Contractor B Prospective Bidder Constructability Consultant Present Case

R · Role Individual
http://proethica.org/ontology/case/98#Contractor_B_Prospective_Bidder_Constructability_Consultant_Present_Case
Definition

A contractor with whom Engineer A had a prior working relationship, informally consulted by Engineer A on constructability issues during the design phase of the public water treatment facility project, while simultaneously being a potential bidder on the construction contract, generating procurement fairness concerns.

Properties
Instance of
ProspectiveBidderConstructabilityConsultant
http://proethica.org/ontology/intermediate#ProspectiveBidderConstructabilityConsultant
Attributes
entity_typeConstruction contractor
statusProspective bidder and informal constructability consultant
Confidence
0.88
Importance
medium
Relationships
typeinformally_consulted_by
targetEngineer A Water Treatment Facility Design Engineer Present Case
typepotential_bidder_on
targetMunicipal Client water treatment facility project
Role category
provider_client
Source Evidence
Source text
Rather than consulting solely with Contractor B, Engineer A could have conducted a publically advertised constructability meeting

Text references
Rather than consulting solely with Contractor B, Engineer A could have conducted a publically advertised constructability meeting
TTL
@prefix case98: <http://proethica.org/ontology/case/98#> . @prefix owl: <http://www.w3.org/2002/07/owl#> . @prefix proeth: <http://proethica.org/ontology/intermediate#> . @prefix prov: <http://www.w3.org/ns/prov#> . @prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> . @prefix xsd: <http://www.w3.org/2001/XMLSchema#> . case98:Contractor_B_Prospective_Bidder_Constructability_Consultant_Present_Case a proeth:ProspectiveBidderConstructabilityConsultant, owl:NamedIndividual ; rdfs:label "Contractor B Prospective Bidder Constructability Consultant Present Case" ; proeth:attributes "{'entity_type': 'Construction contractor', 'status': 'Prospective bidder and informal constructability consultant'}" ; proeth:caseinvolvement "A contractor with whom Engineer A had a prior working relationship, informally consulted by Engineer A on constructability issues during the design phase of the public water treatment facility project, while simultaneously being a potential bidder on the construction contract, generating procurement fairness concerns." ; proeth:conceptCategory "Role" ; proeth:confidence "0.88" ; proeth:discoveredincase "98" ; proeth:discoveredinpass "1" ; proeth:discoveredinsection "discussion" ; proeth:firstdiscoveredat "2026-02-28T00:31:34.323654+00:00" ; proeth:firstdiscoveredincase "98" ; proeth:generatedattime "2026-02-28T00:31:34.323654+00:00" ; proeth:importance "medium" ; proeth:relationships "{'type': 'informally_consulted_by', 'target': 'Engineer A Water Treatment Facility Design Engineer Present Case'}", "{'type': 'potential_bidder_on', 'target': 'Municipal Client water treatment facility project'}" ; proeth:rolecategory "provider_client" ; proeth:roleclass "Prospective Bidder Constructability Consultant" ; proeth:sourcetext "Rather than consulting solely with Contractor B, Engineer A could have conducted a publically advertised constructability meeting" ; proeth:textreferences "Rather than consulting solely with Contractor B, Engineer A could have conducted a publically advertised constructability meeting" ; proeth:wasattributedto "Case 98 Extraction" ; prov:generatedAtTime "2026-02-28T00:43:22.140248"^^xsd:dateTime ; prov:wasGeneratedBy "ProEthica Case 98 Extraction" .
Metadata
Type
Individual
Last Updated
2026-05-28 16:26
Discovered in case
98
Discovered in pass
1
Discovered in section
discussion
First discovered
2026-02-28T00:31:34.323654+00:00
First case
98
Generated
2026-02-28T00:31:34.323654+00:00
Attributed to
Case 98 Extraction
Generated
2026-02-28T00:43:22.140248
Generated by
ProEthica Case 98 Extraction