Faithful Agent Obligation Invoked Engineer A Municipality Client

P · Principle Individual
http://proethica.org/ontology/case/98#Faithful_Agent_Obligation_Invoked_Engineer_A_Municipality_Client
Properties
Instance of
FaithfulAgentObligationWithinEthicalLimits
http://proethica.org/ontology/intermediate#FaithfulAgentObligationWithinEthicalLimits
Applied to
Decision whether to consult Contractor B informally
Design of water treatment facility for Municipality
Balancing with
Equal Competitive Access in Design-Phase Consultation
Procurement Integrity in Public Engineering
Concrete expression
Engineer A's obligation to serve the Municipality faithfully — including by producing the best possible design documents — must be fulfilled within the ethical limits imposed by procurement fairness, meaning Engineer A cannot justify informal selective consultation with Contractor B on the grounds that it serves the client's design quality interests
Confidence
0.85
Importance
high
Interpretation
Faithful agency to the Municipality encompasses both design quality and procurement integrity — a faithful agent does not improve design quality through means that would expose the client's procurement process to legal challenge or public criticism
Invoked by
Engineer A Water Treatment Facility Design Engineer Present Case
Tension resolution
Faithful agency is best served by proposing a formal constructability meeting that achieves design quality improvement without compromising procurement integrity
Source Evidence
Source text
Firm X is retained by a municipality to design a water treatment facility

Text references
Engineer A believes that the design documents and the overall project would benefit from discussions with Contractor B
Firm X is retained by a municipality to design a water treatment facility
TTL
@prefix case98: <http://proethica.org/ontology/case/98#> . @prefix owl: <http://www.w3.org/2002/07/owl#> . @prefix proeth: <http://proethica.org/ontology/intermediate#> . @prefix prov: <http://www.w3.org/ns/prov#> . @prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> . @prefix xsd: <http://www.w3.org/2001/XMLSchema#> . case98:Faithful_Agent_Obligation_Invoked_Engineer_A_Municipality_Client a proeth:FaithfulAgentObligationWithinEthicalLimits, owl:NamedIndividual ; rdfs:label "Faithful Agent Obligation Invoked Engineer A Municipality Client" ; proeth:appliedto "Decision whether to consult Contractor B informally", "Design of water treatment facility for Municipality" ; proeth:balancingwith "Equal Competitive Access in Design-Phase Consultation", "Procurement Integrity in Public Engineering" ; proeth:conceptCategory "Principle" ; proeth:concreteexpression "Engineer A's obligation to serve the Municipality faithfully — including by producing the best possible design documents — must be fulfilled within the ethical limits imposed by procurement fairness, meaning Engineer A cannot justify informal selective consultation with Contractor B on the grounds that it serves the client's design quality interests" ; proeth:confidence "0.85" ; proeth:discoveredincase "98" ; proeth:discoveredinpass "2" ; proeth:discoveredinsection "facts" ; proeth:firstdiscoveredat "2026-02-28T00:33:01.909102+00:00" ; proeth:firstdiscoveredincase "98" ; proeth:generatedattime "2026-02-28T00:33:01.909102+00:00" ; proeth:importance "high" ; proeth:interpretation "Faithful agency to the Municipality encompasses both design quality and procurement integrity — a faithful agent does not improve design quality through means that would expose the client's procurement process to legal challenge or public criticism" ; proeth:invokedby "Engineer A Water Treatment Facility Design Engineer Present Case" ; proeth:principleclass "Faithful Agent Obligation Within Ethical Limits" ; proeth:sourcetext "Firm X is retained by a municipality to design a water treatment facility" ; proeth:tensionresolution "Faithful agency is best served by proposing a formal constructability meeting that achieves design quality improvement without compromising procurement integrity" ; proeth:textreferences "Engineer A believes that the design documents and the overall project would benefit from discussions with Contractor B", "Firm X is retained by a municipality to design a water treatment facility" ; proeth:wasattributedto "Case 98 Extraction" ; prov:generatedAtTime "2026-02-28T00:43:22.139418"^^xsd:dateTime ; prov:wasGeneratedBy "ProEthica Case 98 Extraction" .
Metadata
Type
Individual
Last Updated
2026-05-28 16:26
Discovered in case
98
Discovered in pass
2
Discovered in section
facts
First discovered
2026-02-28T00:33:01.909102+00:00
First case
98
Generated
2026-02-28T00:33:01.909102+00:00
Attributed to
Case 98 Extraction
Generated
2026-02-28T00:43:22.139418
Generated by
ProEthica Case 98 Extraction