Professional-Report-Integrity-Standard

Rs · Resource Individual
http://proethica.org/ontology/case/94#Professional-Report-Integrity-Standard
Properties
Instance of
ProfessionalReportIntegrityStandard
http://proethica.org/ontology/intermediate#ProfessionalReportIntegrityStandard
Confidence
0.83
Created by
NSPE Board of Ethical Review (derived from BER case analysis)
Document title
Professional Report Integrity Standard
Importance
medium
Used by
Engineer A when structuring and delivering the public hearing presentation
Used in context
Governs the completeness and accuracy of Engineer A's public presentation, prohibiting selective framing of findings in ways that create a misleadingly positive impression of the project's impacts before the City Planning Board
Source Evidence
Source text
Engineer A highlights the improved environmental effect of converting the waterfront from an industrial facility to a parkland.

Text references
Engineer A highlights the improved environmental effect of converting the waterfront from an industrial facility to a parkland.
Engineer A is aware of these factors, but was not specifically questioned on these factors and does not volunteer this fact.
TTL
@prefix case94: <http://proethica.org/ontology/case/94#> . @prefix owl: <http://www.w3.org/2002/07/owl#> . @prefix proeth: <http://proethica.org/ontology/intermediate#> . @prefix prov: <http://www.w3.org/ns/prov#> . @prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> . @prefix xsd: <http://www.w3.org/2001/XMLSchema#> . case94:Professional-Report-Integrity-Standard a proeth:ProfessionalReportIntegrityStandard, owl:NamedIndividual ; rdfs:label "Professional-Report-Integrity-Standard" ; proeth:conceptCategory "Resource" ; proeth:confidence "0.83" ; proeth:createdby "NSPE Board of Ethical Review (derived from BER case analysis)" ; proeth:discoveredincase "94" ; proeth:discoveredinpass "1" ; proeth:discoveredinsection "facts" ; proeth:documenttitle "Professional Report Integrity Standard" ; proeth:firstdiscoveredat "2026-02-28T18:49:20.166645+00:00" ; proeth:firstdiscoveredincase "94" ; proeth:generatedattime "2026-02-28T18:49:20.166645+00:00" ; proeth:importance "medium" ; proeth:resourceclass "Professional Report Integrity Standard" ; proeth:sourcetext "Engineer A highlights the improved environmental effect of converting the waterfront from an industrial facility to a parkland." ; proeth:textreferences "Engineer A highlights the improved environmental effect of converting the waterfront from an industrial facility to a parkland.", "Engineer A is aware of these factors, but was not specifically questioned on these factors and does not volunteer this fact." ; proeth:usedby "Engineer A when structuring and delivering the public hearing presentation" ; proeth:usedincontext "Governs the completeness and accuracy of Engineer A's public presentation, prohibiting selective framing of findings in ways that create a misleadingly positive impression of the project's impacts before the City Planning Board" ; proeth:wasattributedto "Case 94 Extraction" ; prov:generatedAtTime "2026-02-28T19:13:05.759472"^^xsd:dateTime ; prov:wasGeneratedBy "ProEthica Case 94 Extraction" .
Metadata
Type
Individual
Last Updated
2026-05-28 16:26
Discovered in case
94
Discovered in pass
1
Discovered in section
facts
First discovered
2026-02-28T18:49:20.166645+00:00
First case
94
Generated
2026-02-28T18:49:20.166645+00:00
Attributed to
Case 94 Extraction
Generated
2026-02-28T19:13:05.759472
Generated by
ProEthica Case 94 Extraction