Engineer A Tidal Saltmarsh Environmental Impact Assessment Tidal Crossing
O · Obligation
Individual
http://proethica.org/ontology/case/88#Engineer_A_Tidal_Saltmarsh_Environmental_Impact_Assessment_Tidal_Crossing
Properties
Instance of
TidalSaltmarshEnvironmentalImpactAssessmentObligation
http://proethica.org/ontology/intermediate#TidalSaltmarshEnvironmentalImpactAssessmentObligation
Case context
The tidal crossing upgrade from culvert to bridge in a tidal saltmarsh implicates environmental stewardship obligations regarding the ecological integrity of the saltmarsh, in addition to the flood risk obligations regarding upstream homeowners.
Compliance status
unclear
Confidence
0.85
Importance
medium
Obligated party
Engineer A
Obligation statement
Engineer A is obligated to assess and disclose the hydraulic and ecological impacts of the culvert-to-bridge upgrade on the tidal saltmarsh environment, including the effects of increased hydraulic capacity on tidal flow patterns, saltwater intrusion, and marsh ecosystem integrity, as part of the design and permitting process.
Temporal scope
During the design and local permitting process for the tidal crossing upgrade
Relationships
defeasibleUnder
Environmental Hazard - Tidal Saltmarsh Crossing
derivedFromPrinciple
Environmental Stewardship Invoked in Tidal Saltmarsh Crossing Design
Source Evidence
Source text
Engineer A is a consulting engineer representing Client B, a developer who is proposing to develop a health care facility that requires a significant upgrade to the property's access road that crosses a tidal saltmarsh.
Text references
Engineer A is a consulting engineer representing Client B, a developer who is proposing to develop a health care facility that requires a significant upgrade to the property's access road that crosses a tidal saltmarsh.
Engineer A's scope includes design and local permitting of the roadway, including an upgrade of the tidal crossing from a small culvert to a small bridge, increasing its hydraulic capacity.
TTL
@prefix case88: <http://proethica.org/ontology/case/88#> .
@prefix owl: <http://www.w3.org/2002/07/owl#> .
@prefix proeth: <http://proethica.org/ontology/intermediate#> .
@prefix proeth-core: <http://proethica.org/ontology/core#> .
@prefix prov: <http://www.w3.org/ns/prov#> .
@prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> .
@prefix xsd: <http://www.w3.org/2001/XMLSchema#> .
case88:Engineer_A_Tidal_Saltmarsh_Environmental_Impact_Assessment_Tidal_Crossing a proeth:TidalSaltmarshEnvironmentalImpactAssessmentObligation,
owl:NamedIndividual ;
rdfs:label "Engineer A Tidal Saltmarsh Environmental Impact Assessment Tidal Crossing" ;
proeth-core:defeasibleUnder case88:Environmental_Hazard_-_Tidal_Saltmarsh_Crossing ;
proeth:casecontext "The tidal crossing upgrade from culvert to bridge in a tidal saltmarsh implicates environmental stewardship obligations regarding the ecological integrity of the saltmarsh, in addition to the flood risk obligations regarding upstream homeowners." ;
proeth:compliancestatus "unclear" ;
proeth:conceptCategory "Obligation" ;
proeth:confidence "0.85" ;
proeth:derivedFromPrinciple case88:Environmental_Stewardship_Invoked_in_Tidal_Saltmarsh_Crossing_Design ;
proeth:discoveredincase "88" ;
proeth:discoveredinpass "2" ;
proeth:discoveredinsection "facts" ;
proeth:firstdiscoveredat "2026-02-27T14:13:00.331319+00:00" ;
proeth:firstdiscoveredincase "88" ;
proeth:generatedattime "2026-02-27T14:13:00.331319+00:00" ;
proeth:importance "medium" ;
proeth:obligatedparty "Engineer A" ;
proeth:obligationclass "Tidal Saltmarsh Environmental Impact Assessment Obligation" ;
proeth:obligationstatement "Engineer A is obligated to assess and disclose the hydraulic and ecological impacts of the culvert-to-bridge upgrade on the tidal saltmarsh environment, including the effects of increased hydraulic capacity on tidal flow patterns, saltwater intrusion, and marsh ecosystem integrity, as part of the design and permitting process." ;
proeth:sourcetext "Engineer A is a consulting engineer representing Client B, a developer who is proposing to develop a health care facility that requires a significant upgrade to the property's access road that crosses a tidal saltmarsh." ;
proeth:temporalscope "During the design and local permitting process for the tidal crossing upgrade" ;
proeth:textreferences "Engineer A is a consulting engineer representing Client B, a developer who is proposing to develop a health care facility that requires a significant upgrade to the property's access road that crosses a tidal saltmarsh.",
"Engineer A's scope includes design and local permitting of the roadway, including an upgrade of the tidal crossing from a small culvert to a small bridge, increasing its hydraulic capacity." ;
proeth:wasattributedto "Case 88 Extraction" ;
prov:generatedAtTime "2026-02-28T10:32:26.857939"^^xsd:dateTime ;
prov:wasGeneratedBy "ProEthica Case 88 Extraction" .
Metadata
Extraction details
Discovered in case
88
Discovered in pass
2
Discovered in section
facts
First discovered
2026-02-27T14:13:00.331319+00:00
First case
88
Generated
2026-02-27T14:13:00.331319+00:00
Attributed to
Case 88 Extraction
Generated
2026-02-28T10:32:26.857939
Generated by
ProEthica Case 88 Extraction