Subdivision Causation Complexity

S · State Individual
http://proethica.org/ontology/case/11#Subdivision_Causation_Complexity
Properties
Instance of
ContributingThird-PartyActionComplicatingCausationState
http://proethica.org/ontology/intermediate#ContributingThird-PartyActionComplicatingCausationState
Active period
From the point harm materialized through the fault determination and allocation process
Affected parties
Adjacent property owners
City C
Firm BWJ
Other potentially contributing parties
Principal Engineer R
Confidence
0.8
Importance
medium
Subject
Causal complexity in attributing flooding harm between Engineer R's design deficiency and potential third-party contributions
Terminated by
Completion of fault determination and allocation process among all involved parties
Triggering event
Recognition that multiple parties may bear responsibility for the flooding outcomes, requiring allocation of fault before corrective obligations can be fully assigned
Urgency level
medium
Source Evidence
Source text
There may be a determination / allocation of fault by all parties involved.

Text references
There may be a determination / allocation of fault by all parties involved.
Ultimately a workable design must be identified, designed, and constructed that serves the citizens of City C.
TTL
@prefix case11: <http://proethica.org/ontology/case/11#> . @prefix owl: <http://www.w3.org/2002/07/owl#> . @prefix proeth: <http://proethica.org/ontology/intermediate#> . @prefix prov: <http://www.w3.org/ns/prov#> . @prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> . @prefix xsd: <http://www.w3.org/2001/XMLSchema#> . case11:Subdivision_Causation_Complexity a proeth:ContributingThird-PartyActionComplicatingCausationState, owl:NamedIndividual ; rdfs:label "Subdivision Causation Complexity" ; proeth:activeperiod "From the point harm materialized through the fault determination and allocation process" ; proeth:affectedparties "Adjacent property owners", "City C", "Firm BWJ", "Other potentially contributing parties", "Principal Engineer R" ; proeth:conceptCategory "State" ; proeth:confidence "0.8" ; proeth:discoveredincase "11" ; proeth:discoveredinpass "1" ; proeth:discoveredinsection "discussion" ; proeth:firstdiscoveredat "2026-02-24T20:36:41.701431+00:00" ; proeth:firstdiscoveredincase "11" ; proeth:generatedattime "2026-02-24T20:36:41.701431+00:00" ; proeth:importance "medium" ; proeth:sourcetext "There may be a determination / allocation of fault by all parties involved." ; proeth:stateclass "Contributing Third-Party Action Complicating Causation State" ; proeth:subject "Causal complexity in attributing flooding harm between Engineer R's design deficiency and potential third-party contributions" ; proeth:terminatedby "Completion of fault determination and allocation process among all involved parties" ; proeth:textreferences "There may be a determination / allocation of fault by all parties involved.", "Ultimately a workable design must be identified, designed, and constructed that serves the citizens of City C." ; proeth:triggeringevent "Recognition that multiple parties may bear responsibility for the flooding outcomes, requiring allocation of fault before corrective obligations can be fully assigned" ; proeth:urgencylevel "medium" ; proeth:wasattributedto "Case 11 Extraction" ; prov:generatedAtTime "2026-02-24T20:54:41.754301"^^xsd:dateTime ; prov:wasGeneratedBy "ProEthica Case 11 Extraction" .
Metadata
Type
Individual
Last Updated
2026-05-28 16:26
Discovered in case
11
Discovered in pass
1
Discovered in section
discussion
First discovered
2026-02-24T20:36:41.701431+00:00
First case
11
Generated
2026-02-24T20:36:41.701431+00:00
Attributed to
Case 11 Extraction
Generated
2026-02-24T20:54:41.754301
Generated by
ProEthica Case 11 Extraction