Confirmed Construction Risk Without Adequate Safeguards

S · State Individual
http://proethica.org/ontology/case/89#Confirmed_Construction_Risk_Without_Adequate_Safeguards
Properties
Instance of
ConfirmedRiskWithoutAdequateSafeguardsState
http://proethica.org/ontology/intermediate#ConfirmedRiskWithoutAdequateSafeguardsState
Active period
From client's refusal of the safety representative through project construction
Affected parties
Client
Construction workers
Engineer A
Public
Confidence
0.95
Importance
high
Subject
Active construction-phase danger identified by Engineer A, with client having refused the recommended protective measure
Terminated by
Client reversal, Engineer A disassociation, or alternative safeguard implementation
Triggering event
Client refuses to hire on-site representative despite Engineer A's documented safety recommendation
Urgency level
high
Source Evidence
Source text
Because of the potentially dangerous nature of implementing the design during the construction phase, Engineer A recommends to the client that a full-time, on-site project representative be hired

Text references
Because of the potentially dangerous nature of implementing the design during the construction phase, Engineer A recommends to the client that a full-time, on-site project representative be hired
the client indicates to Engineer A that the project would be too costly if such a representative were hired
TTL
@prefix case89: <http://proethica.org/ontology/case/89#> . @prefix owl: <http://www.w3.org/2002/07/owl#> . @prefix proeth: <http://proethica.org/ontology/intermediate#> . @prefix prov: <http://www.w3.org/ns/prov#> . @prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> . @prefix xsd: <http://www.w3.org/2001/XMLSchema#> . case89:Confirmed_Construction_Risk_Without_Adequate_Safeguards a proeth:ConfirmedRiskWithoutAdequateSafeguardsState, owl:NamedIndividual ; rdfs:label "Confirmed Construction Risk Without Adequate Safeguards" ; proeth:activeperiod "From client's refusal of the safety representative through project construction" ; proeth:affectedparties "Client", "Construction workers", "Engineer A", "Public" ; proeth:conceptCategory "State" ; proeth:confidence "0.95" ; proeth:discoveredincase "89" ; proeth:discoveredinpass "1" ; proeth:discoveredinsection "facts" ; proeth:firstdiscoveredat "2026-03-01T18:07:12.075933+00:00" ; proeth:firstdiscoveredincase "89" ; proeth:generatedattime "2026-03-01T18:07:12.075933+00:00" ; proeth:importance "high" ; proeth:sourcetext "Because of the potentially dangerous nature of implementing the design during the construction phase, Engineer A recommends to the client that a full-time, on-site project representative be hired" ; proeth:stateclass "Confirmed Risk Without Adequate Safeguards State" ; proeth:subject "Active construction-phase danger identified by Engineer A, with client having refused the recommended protective measure" ; proeth:terminatedby "Client reversal, Engineer A disassociation, or alternative safeguard implementation" ; proeth:textreferences "Because of the potentially dangerous nature of implementing the design during the construction phase, Engineer A recommends to the client that a full-time, on-site project representative be hired", "the client indicates to Engineer A that the project would be too costly if such a representative were hired" ; proeth:triggeringevent "Client refuses to hire on-site representative despite Engineer A's documented safety recommendation" ; proeth:urgencylevel "high" ; proeth:wasattributedto "Case 89 Extraction" ; prov:generatedAtTime "2026-03-01T18:38:27.064481"^^xsd:dateTime ; prov:wasGeneratedBy "ProEthica Case 89 Extraction" .
Metadata
Type
Individual
Last Updated
2026-05-28 16:26
Discovered in case
89
Discovered in pass
1
Discovered in section
facts
First discovered
2026-03-01T18:07:12.075933+00:00
First case
89
Generated
2026-03-01T18:07:12.075933+00:00
Attributed to
Case 89 Extraction
Generated
2026-03-01T18:38:27.064481
Generated by
ProEthica Case 89 Extraction