NSPE-Code-of-Ethics-Primary
Rs · Resource
Individual
http://proethica.org/ontology/case/89#NSPE-Code-of-Ethics-Primary
Properties
Instance of
Confidence
0.97
Created by
National Society of Professional Engineers
Document title
NSPE Code of Ethics for Engineers
Importance
high
Used by
Engineer A in evaluating professional obligations after client rejection of safety recommendation
Used in context
Primary normative authority governing Engineer A's obligations when the client declines the on-site project representative recommendation due to cost, and Engineer A proceeds with the project despite the identified safety risk during construction.
Version
Current
Source Evidence
Source text
Because of the potentially dangerous nature of implementing the design during the construction phase, Engineer A recommends to the client that a full-time, on-site project representative be hired
Text references
Because of the potentially dangerous nature of implementing the design during the construction phase, Engineer A recommends to the client that a full-time, on-site project representative be hired
Engineer A proceeds with his work on the project
the client indicates to Engineer A that the project would be too costly if such a representative were hired
TTL
@prefix case89: <http://proethica.org/ontology/case/89#> .
@prefix owl: <http://www.w3.org/2002/07/owl#> .
@prefix proeth: <http://proethica.org/ontology/intermediate#> .
@prefix prov: <http://www.w3.org/ns/prov#> .
@prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> .
@prefix xsd: <http://www.w3.org/2001/XMLSchema#> .
case89:NSPE-Code-of-Ethics-Primary a proeth:ProfessionalCode,
owl:NamedIndividual ;
rdfs:label "NSPE-Code-of-Ethics-Primary" ;
proeth:conceptCategory "Resource" ;
proeth:confidence "0.97" ;
proeth:createdby "National Society of Professional Engineers" ;
proeth:discoveredincase "89" ;
proeth:discoveredinpass "1" ;
proeth:discoveredinsection "facts" ;
proeth:documenttitle "NSPE Code of Ethics for Engineers" ;
proeth:firstdiscoveredat "2026-03-01T18:07:06.532223+00:00" ;
proeth:firstdiscoveredincase "89" ;
proeth:generatedattime "2026-03-01T18:07:06.532223+00:00" ;
proeth:importance "high" ;
proeth:resourceclass "Professional Code" ;
proeth:sourcetext "Because of the potentially dangerous nature of implementing the design during the construction phase, Engineer A recommends to the client that a full-time, on-site project representative be hired" ;
proeth:textreferences "Because of the potentially dangerous nature of implementing the design during the construction phase, Engineer A recommends to the client that a full-time, on-site project representative be hired",
"Engineer A proceeds with his work on the project",
"the client indicates to Engineer A that the project would be too costly if such a representative were hired" ;
proeth:usedby "Engineer A in evaluating professional obligations after client rejection of safety recommendation" ;
proeth:usedincontext "Primary normative authority governing Engineer A's obligations when the client declines the on-site project representative recommendation due to cost, and Engineer A proceeds with the project despite the identified safety risk during construction." ;
proeth:version "Current" ;
proeth:wasattributedto "Case 89 Extraction" ;
prov:generatedAtTime "2026-03-01T18:38:27.063020"^^xsd:dateTime ;
prov:wasGeneratedBy "ProEthica Case 89 Extraction" .
Metadata
Extraction details
Discovered in case
89
Discovered in pass
1
Discovered in section
facts
First discovered
2026-03-01T18:07:06.532223+00:00
First case
89
Generated
2026-03-01T18:07:06.532223+00:00
Attributed to
Case 89 Extraction
Generated
2026-03-01T18:38:27.063020
Generated by
ProEthica Case 89 Extraction