Federal Grant Project Requirement Resource

Class
http://proethica.org/ontology/intermediate#FederalGrantProjectRequirementResource
Definition

Federal agency requirements and conditions attached to grant-funded public infrastructure projects, including review and approval procedures for engineering documents and constraints on the use of federal funds.

Properties
Subclass of
LegalResource
http://proethica.org/ontology/intermediate#LegalResource
Authority Source
Federal grant-making agencies
Confidence
0.78
Extensional Function
Establishes the regulatory and procedural framework within which federally funded engineering projects must operate, including approval authority and funding constraints.
Resource Category
legal_resource
Usage Context
Cost overrun and funding adequacy determinations
Engineering document approval
Federally funded infrastructure design
Match Confidence
0.0
Matches Existing
false
Source Evidence
Text references
Engineer A was confident that sufficient federal funds (and not local funding) would cover any potential increased costs
approved by Engineer B of the engineering staff of the federal agency funding the project

Source text
approved by Engineer B of the engineering staff of the federal agency funding the project
TTL
@prefix owl: <http://www.w3.org/2002/07/owl#> . @prefix proeth: <http://proethica.org/ontology/intermediate#> . @prefix proeth-prov: <http://proethica.org/provenance#> . @prefix prov: <http://www.w3.org/ns/prov#> . @prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> . @prefix skos: <http://www.w3.org/2004/02/skos/core#> . @prefix xsd: <http://www.w3.org/2001/XMLSchema#> . proeth:FederalGrantProjectRequirementResource a owl:Class ; rdfs:label "Federal Grant Project Requirement Resource" ; proeth:authoritySource "Federal grant-making agencies" ; proeth:confidence "0.78" ; proeth:extensionalFunction "Establishes the regulatory and procedural framework within which federally funded engineering projects must operate, including approval authority and funding constraints." ; proeth:resourceCategory "legal_resource" ; proeth:textReferences "Engineer A was confident that sufficient federal funds (and not local funding) would cover any potential increased costs", "approved by Engineer B of the engineering staff of the federal agency funding the project" ; proeth:usageContext "Cost overrun and funding adequacy determinations", "Engineering document approval", "Federally funded infrastructure design" ; proeth-prov:discoveredInCase 85 ; proeth-prov:discoveredInPass 1 ; proeth-prov:discoveredInSection "facts" ; proeth-prov:firstDiscoveredAt "2026-06-04T16:45:36.674624+00:00"^^xsd:dateTime ; proeth-prov:firstDiscoveredInCase 85 ; proeth-prov:matchConfidence 0.0 ; proeth-prov:matchesExisting false ; proeth-prov:sourceText "approved by Engineer B of the engineering staff of the federal agency funding the project" ; rdfs:comment "Federal agency requirements and conditions attached to grant-funded public infrastructure projects, including review and approval procedures for engineering documents and constraints on the use of federal funds." ; rdfs:subClassOf proeth:LegalResource ; skos:definition "Federal agency requirements and conditions attached to grant-funded public infrastructure projects, including review and approval procedures for engineering documents and constraints on the use of federal funds." ; prov:generatedAtTime "2026-06-04T16:45:36.674624+00:00"^^xsd:dateTime ; prov:wasAttributedTo "Case 85 Extraction", "claude-sonnet-4-6" .
Metadata
Type
Class
Last Updated
2026-06-05 11:56
Discovered in case
85
Discovered in pass
1
Discovered in section
facts
First discovered
2026-06-04T16:45:36.674624+00:00
First case
85
Generated
2026-06-04T16:45:36.674624+00:00
Attributed to
['Case 85 Extraction', 'claude-sonnet-4-6']