Construction-Safety-Knowledge-Standard-Instance

Rs · Resource Individual
http://proethica.org/ontology/case/89#Construction-Safety-Knowledge-Standard-Instance
Properties
Instance of
ConstructionSafetyKnowledgeStandard
http://proethica.org/ontology/intermediate#ConstructionSafetyKnowledgeStandard
Confidence
0.85
Created by
Professional engineering standards bodies
Document title
Construction Safety Knowledge Standard
Importance
medium
Used by
Engineer A in identifying and communicating the dangerous nature of implementing the design during construction
Used in context
Establishes the professional baseline for what Engineer A is expected to know and communicate regarding construction-phase safety risks, including the recognized need for on-site oversight when a design involves potentially dangerous implementation conditions.
Version
Current
Source Evidence
Source text
Because of the potentially dangerous nature of implementing the design during the construction phase, Engineer A recommends to the client that a full-time, on-site project representative be hired for the project

Text references
Because of the potentially dangerous nature of implementing the design during the construction phase, Engineer A recommends to the client that a full-time, on-site project representative be hired for the project
TTL
@prefix case89: <http://proethica.org/ontology/case/89#> . @prefix owl: <http://www.w3.org/2002/07/owl#> . @prefix proeth: <http://proethica.org/ontology/intermediate#> . @prefix prov: <http://www.w3.org/ns/prov#> . @prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> . @prefix xsd: <http://www.w3.org/2001/XMLSchema#> . case89:Construction-Safety-Knowledge-Standard-Instance a proeth:ConstructionSafetyKnowledgeStandard, owl:NamedIndividual ; rdfs:label "Construction-Safety-Knowledge-Standard-Instance" ; proeth:conceptCategory "Resource" ; proeth:confidence "0.85" ; proeth:createdby "Professional engineering standards bodies" ; proeth:discoveredincase "89" ; proeth:discoveredinpass "1" ; proeth:discoveredinsection "facts" ; proeth:documenttitle "Construction Safety Knowledge Standard" ; proeth:firstdiscoveredat "2026-03-01T18:07:06.532223+00:00" ; proeth:firstdiscoveredincase "89" ; proeth:generatedattime "2026-03-01T18:07:06.532223+00:00" ; proeth:importance "medium" ; proeth:resourceclass "Construction Safety Knowledge Standard" ; proeth:sourcetext "Because of the potentially dangerous nature of implementing the design during the construction phase, Engineer A recommends to the client that a full-time, on-site project representative be hired for the project" ; proeth:textreferences "Because of the potentially dangerous nature of implementing the design during the construction phase, Engineer A recommends to the client that a full-time, on-site project representative be hired for the project" ; proeth:usedby "Engineer A in identifying and communicating the dangerous nature of implementing the design during construction" ; proeth:usedincontext "Establishes the professional baseline for what Engineer A is expected to know and communicate regarding construction-phase safety risks, including the recognized need for on-site oversight when a design involves potentially dangerous implementation conditions." ; proeth:version "Current" ; proeth:wasattributedto "Case 89 Extraction" ; prov:generatedAtTime "2026-03-01T18:38:27.063295"^^xsd:dateTime ; prov:wasGeneratedBy "ProEthica Case 89 Extraction" .
Metadata
Type
Individual
Last Updated
2026-05-28 16:26
Discovered in case
89
Discovered in pass
1
Discovered in section
facts
First discovered
2026-03-01T18:07:06.532223+00:00
First case
89
Generated
2026-03-01T18:07:06.532223+00:00
Attributed to
Case 89 Extraction
Generated
2026-03-01T18:38:27.063295
Generated by
ProEthica Case 89 Extraction