Engineer A Dangerous Project Full-Time Representative Recommendation
S · State
Individual
http://proethica.org/ontology/case/89#Engineer_A_Dangerous_Project_Full-Time_Representative_Recommendation
Properties
Instance of
ConfirmedRiskWithoutAdequateSafeguardsState
http://proethica.org/ontology/intermediate#ConfirmedRiskWithoutAdequateSafeguardsState
Active period
From Engineer A's professional determination through client refusal and Engineer A's acquiescence to proceed
Affected parties
Client
Construction workers
Engineer A
General Public
Confidence
0.95
Importance
high
Subject
Construction project requiring full-time on-site project representative due to dangerous nature
Terminated by
Not resolved — Engineer A proceeded without the safeguard remaining in place
Triggering event
Engineer A's professional judgment that the dangerous nature of the project necessitated a full-time on-site project representative during construction
Urgency level
high
Source Evidence
Source text
Engineer A made a professional judgment based upon education, expertise, and experience that a full-time, on-site project representative would be necessary during the construction phase of the project because of the dangerous nature of the project
Text references
Engineer A believed that to proceed, without an on-site project representative, would be potentially dangerous
Engineer A made a professional judgment based upon education, expertise, and experience that a full-time, on-site project representative would be necessary during the construction phase of the project because of the dangerous nature of the project
TTL
@prefix case89: <http://proethica.org/ontology/case/89#> .
@prefix owl: <http://www.w3.org/2002/07/owl#> .
@prefix proeth: <http://proethica.org/ontology/intermediate#> .
@prefix prov: <http://www.w3.org/ns/prov#> .
@prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> .
@prefix xsd: <http://www.w3.org/2001/XMLSchema#> .
case89:Engineer_A_Dangerous_Project_Full-Time_Representative_Recommendation a proeth:ConfirmedRiskWithoutAdequateSafeguardsState,
owl:NamedIndividual ;
rdfs:label "Engineer A Dangerous Project Full-Time Representative Recommendation" ;
proeth:activeperiod "From Engineer A's professional determination through client refusal and Engineer A's acquiescence to proceed" ;
proeth:affectedparties "Client",
"Construction workers",
"Engineer A",
"General Public" ;
proeth:conceptCategory "State" ;
proeth:confidence "0.95" ;
proeth:discoveredincase "89" ;
proeth:discoveredinpass "1" ;
proeth:discoveredinsection "discussion" ;
proeth:firstdiscoveredat "2026-03-01T18:08:00.591720+00:00" ;
proeth:firstdiscoveredincase "89" ;
proeth:generatedattime "2026-03-01T18:08:00.591720+00:00" ;
proeth:importance "high" ;
proeth:sourcetext "Engineer A made a professional judgment based upon education, expertise, and experience that a full-time, on-site project representative would be necessary during the construction phase of the project because of the dangerous nature of the project" ;
proeth:stateclass "Confirmed Risk Without Adequate Safeguards State" ;
proeth:subject "Construction project requiring full-time on-site project representative due to dangerous nature" ;
proeth:terminatedby "Not resolved — Engineer A proceeded without the safeguard remaining in place" ;
proeth:textreferences "Engineer A believed that to proceed, without an on-site project representative, would be potentially dangerous",
"Engineer A made a professional judgment based upon education, expertise, and experience that a full-time, on-site project representative would be necessary during the construction phase of the project because of the dangerous nature of the project" ;
proeth:triggeringevent "Engineer A's professional judgment that the dangerous nature of the project necessitated a full-time on-site project representative during construction" ;
proeth:urgencylevel "high" ;
proeth:wasattributedto "Case 89 Extraction" ;
prov:generatedAtTime "2026-03-01T18:38:27.065854"^^xsd:dateTime ;
prov:wasGeneratedBy "ProEthica Case 89 Extraction" .
Metadata
Extraction details
Discovered in case
89
Discovered in pass
1
Discovered in section
discussion
First discovered
2026-03-01T18:08:00.591720+00:00
First case
89
Generated
2026-03-01T18:08:00.591720+00:00
Attributed to
Case 89 Extraction
Generated
2026-03-01T18:38:27.065854
Generated by
ProEthica Case 89 Extraction