Dangerous Construction Phase Risk Identified

S · State Individual
http://proethica.org/ontology/case/89#Dangerous_Construction_Phase_Risk_Identified
Properties
Instance of
PublicSafetyatRisk
http://proethica.org/ontology/intermediate#PublicSafetyatRisk
Active period
From Engineer A's identification of the dangerous nature of implementation through project construction
Affected parties
Client
Construction workers
Engineer A
Public
Confidence
0.95
Importance
high
Subject
Construction phase implementation of the design, posing danger to workers and/or public
Terminated by
Adequate safety oversight measures implemented, or project completion
Triggering event
Engineer A identifies the potentially dangerous nature of implementing the design during the construction phase
Urgency level
high
Source Evidence
Source text
Because of the potentially dangerous nature of implementing the design during the construction phase, Engineer A recommends to the client that a full-time, on-site project representative be hired for the project

Text references
Because of the potentially dangerous nature of implementing the design during the construction phase, Engineer A recommends to the client that a full-time, on-site project representative be hired for the project
TTL
@prefix case89: <http://proethica.org/ontology/case/89#> . @prefix owl: <http://www.w3.org/2002/07/owl#> . @prefix proeth: <http://proethica.org/ontology/intermediate#> . @prefix prov: <http://www.w3.org/ns/prov#> . @prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> . @prefix xsd: <http://www.w3.org/2001/XMLSchema#> . case89:Dangerous_Construction_Phase_Risk_Identified a proeth:PublicSafetyatRisk, owl:NamedIndividual ; rdfs:label "Dangerous Construction Phase Risk Identified" ; proeth:activeperiod "From Engineer A's identification of the dangerous nature of implementation through project construction" ; proeth:affectedparties "Client", "Construction workers", "Engineer A", "Public" ; proeth:conceptCategory "State" ; proeth:confidence "0.95" ; proeth:discoveredincase "89" ; proeth:discoveredinpass "1" ; proeth:discoveredinsection "facts" ; proeth:firstdiscoveredat "2026-03-01T18:07:12.075933+00:00" ; proeth:firstdiscoveredincase "89" ; proeth:generatedattime "2026-03-01T18:07:12.075933+00:00" ; proeth:importance "high" ; proeth:sourcetext "Because of the potentially dangerous nature of implementing the design during the construction phase, Engineer A recommends to the client that a full-time, on-site project representative be hired for the project" ; proeth:stateclass "Public Safety at Risk" ; proeth:subject "Construction phase implementation of the design, posing danger to workers and/or public" ; proeth:terminatedby "Adequate safety oversight measures implemented, or project completion" ; proeth:textreferences "Because of the potentially dangerous nature of implementing the design during the construction phase, Engineer A recommends to the client that a full-time, on-site project representative be hired for the project" ; proeth:triggeringevent "Engineer A identifies the potentially dangerous nature of implementing the design during the construction phase" ; proeth:urgencylevel "high" ; proeth:wasattributedto "Case 89 Extraction" ; prov:generatedAtTime "2026-03-01T18:38:27.064180"^^xsd:dateTime ; prov:wasGeneratedBy "ProEthica Case 89 Extraction" .
Metadata
Type
Individual
Last Updated
2026-05-28 16:26
Discovered in case
89
Discovered in pass
1
Discovered in section
facts
First discovered
2026-03-01T18:07:12.075933+00:00
First case
89
Generated
2026-03-01T18:07:12.075933+00:00
Attributed to
Case 89 Extraction
Generated
2026-03-01T18:38:27.064180
Generated by
ProEthica Case 89 Extraction