Insistence on Client Remedial Action Invoked for On-Site Representative Requirement

P · Principle Individual
http://proethica.org/ontology/case/89#Insistence_on_Client_Remedial_Action_Invoked_for_On-Site_Representative_Requirement
Properties
Instance of
InsistenceonClientRemedialActionorProjectWithdrawalObligation
http://proethica.org/ontology/intermediate#InsistenceonClientRemedialActionorProjectWithdrawalObligation
Applied to
Engineer A's post-notification obligation regarding on-site project representative
Balancing with
Faithful Agent Obligation Within Ethical Limits
Concrete expression
After notifying the client that a full-time on-site project representative was necessary, Engineer A was obligated to insist that the client act on that recommendation — not merely note it and proceed — and upon client refusal, to refuse to continue work on the project
Confidence
0.94
Importance
high
Interpretation
The insistence obligation is triggered by the combination of: (1) a professionally determined safety requirement, (2) client notification, and (3) client refusal — at that point, mere notification is insufficient and the engineer must actively insist or withdraw
Invoked by
NSPE Board of Ethical Review
Tension resolution
Insistence obligation prevails; the faithful agent role does not require the engineer to proceed with work believed to be dangerous
Source Evidence
Source text
Engineer A did not force the issue or insist that a project representative be hired. Instead, Engineer A 'went along' without dissent or comment.

Text references
Engineer A did not force the issue or insist that a project representative be hired
Engineer A should have insisted that the client hire the on-site project representative or refuse to continue to work on the project
TTL
@prefix case89: <http://proethica.org/ontology/case/89#> . @prefix owl: <http://www.w3.org/2002/07/owl#> . @prefix proeth: <http://proethica.org/ontology/intermediate#> . @prefix prov: <http://www.w3.org/ns/prov#> . @prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> . @prefix xsd: <http://www.w3.org/2001/XMLSchema#> . case89:Insistence_on_Client_Remedial_Action_Invoked_for_On-Site_Representative_Requirement a proeth:InsistenceonClientRemedialActionorProjectWithdrawalObligation, owl:NamedIndividual ; rdfs:label "Insistence on Client Remedial Action Invoked for On-Site Representative Requirement" ; proeth:appliedto "Engineer A's post-notification obligation regarding on-site project representative" ; proeth:balancingwith "Faithful Agent Obligation Within Ethical Limits" ; proeth:conceptCategory "Principle" ; proeth:concreteexpression "After notifying the client that a full-time on-site project representative was necessary, Engineer A was obligated to insist that the client act on that recommendation — not merely note it and proceed — and upon client refusal, to refuse to continue work on the project" ; proeth:confidence "0.94" ; proeth:discoveredincase "89" ; proeth:discoveredinpass "2" ; proeth:discoveredinsection "discussion" ; proeth:firstdiscoveredat "2026-03-01T18:14:32.608873+00:00" ; proeth:firstdiscoveredincase "89" ; proeth:generatedattime "2026-03-01T18:14:32.608873+00:00" ; proeth:importance "high" ; proeth:interpretation "The insistence obligation is triggered by the combination of: (1) a professionally determined safety requirement, (2) client notification, and (3) client refusal — at that point, mere notification is insufficient and the engineer must actively insist or withdraw" ; proeth:invokedby "NSPE Board of Ethical Review" ; proeth:principleclass "Insistence on Client Remedial Action or Project Withdrawal Obligation" ; proeth:sourcetext "Engineer A did not force the issue or insist that a project representative be hired. Instead, Engineer A 'went along' without dissent or comment." ; proeth:tensionresolution "Insistence obligation prevails; the faithful agent role does not require the engineer to proceed with work believed to be dangerous" ; proeth:textreferences "Engineer A did not force the issue or insist that a project representative be hired", "Engineer A should have insisted that the client hire the on-site project representative or refuse to continue to work on the project" ; proeth:wasattributedto "Case 89 Extraction" ; prov:generatedAtTime "2026-03-01T18:38:27.071464"^^xsd:dateTime ; prov:wasGeneratedBy "ProEthica Case 89 Extraction" .
Metadata
Type
Individual
Last Updated
2026-05-28 16:26
Discovered in case
89
Discovered in pass
2
Discovered in section
discussion
First discovered
2026-03-01T18:14:32.608873+00:00
First case
89
Generated
2026-03-01T18:14:32.608873+00:00
Attributed to
Case 89 Extraction
Generated
2026-03-01T18:38:27.071464
Generated by
ProEthica Case 89 Extraction