Client Cost-Objecting Safety Staffing Refusing Client
R · Role
Individual
http://proethica.org/ontology/case/89#Client_Cost-Objecting_Safety_Staffing_Refusing_Client
Definition
The client retained Engineer A for engineering services on a dangerous construction project, was advised that a full-time on-site project representative was required for safety, and refused to authorize the measure on cost grounds — thereby pressuring Engineer A to abandon the safety recommendation.
Properties
Instance of
Cost-ObjectingSafetyStaffingRefusingClient
http://proethica.org/ontology/intermediate#Cost-ObjectingSafetyStaffingRefusingClient
Attributes
| concern | Project cost |
| decision | Refused to hire full-time on-site project representative |
| project_nature | Dangerous construction project |
Confidence
0.95
Importance
high
Relationships
| type | retains |
| target | Engineer A Construction Phase Safety Recommendation Abandoning Engineer |
Role category
provider_client
Source Evidence
Source text
when the client indicated that the project would be too costly if a full-time, on-site project representative were hired
Text references
Engineer A did notify the client of the need to hire a full-time, on-site project representative for the construction phase of the project
cost concerns were raised by the client
when the client indicated that the project would be too costly if a full-time, on-site project representative were hired
TTL
@prefix case89: <http://proethica.org/ontology/case/89#> .
@prefix owl: <http://www.w3.org/2002/07/owl#> .
@prefix proeth: <http://proethica.org/ontology/intermediate#> .
@prefix prov: <http://www.w3.org/ns/prov#> .
@prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> .
@prefix xsd: <http://www.w3.org/2001/XMLSchema#> .
case89:Client_Cost-Objecting_Safety_Staffing_Refusing_Client a proeth:Cost-ObjectingSafetyStaffingRefusingClient,
owl:NamedIndividual ;
rdfs:label "Client Cost-Objecting Safety Staffing Refusing Client" ;
proeth:attributes "{'concern': 'Project cost', 'decision': 'Refused to hire full-time on-site project representative', 'project_nature': 'Dangerous construction project'}" ;
proeth:caseinvolvement "The client retained Engineer A for engineering services on a dangerous construction project, was advised that a full-time on-site project representative was required for safety, and refused to authorize the measure on cost grounds — thereby pressuring Engineer A to abandon the safety recommendation." ;
proeth:conceptCategory "Role" ;
proeth:confidence "0.95" ;
proeth:discoveredincase "89" ;
proeth:discoveredinpass "1" ;
proeth:discoveredinsection "discussion" ;
proeth:firstdiscoveredat "2026-03-01T18:07:39.079460+00:00" ;
proeth:firstdiscoveredincase "89" ;
proeth:generatedattime "2026-03-01T18:07:39.079460+00:00" ;
proeth:importance "high" ;
proeth:relationships "{'type': 'retains', 'target': 'Engineer A Construction Phase Safety Recommendation Abandoning Engineer'}" ;
proeth:rolecategory "provider_client" ;
proeth:roleclass "Cost-Objecting Safety Staffing Refusing Client" ;
proeth:sourcetext "when the client indicated that the project would be too costly if a full-time, on-site project representative were hired" ;
proeth:textreferences "Engineer A did notify the client of the need to hire a full-time, on-site project representative for the construction phase of the project",
"cost concerns were raised by the client",
"when the client indicated that the project would be too costly if a full-time, on-site project representative were hired" ;
proeth:wasattributedto "Case 89 Extraction" ;
prov:generatedAtTime "2026-03-01T18:38:27.064949"^^xsd:dateTime ;
prov:wasGeneratedBy "ProEthica Case 89 Extraction" .
Metadata
Extraction details
Discovered in case
89
Discovered in pass
1
Discovered in section
discussion
First discovered
2026-03-01T18:07:39.079460+00:00
First case
89
Generated
2026-03-01T18:07:39.079460+00:00
Attributed to
Case 89 Extraction
Generated
2026-03-01T18:38:27.064949
Generated by
ProEthica Case 89 Extraction