Third-Party Flood Risk Community Notification Obligation Invoked for Upstream Neighborhood

P · Principle Individual
http://proethica.org/ontology/case/88#Third-Party_Flood_Risk_Community_Notification_Obligation_Invoked_for_Upstream_Neighborhood
Properties
Instance of
Third-PartyFloodRiskCommunityNotificationObligation
http://proethica.org/ontology/intermediate#Third-PartyFloodRiskCommunityNotificationObligation
Applied to
Local Permitting Regulatory Authority
Upstream Neighborhood Twenty Homes Community
Balancing with
Client Loyalty
Client confidentiality
Concrete expression
Engineer A must ensure that the upstream residential community of approximately twenty homes is informed of the identified flood risk through either direct notification or through formal written reports submitted to regulatory agencies for public consideration
Confidence
0.88
Importance
high
Interpretation
The obligation to notify affected third parties is discharged through the formal regulatory report mechanism proposed in the graduated escalation sequence — the report to regulatory agencies serves as the vehicle for community notification
Invoked by
Engineer A Tidal Crossing Infrastructure Design Engineer
Tension resolution
The third-party notification obligation overrides client preferences about information disclosure when identifiable community members face material flood risk from the proposed project
Source Evidence
Source text
Engineer A should propose to Client B that engineer a provides the potential concern that may necessitate more detailed evaluation in an engineering report for consideration by regulatory agencies and the public.

Text references
Engineer A should engage Client B in discussions about the need for the detailed evaluation and disclosure of the potential impacts on the public and alternatives for the project to mitigate those impacts
Engineer A should propose to Client B that engineer a provides the potential concern that may necessitate more detailed evaluation in an engineering report for consideration by regulatory agencies and the public.
TTL
@prefix case88: <http://proethica.org/ontology/case/88#> . @prefix owl: <http://www.w3.org/2002/07/owl#> . @prefix proeth: <http://proethica.org/ontology/intermediate#> . @prefix prov: <http://www.w3.org/ns/prov#> . @prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> . @prefix xsd: <http://www.w3.org/2001/XMLSchema#> . case88:Third-Party_Flood_Risk_Community_Notification_Obligation_Invoked_for_Upstream_Neighborhood a proeth:Third-PartyFloodRiskCommunityNotificationObligation, owl:NamedIndividual ; rdfs:label "Third-Party Flood Risk Community Notification Obligation Invoked for Upstream Neighborhood" ; proeth:appliedto "Local Permitting Regulatory Authority", "Upstream Neighborhood Twenty Homes Community" ; proeth:balancingwith "Client Loyalty", "Client confidentiality" ; proeth:conceptCategory "Principle" ; proeth:concreteexpression "Engineer A must ensure that the upstream residential community of approximately twenty homes is informed of the identified flood risk through either direct notification or through formal written reports submitted to regulatory agencies for public consideration" ; proeth:confidence "0.88" ; proeth:discoveredincase "88" ; proeth:discoveredinpass "2" ; proeth:discoveredinsection "discussion" ; proeth:firstdiscoveredat "2026-02-26T00:19:27.254437+00:00" ; proeth:firstdiscoveredincase "88" ; proeth:generatedattime "2026-02-26T00:19:27.254437+00:00" ; proeth:importance "high" ; proeth:interpretation "The obligation to notify affected third parties is discharged through the formal regulatory report mechanism proposed in the graduated escalation sequence — the report to regulatory agencies serves as the vehicle for community notification" ; proeth:invokedby "Engineer A Tidal Crossing Infrastructure Design Engineer" ; proeth:principleclass "Third-Party Flood Risk Community Notification Obligation" ; proeth:sourcetext "Engineer A should propose to Client B that engineer a provides the potential concern that may necessitate more detailed evaluation in an engineering report for consideration by regulatory agencies and the public." ; proeth:tensionresolution "The third-party notification obligation overrides client preferences about information disclosure when identifiable community members face material flood risk from the proposed project" ; proeth:textreferences "Engineer A should engage Client B in discussions about the need for the detailed evaluation and disclosure of the potential impacts on the public and alternatives for the project to mitigate those impacts", "Engineer A should propose to Client B that engineer a provides the potential concern that may necessitate more detailed evaluation in an engineering report for consideration by regulatory agencies and the public." ; proeth:wasattributedto "Case 88 Extraction" ; prov:generatedAtTime "2026-02-26T00:31:11.071090"^^xsd:dateTime ; prov:wasGeneratedBy "ProEthica Case 88 Extraction" .
Metadata
Type
Individual
Last Updated
2026-05-28 16:26
Discovered in case
88
Discovered in pass
2
Discovered in section
discussion
First discovered
2026-02-26T00:19:27.254437+00:00
First case
88
Generated
2026-02-26T00:19:27.254437+00:00
Attributed to
Case 88 Extraction
Generated
2026-02-26T00:31:11.071090
Generated by
ProEthica Case 88 Extraction