ABC Engineering Post-Review Design-Build Conflict Disclosure to State Agency
O · Obligation
Individual
http://proethica.org/ontology/case/96#ABC_Engineering_Post-Review_Design-Build_Conflict_Disclosure_to_State_Agency
Properties
Instance of
Post-ReviewDesign-BuildParticipationConflictDisclosureObligation
http://proethica.org/ontology/intermediate#Post-ReviewDesign-BuildParticipationConflictDisclosureObligation
Case context
ABC Engineering completed an independent external peer review of the state agency's major transportation project design, gaining access to construction plans and specifications that were subsequently incorporated into the design-build RFP. Approximately one year later, XYZ Construction invited ABC Engineering to join a design-build joint venture for the same project.
Compliance status
unclear
Confidence
0.91
Importance
high
Obligated party
ABC Engineering (Engineer A)
Obligation statement
Before accepting XYZ Construction's invitation to participate in the design-build joint venture and submit a proposal for the major road transportation project, ABC Engineering is obligated to disclose to the state agency its prior role as independent external peer reviewer of the same project — including the nature and scope of privileged access to construction plans and specifications obtained during the review — so that the agency can make an informed determination about whether ABC Engineering's participation in the design-build procurement is appropriate and legally compliant.
Temporal scope
Before accepting XYZ Construction's invitation or submitting any design-build proposal in response to the state agency's RFP
Relationships
competesWith
ABC Engineering Peer Review Privileged Access Non-Exploitation in Design-Build Procurement
defeasibleUnder
ABC Engineering Conflict of Interest State
Source Evidence
Source text
ABC Engineering is retained by a state agency to participate in an independent external peer review of the design of a major state-funded transportation project.
Text references
ABC Engineering is retained by a state agency to participate in an independent external peer review of the design of a major state-funded transportation project.
Approximately one-year after ABC Engineering completes the peer review, the state agency issues an RFP soliciting proposals for design-build services to complete the major road transportation project.
XYZ Construction invites ABC Engineering to participate in a design-build joint venture and submit a proposal for the major road transportation project.
TTL
@prefix case96: <http://proethica.org/ontology/case/96#> .
@prefix owl: <http://www.w3.org/2002/07/owl#> .
@prefix proeth: <http://proethica.org/ontology/intermediate#> .
@prefix proeth-core: <http://proethica.org/ontology/core#> .
@prefix prov: <http://www.w3.org/ns/prov#> .
@prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> .
@prefix xsd: <http://www.w3.org/2001/XMLSchema#> .
case96:ABC_Engineering_Post-Review_Design-Build_Conflict_Disclosure_to_State_Agency a proeth:Post-ReviewDesign-BuildParticipationConflictDisclosureObligation,
owl:NamedIndividual ;
rdfs:label "ABC Engineering Post-Review Design-Build Conflict Disclosure to State Agency" ;
proeth-core:competesWith case96:ABC_Engineering_Peer_Review_Privileged_Access_Non-Exploitation_in_Design-Build_Procurement ;
proeth-core:defeasibleUnder case96:ABC_Engineering_Conflict_of_Interest_State ;
proeth-core:prevailsOver case96:ABC_Engineering_Post-Review_Design-Build_Participation_Agency_Approval_Prerequisite ;
proeth:casecontext "ABC Engineering completed an independent external peer review of the state agency's major transportation project design, gaining access to construction plans and specifications that were subsequently incorporated into the design-build RFP. Approximately one year later, XYZ Construction invited ABC Engineering to join a design-build joint venture for the same project." ;
proeth:compliancestatus "unclear" ;
proeth:conceptCategory "Obligation" ;
proeth:confidence "0.91" ;
proeth:derivedFromPrinciple case96:Dual_Role_Appearance_of_Impropriety_Avoidance_Invoked_by_ABC_Engineering_Sequential_Role_Transition,
case96:Post-Review_Conflict_of_Interest_Avoidance_Invoked_by_ABC_Engineering_Design-Build_Participation_Decision ;
proeth:discoveredincase "96" ;
proeth:discoveredinpass "2" ;
proeth:discoveredinsection "facts" ;
proeth:firstdiscoveredat "2026-02-27T21:47:47.576292+00:00" ;
proeth:firstdiscoveredincase "96" ;
proeth:generatedattime "2026-02-27T21:47:47.576292+00:00" ;
proeth:importance "high" ;
proeth:obligatedparty "ABC Engineering (Engineer A)" ;
proeth:obligationclass "Post-Review Design-Build Participation Conflict Disclosure Obligation" ;
proeth:obligationstatement "Before accepting XYZ Construction's invitation to participate in the design-build joint venture and submit a proposal for the major road transportation project, ABC Engineering is obligated to disclose to the state agency its prior role as independent external peer reviewer of the same project — including the nature and scope of privileged access to construction plans and specifications obtained during the review — so that the agency can make an informed determination about whether ABC Engineering's participation in the design-build procurement is appropriate and legally compliant." ;
proeth:sourcetext "ABC Engineering is retained by a state agency to participate in an independent external peer review of the design of a major state-funded transportation project." ;
proeth:temporalscope "Before accepting XYZ Construction's invitation or submitting any design-build proposal in response to the state agency's RFP" ;
proeth:textreferences "ABC Engineering is retained by a state agency to participate in an independent external peer review of the design of a major state-funded transportation project.",
"Approximately one-year after ABC Engineering completes the peer review, the state agency issues an RFP soliciting proposals for design-build services to complete the major road transportation project.",
"XYZ Construction invites ABC Engineering to participate in a design-build joint venture and submit a proposal for the major road transportation project." ;
proeth:wasattributedto "Case 96 Extraction" ;
prov:generatedAtTime "2026-02-27T22:02:18.115954"^^xsd:dateTime ;
prov:wasGeneratedBy "ProEthica Case 96 Extraction" .
Metadata
Extraction details
Discovered in case
96
Discovered in pass
2
Discovered in section
facts
First discovered
2026-02-27T21:47:47.576292+00:00
First case
96
Generated
2026-02-27T21:47:47.576292+00:00
Attributed to
Case 96 Extraction
Generated
2026-02-27T22:02:18.115954
Generated by
ProEthica Case 96 Extraction