Cost-Objecting Safety Staffing Refusing Client

Class 5919e8e0
http://proethica.org/ontology/intermediate#Cost-ObjectingSafetyStaffingRefusingClient
Definition

A client stakeholder role in which a party retains an engineer for complete engineering services on a project, is advised by the engineer that a specific safety staffing measure (such as a full-time on-site project representative) is required due to the dangerous nature of the construction phase, and refuses to authorize that measure on grounds of cost — thereby generating pressure on the engineer to abandon the safety recommendation and proceed without the required safeguard.

Properties
Subclass of
ProviderClientRole
http://proethica.org/ontology/intermediate#ProviderClientRole
Definition
A client stakeholder role in which a party retains an engineer for complete engineering services on a project, is advised by the engineer that a specific safety staffing measure (such as a full-time on-site project representative) is required due to the dangerous nature of the construction phase, and refuses to authorize that measure on grounds of cost — thereby generating pressure on the engineer to abandon the safety recommendation and proceed without the required safeguard.
Source Evidence
Source Text
the client indicated to Engineer A that the project would be too costly if such a representative were hired
TTL
@prefix rdf: <http://www.w3.org/1999/02/22-rdf-syntax-ns#> . @prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> . @prefix owl: <http://www.w3.org/2002/07/owl#> . @prefix proethica_intermediate_extended: <http://proethica.org/ontology/intermediate-extended> . <http://proethica.org/ontology/intermediate#Cost-ObjectingSafetyStaffingRefusingClient> a owl:Class ; rdfs:label "Cost-Objecting Safety Staffing Refusing Client" ; rdfs:comment "A client stakeholder role in which a party retains an engineer for complete engineering services on a project, is advised by the engineer that a specific safety staffing measure (such as a full-time on-site project representative) is required due to the dangerous nature of the construction phase, and refuses to authorize that measure on grounds of cost — thereby generating pressure on the engineer to abandon the safety recommendation and proceed without the required safeguard." ; rdfs:subClassOf <http://proethica.org/ontology/intermediate#ProviderClientRole> .
Metadata
Type
Class
Content Hash
5919e8e0b6f80410...
Last Updated
2026-03-12 16:49
Extraction Provenance
Discovered in Case
136
Discovered In Pass
1
Discovered In Section
discussion
First Discovered At
2026-03-01T12:53:54.922882+00:00
First Discovered In Case
136
Generated
2026-03-01T12:53:54.922882+00:00
Was Attributed To
Case 136 Extraction