Engineer A Persistent Client Safety Persuasion Before Withdrawal

O · Obligation Individual
http://proethica.org/ontology/case/89#Engineer_A_Persistent_Client_Safety_Persuasion_Before_Withdrawal
Properties
Instance of
PersistentClientSafetyPersuasionBeforeWithdrawalObligation
http://proethica.org/ontology/intermediate#PersistentClientSafetyPersuasionBeforeWithdrawalObligation
Case context
After the client refused the safety staffing recommendation on cost grounds, Engineer A had a duty to persist in persuasion efforts before treating the matter as resolved and proceeding with the project.
Compliance status
unmet
Confidence
0.88
Importance
high
Obligated party
Engineer A
Obligation statement
Engineer A was obligated to continue pursuing substantive discussions with the client — presenting the technical basis for the safety determination, the nature and magnitude of the construction-phase risk, and the consequences of proceeding without a full-time on-site representative — before either withdrawing from the project or proceeding without the recommended safety measure.
Temporal scope
Between the client's cost-driven refusal and any decision to proceed or withdraw
Source Evidence
Source text
After reviewing the completed project plans and costs, the client indicates to Engineer A that the project would be too costly if such a representative were hired.

Text references
After reviewing the completed project plans and costs, the client indicates to Engineer A that the project would be too costly if such a representative were hired.
Engineer A proceeds with his work on the project.
TTL
@prefix case89: <http://proethica.org/ontology/case/89#> . @prefix owl: <http://www.w3.org/2002/07/owl#> . @prefix proeth: <http://proethica.org/ontology/intermediate#> . @prefix proeth-core: <http://proethica.org/ontology/core#> . @prefix prov: <http://www.w3.org/ns/prov#> . @prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> . @prefix xsd: <http://www.w3.org/2001/XMLSchema#> . case89:Engineer_A_Persistent_Client_Safety_Persuasion_Before_Withdrawal a proeth:PersistentClientSafetyPersuasionBeforeWithdrawalObligation, owl:NamedIndividual ; rdfs:label "Engineer A Persistent Client Safety Persuasion Before Withdrawal" ; proeth-core:competesWith case89:Engineer_A_Client_Safety_Violation_Insistence_or_Withdrawal_Obligation ; proeth-core:defeasibleUnder case89:Engineer_A_Obligation_to_Insist_or_Withdraw ; proeth:casecontext "After the client refused the safety staffing recommendation on cost grounds, Engineer A had a duty to persist in persuasion efforts before treating the matter as resolved and proceeding with the project." ; proeth:compliancestatus "unmet" ; proeth:conceptCategory "Obligation" ; proeth:confidence "0.88" ; proeth:derivedFromPrinciple case89:Project_Withdrawal_as_Ethical_Recourse_Invoked_as_Engineer_As_Required_Response ; proeth:discoveredincase "89" ; proeth:discoveredinpass "2" ; proeth:discoveredinsection "facts" ; proeth:firstdiscoveredat "2026-03-01T18:10:57.098840+00:00" ; proeth:firstdiscoveredincase "89" ; proeth:generatedattime "2026-03-01T18:10:57.098840+00:00" ; proeth:importance "high" ; proeth:obligatedparty "Engineer A" ; proeth:obligationclass "Persistent Client Safety Persuasion Before Withdrawal Obligation" ; proeth:obligationstatement "Engineer A was obligated to continue pursuing substantive discussions with the client — presenting the technical basis for the safety determination, the nature and magnitude of the construction-phase risk, and the consequences of proceeding without a full-time on-site representative — before either withdrawing from the project or proceeding without the recommended safety measure." ; proeth:sourcetext "After reviewing the completed project plans and costs, the client indicates to Engineer A that the project would be too costly if such a representative were hired." ; proeth:temporalscope "Between the client's cost-driven refusal and any decision to proceed or withdraw" ; proeth:textreferences "After reviewing the completed project plans and costs, the client indicates to Engineer A that the project would be too costly if such a representative were hired.", "Engineer A proceeds with his work on the project." ; proeth:wasattributedto "Case 89 Extraction" ; prov:generatedAtTime "2026-03-01T18:38:27.068196"^^xsd:dateTime ; prov:wasGeneratedBy "ProEthica Case 89 Extraction" .
Metadata
Type
Individual
Last Updated
2026-05-28 16:26
Discovered in case
89
Discovered in pass
2
Discovered in section
facts
First discovered
2026-03-01T18:10:57.098840+00:00
First case
89
Generated
2026-03-01T18:10:57.098840+00:00
Attributed to
Case 89 Extraction
Generated
2026-03-01T18:38:27.068196
Generated by
ProEthica Case 89 Extraction