth:importance "high" ;
proeth:obligatedparty "Firm IBM" ;
proeth:obligationclass "Objective and Complete Reporting Obligation" ;
proeth:obligationstatement "Firm IBM was obligated to conduct its independent stormwater analysis objectively and completely, reporting all findings accurately — including findings adverse to Firm BWJ's design — and including all relevant technical information in its report to City C, so that City C could make informed decisions about the subdivision design's regulatory compliance." ;
proeth:sourcetext "an independent analysis of the design seems to show stormwater runoff flows are larger after construction (in conflict with the City's requirements for peak flows being less than or equal to pre-development conditions)" ;
proeth:temporalscope "During and upon completion of the independent stormwater analysis" ;
proeth:textreferences "Firm IBM conducted independent stormwater modeling and analysis of the BWJ subdivision design following complaints about post-construction flooding",
"an independent analysis of the design seems to show stormwater runoff flows are larger after construction (in conflict with the City's requirements for peak flows being less than or equal to pre-development conditions)" ;
proeth:wasattributedto "Case 11 Extraction" ;
prov:generatedAtTime "2026-02-24T20:54:41.760841"^^xsd:dateTime ;
prov:wasGeneratedBy "ProEthica Case 11 Extraction" .
Metadata
Extraction details
Discovered in case
11
Discovered in pass
2
Discovered in section
discussion
First discovered
2026-02-24T20:45:45.413800+00:00
First case
11
Generated
2026-02-24T20:45:45.413800+00:00
Attributed to
Case 11 Extraction
Generated
2026-02-24T20:54:41.760841
Generated by
ProEthica Case 11 Extraction