Post-Award Unbuildability Discovery State

Class 8f91cce4
http://proethica.org/ontology/intermediate#Post-AwardUnbuildabilityDiscoveryState
Definition

State in which, after a construction contract has been awarded to a low bidder through a competitive procurement process, the contractor identifies that portions of the engineering design are materially deficient, incomplete, or physically impossible to construct as specified — requiring major design changes before construction can proceed, and triggering obligations on the engineer of record to address the deficiencies and disclose their origin.

Properties
Subclass of
State
http://proethica.org/ontology/core#State
Definition
State in which, after a construction contract has been awarded to a low bidder through a competitive procurement process, the contractor identifies that portions of the engineering design are materially deficient, incomplete, or physically impossible to construct as specified — requiring major design changes before construction can proceed, and triggering obligations on the engineer of record to address the deficiencies and disclose their origin.
Source Evidence
Source Text
Engineer C, owner of Hi-Lo Construction, that much of the design detail is lacking in the drawings and specifications and that Hi-Lo Construction declares that certain parts of the project are 'unbuildable' without major changes
TTL
@prefix rdf: <http://www.w3.org/1999/02/22-rdf-syntax-ns#> . @prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> . @prefix owl: <http://www.w3.org/2002/07/owl#> . @prefix proethica_intermediate_extended: <http://proethica.org/ontology/intermediate-extended> . <http://proethica.org/ontology/intermediate#Post-AwardUnbuildabilityDiscoveryState> a owl:Class ; rdfs:label "Post-Award Unbuildability Discovery State" ; rdfs:comment "State in which, after a construction contract has been awarded to a low bidder through a competitive procurement process, the contractor identifies that portions of the engineering design are materially deficient, incomplete, or physically impossible to construct as specified — requiring major design changes before construction can proceed, and triggering obligations on the engineer of record to address the deficiencies and disclose their origin." ; rdfs:subClassOf <http://proethica.org/ontology/core#State> .
Metadata
Type
Class
Content Hash
8f91cce47bafd6a4...
Last Updated
2026-03-12 16:49
Extraction Provenance
Discovered in Case
85
Discovered In Pass
1
Discovered In Section
facts
First Discovered At
2026-03-01T04:12:37.396831+00:00
First Discovered In Case
85
Generated
2026-03-01T04:12:37.396831+00:00
Was Attributed To
Case 85 Extraction