Foreseeable Third-Party Flooding Harm from Hydraulic Capacity Increase

S · State Individual
http://proethica.org/ontology/case/88#Foreseeable_Third-Party_Flooding_Harm_from_Hydraulic_Capacity_Increase
Properties
Instance of
ForeseeableThird-PartyHarmfromHydraulicCapacityIncreaseState
http://proethica.org/ontology/intermediate#ForeseeableThird-PartyHarmfromHydraulicCapacityIncreaseState
Active period
From Engineer A's professional assessment of the flooding risk through resolution of the project
Affected parties
Client B
Engineer A
Regulatory agencies
Third-party residential property owners
Confidence
0.91
Importance
high
Subject
The foreseeable risk of flooding damage to upstream or downstream third-party residential properties resulting from the proposed hydraulic capacity increase at the tidal crossing
Terminated by
Completion of detailed climate impact evaluation confirming or refuting the risk, or Engineer A's withdrawal from the project
Triggering event
Engineer A's professional evaluation identifying sufficient potential for flooding of other properties to merit detailed, complex evaluation of future conditions under projected climate change
Urgency level
high
Source Evidence
Source text
Engineer A needs to have sufficient understanding of hydrology, hydraulics, and coastal modeling to form a reasonable judgment that there is sufficient potential for flooding of other properties to merit a detailed, complex evaluation of future conditions

Text references
Engineer A needs to have sufficient understanding of hydrology, hydraulics, and coastal modeling to form a reasonable judgment that there is sufficient potential for flooding of other properties to merit a detailed, complex evaluation of future conditions
Engineer A should engage Client B in discussions about the need for the detailed evaluation and disclosure of the potential impacts on the public and alternatives for the project to mitigate those impacts
TTL
@prefix case88: <http://proethica.org/ontology/case/88#> . @prefix owl: <http://www.w3.org/2002/07/owl#> . @prefix proeth: <http://proethica.org/ontology/intermediate#> . @prefix prov: <http://www.w3.org/ns/prov#> . @prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> . @prefix xsd: <http://www.w3.org/2001/XMLSchema#> . case88:Foreseeable_Third-Party_Flooding_Harm_from_Hydraulic_Capacity_Increase a proeth:ForeseeableThird-PartyHarmfromHydraulicCapacityIncreaseState, owl:NamedIndividual ; rdfs:label "Foreseeable Third-Party Flooding Harm from Hydraulic Capacity Increase" ; proeth:activeperiod "From Engineer A's professional assessment of the flooding risk through resolution of the project" ; proeth:affectedparties "Client B", "Engineer A", "Regulatory agencies", "Third-party residential property owners" ; proeth:conceptCategory "State" ; proeth:confidence "0.91" ; proeth:discoveredincase "88" ; proeth:discoveredinpass "1" ; proeth:discoveredinsection "discussion" ; proeth:firstdiscoveredat "2026-02-26T00:10:17.210310+00:00" ; proeth:firstdiscoveredincase "88" ; proeth:generatedattime "2026-02-26T00:10:17.210310+00:00" ; proeth:importance "high" ; proeth:sourcetext "Engineer A needs to have sufficient understanding of hydrology, hydraulics, and coastal modeling to form a reasonable judgment that there is sufficient potential for flooding of other properties to merit a detailed, complex evaluation of future conditions" ; proeth:stateclass "Foreseeable Third-Party Harm from Hydraulic Capacity Increase State" ; proeth:subject "The foreseeable risk of flooding damage to upstream or downstream third-party residential properties resulting from the proposed hydraulic capacity increase at the tidal crossing" ; proeth:terminatedby "Completion of detailed climate impact evaluation confirming or refuting the risk, or Engineer A's withdrawal from the project" ; proeth:textreferences "Engineer A needs to have sufficient understanding of hydrology, hydraulics, and coastal modeling to form a reasonable judgment that there is sufficient potential for flooding of other properties to merit a detailed, complex evaluation of future conditions", "Engineer A should engage Client B in discussions about the need for the detailed evaluation and disclosure of the potential impacts on the public and alternatives for the project to mitigate those impacts" ; proeth:triggeringevent "Engineer A's professional evaluation identifying sufficient potential for flooding of other properties to merit detailed, complex evaluation of future conditions under projected climate change" ; proeth:urgencylevel "high" ; proeth:wasattributedto "Case 88 Extraction" ; prov:generatedAtTime "2026-02-26T00:31:11.061248"^^xsd:dateTime ; prov:wasGeneratedBy "ProEthica Case 88 Extraction" .
Metadata
Type
Individual
Last Updated
2026-05-28 16:26
Discovered in case
88
Discovered in pass
1
Discovered in section
discussion
First discovered
2026-02-26T00:10:17.210310+00:00
First case
88
Generated
2026-02-26T00:10:17.210310+00:00
Attributed to
Case 88 Extraction
Generated
2026-02-26T00:31:11.061248
Generated by
ProEthica Case 88 Extraction