Firm BWJ Regulatory Stormwater Compliance Remediation City C Subdivision

O · Obligation Individual
http://proethica.org/ontology/case/11#Firm_BWJ_Regulatory_Stormwater_Compliance_Remediation_City_C_Subdivision
Properties
Instance of
RegulatoryStormwaterComplianceRemediationObligation
http://proethica.org/ontology/intermediate#RegulatoryStormwaterComplianceRemediationObligation
Case context
The subdivision stormwater design failed to comply with City C's regulatory requirement that post-development runoff not exceed pre-development conditions, resulting in actual flooding and property damage to adjacent owners. Both IBM's independent modeling and empirical flooding evidence confirmed the non-compliance.
Compliance status
unclear
Confidence
0.88
Importance
high
Obligated party
Firm BWJ and Principal Engineer R
Obligation statement
Firm BWJ and Principal Engineer R were obligated to design and implement a workable corrective stormwater management system that brings the subdivision into compliance with City C's regulatory requirement that post-development runoff not exceed pre-development conditions, thereby eliminating the flooding harm experienced by adjacent property owners.
Temporal scope
Following acknowledgment of the error and completion of fault allocation; ongoing until corrective design is constructed and verified
Source Evidence
Source text
Ultimately a workable design must be identified, designed, and constructed that serves the citizens of City C.

Text references
Ultimately a workable design must be identified, designed, and constructed that serves the citizens of City C.
both actual flood damage and IBM's modeling suggests that the subdivision design failed to comply with City C's regulatory requirement that post-development runoff not exceed pre-development runoff
TTL
@prefix case11: <http://proethica.org/ontology/case/11#> . @prefix owl: <http://www.w3.org/2002/07/owl#> . @prefix proeth: <http://proethica.org/ontology/intermediate#> . @prefix proeth-core: <http://proethica.org/ontology/core#> . @prefix prov: <http://www.w3.org/ns/prov#> . @prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> . @prefix xsd: <http://www.w3.org/2001/XMLSchema#> . case11:Firm_BWJ_Regulatory_Stormwater_Compliance_Remediation_City_C_Subdivision a proeth:RegulatoryStormwaterComplianceRemediationObligation, owl:NamedIndividual ; rdfs:label "Firm BWJ Regulatory Stormwater Compliance Remediation City C Subdivision" ; proeth-core:competesWith case11:Principal_Engineer_R_Regulatory_Compliance_Verification_Stormwater_Design ; proeth-core:defeasibleUnder case11:Subdivision_Causation_Complexity, case11:Third-Party_Property_Owner_Actions_Complicating_Flood_Causation ; proeth-core:prevailsOver case11:Principal_Engineer_R_Regulatory_Compliance_Verification_Stormwater_Design ; proeth:casecontext "The subdivision stormwater design failed to comply with City C's regulatory requirement that post-development runoff not exceed pre-development conditions, resulting in actual flooding and property damage to adjacent owners. Both IBM's independent modeling and empirical flooding evidence confirmed the non-compliance." ; proeth:compliancestatus "unclear" ; proeth:conceptCategory "Obligation" ; proeth:confidence "0.88" ; proeth:derivedFromPrinciple case11:Public_Welfare_Paramount_Invoked_By_BWJ_Subdivision_Design, case11:Regulatory_Compliance_Verification_Invoked_By_BWJ_Stormwater_Design ; proeth:discoveredincase "11" ; proeth:discoveredinpass "2" ; proeth:discoveredinsection "discussion" ; proeth:firstdiscoveredat "2026-02-24T20:45:45.413800+00:00" ; proeth:firstdiscoveredincase "11" ; proeth:generatedattime "2026-02-24T20:45:45.413800+00:00" ; proeth:importance "high" ; proeth:obligatedparty "Firm BWJ and Principal Engineer R" ; proeth:obligationclass "Regulatory Stormwater Compliance Remediation Obligation" ; proeth:obligationstatement "Firm BWJ and Principal Engineer R were obligated to design and implement a workable corrective stormwater management system that brings the subdivision into compliance with City C's regulatory requirement that post-development runoff not exceed pre-development conditions, thereby eliminating the flooding harm experienced by adjacent property owners." ; proeth:sourcetext "Ultimately a workable design must be identified, designed, and constructed that serves the citizens of City C." ; proeth:temporalscope "Following acknowledgment of the error and completion of fault allocation; ongoing until corrective design is constructed and verified" ; proeth:textreferences "Ultimately a workable design must be identified, designed, and constructed that serves the citizens of City C.", "both actual flood damage and IBM's modeling suggests that the subdivision design failed to comply with City C's regulatory requirement that post-development runoff not exceed pre-development runoff" ; proeth:wasattributedto "Case 11 Extraction" ; prov:generatedAtTime "2026-02-24T20:54:41.760424"^^xsd:dateTime ; prov:wasGeneratedBy "ProEthica Case 11 Extraction" .
Metadata
Type
Individual
Last Updated
2026-05-28 16:26
Discovered in case
11
Discovered in pass
2
Discovered in section
discussion
First discovered
2026-02-24T20:45:45.413800+00:00
First case
11
Generated
2026-02-24T20:45:45.413800+00:00
Attributed to
Case 11 Extraction
Generated
2026-02-24T20:54:41.760424
Generated by
ProEthica Case 11 Extraction