Owner BER Case 93-4 Client

R · Role Individual
http://proethica.org/ontology/case/98#Owner_BER_Case_93-4_Client
Definition

Retained Engineer A for design and construction-phase services; party to a dispute with the General Contractor over acceptability of a concrete pour; accepted Engineer A's impartial interpretation but criticized Engineer A for not finding in Owner's favor on grounds of loyalty; cited as precedent illustrating the limits of the faithful agent duty.

Properties
Instance of
Provider-ClientRole
http://proethica.org/ontology/intermediate#Provider-ClientRole
Attributes
entity_typeProject owner
projectConstruction project (BER Case 93-4)
Confidence
0.85
Importance
medium
Relationships
typedispute_party
targetGeneral Contractor (BER Case 93-4)
typeretained
targetEngineer A Construction Dispute Impartial Interpreter
Role category
provider_client
Source Evidence
Source text
Engineer A was retained by an Owner to provide both design and construction-phase services.

Text references
Engineer A was retained by an Owner to provide both design and construction-phase services.
The Owner accepted Engineer A's interpretation, but also criticized Engineer A, claiming that because of Engineer A's ethical duty of loyalty to the Owner, Engineer A should have found in Owner's favor.
TTL
@prefix case98: <http://proethica.org/ontology/case/98#> . @prefix owl: <http://www.w3.org/2002/07/owl#> . @prefix proeth: <http://proethica.org/ontology/intermediate#> . @prefix prov: <http://www.w3.org/ns/prov#> . @prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> . @prefix xsd: <http://www.w3.org/2001/XMLSchema#> . case98:Owner_BER_Case_93-4_Client a proeth:Provider-ClientRole, owl:NamedIndividual ; rdfs:label "Owner BER Case 93-4 Client" ; proeth:attributes "{'entity_type': 'Project owner', 'project': 'Construction project (BER Case 93-4)'}" ; proeth:caseinvolvement "Retained Engineer A for design and construction-phase services; party to a dispute with the General Contractor over acceptability of a concrete pour; accepted Engineer A's impartial interpretation but criticized Engineer A for not finding in Owner's favor on grounds of loyalty; cited as precedent illustrating the limits of the faithful agent duty." ; proeth:conceptCategory "Role" ; proeth:confidence "0.85" ; proeth:discoveredincase "98" ; proeth:discoveredinpass "1" ; proeth:discoveredinsection "discussion" ; proeth:firstdiscoveredat "2026-02-28T00:31:34.323654+00:00" ; proeth:firstdiscoveredincase "98" ; proeth:generatedattime "2026-02-28T00:31:34.323654+00:00" ; proeth:importance "medium" ; proeth:relationships "{'type': 'dispute_party', 'target': 'General Contractor (BER Case 93-4)'}", "{'type': 'retained', 'target': 'Engineer A Construction Dispute Impartial Interpreter'}" ; proeth:rolecategory "provider_client" ; proeth:roleclass "Provider-Client Role" ; proeth:sourcetext "Engineer A was retained by an Owner to provide both design and construction-phase services." ; proeth:textreferences "Engineer A was retained by an Owner to provide both design and construction-phase services.", "The Owner accepted Engineer A's interpretation, but also criticized Engineer A, claiming that because of Engineer A's ethical duty of loyalty to the Owner, Engineer A should have found in Owner's favor." ; proeth:wasattributedto "Case 98 Extraction" ; prov:generatedAtTime "2026-02-28T00:43:22.140091"^^xsd:dateTime ; prov:wasGeneratedBy "ProEthica Case 98 Extraction" .
Metadata
Type
Individual
Last Updated
2026-05-28 16:26
Discovered in case
98
Discovered in pass
1
Discovered in section
discussion
First discovered
2026-02-28T00:31:34.323654+00:00
First case
98
Generated
2026-02-28T00:31:34.323654+00:00
Attributed to
Case 98 Extraction
Generated
2026-02-28T00:43:22.140091
Generated by
ProEthica Case 98 Extraction