Engineer T Contractually Transferred Safety Responsibility

S · State Individual
http://proethica.org/ontology/case/9#Engineer_T_Contractually_Transferred_Safety_Responsibility
Properties
Instance of
ContractuallyTransferredSafetyResponsibilityState
http://proethica.org/ontology/intermediate#ContractuallyTransferredSafetyResponsibilityState
Active period
From execution of construction contract through construction phase and post-accident review
Affected parties
Client
Contractor
Engineer B
Engineer T
Injured worker
Confidence
0.88
Importance
high
Subject
Engineer T's structural design engagement and relationship to contractor safety obligations
Terminated by
Post-accident legal and ethical review process; deposition proceedings
Triggering event
Execution of standard construction contract provisions assigning sole safety responsibility to contractor, accepted without objection by contractor
Urgency level
medium
Source Evidence
Source text
Contractor shall be solely responsible for the means, methods, techniques, sequences, and procedures of construction

Text references
Contractor shall be solely responsible for the means, methods, techniques, sequences, and procedures of construction
Engineer T relied on the contractor to provide for worker safety during construction, and formally transferred this risk and responsibility via standard contractual language
the contractor accepted the construction risk and responsibility without any question
TTL
@prefix case9: <http://proethica.org/ontology/case/9#> . @prefix owl: <http://www.w3.org/2002/07/owl#> . @prefix proeth: <http://proethica.org/ontology/intermediate#> . @prefix prov: <http://www.w3.org/ns/prov#> . @prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> . @prefix xsd: <http://www.w3.org/2001/XMLSchema#> . case9:Engineer_T_Contractually_Transferred_Safety_Responsibility a proeth:ContractuallyTransferredSafetyResponsibilityState, owl:NamedIndividual ; rdfs:label "Engineer T Contractually Transferred Safety Responsibility" ; proeth:activeperiod "From execution of construction contract through construction phase and post-accident review" ; proeth:affectedparties "Client", "Contractor", "Engineer B", "Engineer T", "Injured worker" ; proeth:conceptCategory "State" ; proeth:confidence "0.88" ; proeth:discoveredincase "9" ; proeth:discoveredinpass "1" ; proeth:discoveredinsection "discussion" ; proeth:firstdiscoveredat "2026-02-24T22:31:53.542364+00:00" ; proeth:firstdiscoveredincase "9" ; proeth:generatedattime "2026-02-24T22:31:53.542364+00:00" ; proeth:importance "high" ; proeth:sourcetext "Contractor shall be solely responsible for the means, methods, techniques, sequences, and procedures of construction" ; proeth:stateclass "Contractually Transferred Safety Responsibility State" ; proeth:subject "Engineer T's structural design engagement and relationship to contractor safety obligations" ; proeth:terminatedby "Post-accident legal and ethical review process; deposition proceedings" ; proeth:textreferences "Contractor shall be solely responsible for the means, methods, techniques, sequences, and procedures of construction", "Engineer T relied on the contractor to provide for worker safety during construction, and formally transferred this risk and responsibility via standard contractual language", "the contractor accepted the construction risk and responsibility without any question" ; proeth:triggeringevent "Execution of standard construction contract provisions assigning sole safety responsibility to contractor, accepted without objection by contractor" ; proeth:urgencylevel "medium" ; proeth:wasattributedto "Case 9 Extraction" ; prov:generatedAtTime "2026-02-24T22:41:24.551350"^^xsd:dateTime ; prov:wasGeneratedBy "ProEthica Case 9 Extraction" .
Metadata
Type
Individual
Last Updated
2026-05-28 23:35
Discovered in case
9
Discovered in pass
1
Discovered in section
discussion
First discovered
2026-02-24T22:31:53.542364+00:00
First case
9
Generated
2026-02-24T22:31:53.542364+00:00
Attributed to
Case 9 Extraction
Generated
2026-02-24T22:41:24.551350
Generated by
ProEthica Case 9 Extraction